https://www.businesspost.ie/energy/esb-takes-galway-wind-farm-offline-after-planning-is-denied-3a55fe31

4 comments
  1. Damage done 19 years ago. Absolute waste of money and existing clean electric infrastructure at a time we need it most.

    Should never have been built there, but there’s no undoing the damage now. Probably be plenty of damage to the peatlands through their dismantling, mind.

Leave a Reply