Trump officials order Michigan coal power plant must stay open on eve of shutdown

https://www.google.com/amp/s/www.mlive.com/environment/2025/05/trump-officials-order-michigan-coal-power-plant-must-stay-open-on-eve-of-shutdown.html%3foutputType=amp

by reverseslamajama

2 comments
  1. It looks like OP posted an AMP link. These should load faster, but AMP is controversial because of [concerns over privacy and the Open Web](https://www.reddit.com/r/AmputatorBot/comments/ehrq3z/why_did_i_build_amputatorbot). Fully cached AMP pages (like the one OP posted), are [especially problematic](https://www.reddit.com/r/AmputatorBot/comments/ehrq3z/why_did_i_build_amputatorbot).

    Maybe check out **the canonical page** instead: **[https://www.mlive.com/environment/2025/05/trump-officials-order-michigan-coal-power-plant-must-stay-open-on-eve-of-shutdown.html](https://www.mlive.com/environment/2025/05/trump-officials-order-michigan-coal-power-plant-must-stay-open-on-eve-of-shutdown.html)**

    *****

    ^(I’m a bot | )[^(Why & About)](https://www.reddit.com/r/AmputatorBot/comments/ehrq3z/why_did_i_build_amputatorbot)^( | )[^(Summon: u/AmputatorBot)](https://www.reddit.com/r/AmputatorBot/comments/cchly3/you_can_now_summon_amputatorbot/)

  2. I don’t think that’s within a President’s power or any of his business either.

Comments are closed.