A key natural gas pipeline has been laid in the seabed of the Gulf of Mexico.

Expand
The 444-mile pipeline (with 416 miles offshore) was installed by pipelay and subsea construction company Allseas Group SA for TC Energy Corp.’s Southeast Gateway Pipeline.
Allseas disclosed it laid the 1.3 Bcf/d capacity, 36-inch diameter pipeline in 11 months, including “complex nearshore scope and pre-commissioning of the entire system,” according to the company.