China PV EPCs contracts at 2-3RMB/W

https://x.com/pretentiouswhat/status/1813083656984142073

by yazriel0

1 comment
  1. If i undersstand correctly, EPC includes engineering, construction and components.

    2024 bids are awarded at 2-3RMB $400-$300/KW with the low end in large remote projects or the mega-zones

Leave a Reply