Power China has begun construction of the world’s only 200MW Tower CSP – SolarPACES

by Baselines_shift

1 comment
  1. What makes this an interesting experiment – 200 MW means a larger solar field of mirrors:

    # “Tower CSP is typically built at up to 100 MW to avoid attenuating the the reflected sunlight thus weakening the heat flux available at the receiver, due to the distance that reflected light must travel to the solar receiver on the tower from the farthest outlying solar mirrors.”

Leave a Reply