There was a video on YouTube that did a fly thru of the proposed new route thro the deeside industrial estate, roundabouts removed, over the new bridge and up to the A55 at the services. I can’t find it now.
They should be using the other bridge further down river and link it to the A55.
The bridge that doesn’t go anywhere. What a waste of money that was.
Found the link it’s called the red route and by far and away the best option. But it’s not on the new consultation.
4 comments
There was a video on YouTube that did a fly thru of the proposed new route thro the deeside industrial estate, roundabouts removed, over the new bridge and up to the A55 at the services. I can’t find it now.
They should be using the other bridge further down river and link it to the A55.
The bridge that doesn’t go anywhere. What a waste of money that was.
Found the link it’s called the red route and by far and away the best option. But it’s not on the new consultation.
Flintshire corridor – red option
https://youtu.be/6Dp3HI7sf_A?si=2N6YcT7jGaHqGKOS
https://www.gov.wales/a494-river-dee-bridge-replacement-scheme
Comments are closed.