Finally, some good news from my province.

https://www.cbc.ca/news/canada/nova-scotia/nsp-battery-storage-system-approved-1.7235197

by TheSuper200

1 comment
  1. >All three 50-megawatt lithium ion batteries are supposed to be operational by 2026.

    I assume these are 4 hour duration. 600 MWh.

Leave a Reply