Finally, some good news from my province. https://www.cbc.ca/news/canada/nova-scotia/nsp-battery-storage-system-approved-1.7235197 by TheSuper200 Tags:Energy 1 comment >All three 50-megawatt lithium ion batteries are supposed to be operational by 2026. I assume these are 4 hour duration. 600 MWh. Leave a ReplyYou must be logged in to post a comment.
>All three 50-megawatt lithium ion batteries are supposed to be operational by 2026. I assume these are 4 hour duration. 600 MWh.
1 comment
>All three 50-megawatt lithium ion batteries are supposed to be operational by 2026.
I assume these are 4 hour duration. 600 MWh.