Satellite image shows plans for vast new solar farm in US https://www.newsweek.com/billion-dollar-solar-farm-planned-wyoming-1899773 by Maxcactus Tags:Energy 1 comment This project does not exist any Generation Interconnection queue for any of the three transmission operators in the area. >construction commence in March 2025 I hope they have a time machine. If they’re looking to start construction in 2025, they should have applied for generation interconnection in 2020. Leave a ReplyYou must be logged in to post a comment.
This project does not exist any Generation Interconnection queue for any of the three transmission operators in the area. >construction commence in March 2025 I hope they have a time machine. If they’re looking to start construction in 2025, they should have applied for generation interconnection in 2020.
1 comment
This project does not exist any Generation Interconnection queue for any of the three transmission operators in the area.
>construction commence in March 2025
I hope they have a time machine. If they’re looking to start construction in 2025, they should have applied for generation interconnection in 2020.