Building an underground tunnel for an aging Enbridge oil pipeline that stretches across a Great Lakes channel could destroy wetlands and harm bat habitats but would eliminate the chances of a boat anchor rupturing the line and causing a catastrophic spill, the U.S. Army Corps of Engineers said Friday in a long-awaited draft analysis of the proposed project’s environmental impacts.
The analysis moves the corps a step closer to approving the tunnel for Line 5 in the Straits of Mackinac. The tunnel was proposed in 2018 at a cost of $500 million but has been bogged down by legal challenges. The corps fast-tracked the project in April after President Donald Trump ordered federal agencies in January to identify energy projects for expedited emergency permitting.
kAmp 7:?2= 6?G:C@?>6?E2= 2DD6DD>6?E 😀 6IA64E65 3J 2FEF>?[ H:E9 2 A6C>:EE:?8 564:D:@? E@ 7@==@H =2E6C E9:D J62C] %96 286?4J :?:E:2==J A=2??65 E@ :DDF6 2 A6C>:EE:?8 564:D:@? 😕 62C=J a_ae]k^Am
kAm(:E9 E92E A6C>:E 😕 92?5[ t?3C:586 H@F=5 @?=J ?665 A6C>:DD:@? 7C@> E96 |:49:82? s6A2CE>6?E @7 t?G:C@?>6?E[ vC62E {2 2 8:G6?[ E9@F89]k^Am
kAmt?G:C@?>6?E2=:DED 92G6 366? AC6DDFC:?8 E96 DE2E6 E@ 56?J E96 A6C>:E] |62?H9:=6[ |:49:82? pEE@C?6J v6?6C2= s2?2 }6DD6= 2?5 v@G] vC6E496? (9:E>6C 2C6 ECJ:?8 E@ H:? 4@FCE CF=:?8D E92E H@F=5 7@C46 t?3C:586 E@ C6>@G6 E96 6I:DE:?8 A:A6=:?6 7C@> E96 DEC2:ED 7@C 8@@5]k^Am
kAmr@?DECF4E:@? 4@F=5 92G6 >2;@C D9@CE\E6C>[ =@?8\E6C> :>A24EDk^Am
kAm%96 2?2=JD:D ?@E6D E92E E96 EF??6= H@F=5 6=:>:?2E6 E96 C:D6?E2=:DED] qFE E96 4@?DECF4E:@? H@F=5 92G6 DH66A:?8 67764ED @? 6G6CJE9:?8 7C@> C64C62E:@? E@ H:=5=:76]k^Am
kAm|2?J @7 E96 :>A24ED[ DF49 2D ?@:D6[ G:DE2D >2CC65 3J c__\7@@E W`a`\>6E6CX 4C2?6D[ 4@?DECF4E:@? =:89ED 568C25:?8 DE2C82K:?8 @AA@CEF?:E:6D 2E w625=2?5D x?E6C?2E:@?2= s2CA=6E65[ E96 C6A@CE 7@F?5]k^Am