The vessel can switch between cable laying mode and construction mode, providing scalability to accommodate future phases of wind farm construction such as mooring of floating turbines, cable burial and construction of HVDC submarine networks.
The tailor-made Discovery has an LOA of 150.1 metres (492.5 feet), a beam of 28 metres (92 feet), a maximum draught of seven metres (20 feet), a depth of 12.2 metres (40 feet), a gross tonnage of approximately 19,000, and accommodation for up to 90 personnel.
Vard Chairman Alberto Maestrini said that Discovery’s dimensions make her the largest purpose-built cable laying vessel to be operated in Japan.