Power grid-road network coupled model
Compared with urban power supply systems, the emergency response capability of highway power supply systems is usually required to be higher. It needs to quickly switch to zoned power supply operations while taking into account the impact of the road network on highway electrical loads, providing the necessary power support to ensure that critical areas along the highway are not affected. Therefore, this paper establishes a power grid-road network coupled model based on the characteristics of road conditions and the topology of power lines, providing an important basis for highway power supply systems to identify power grid-road network characteristics after a fault occurs, and zoning power supply areas to improve the reliability of the highway power supply system.
When zoning the highway power supply system, it is necessary to account for the impact of mobile energy storage devices or electric vehicles on the power supply system. The scheduling of mobile energy storage devices or electric vehicles must consider factors such as starting and ending positions, road length, etc. Therefore, it is essential to establish a coupling relationship between the power supply system nodes and the highway traffic nodes, both electrically and geographically. Taking the 22-node power grid as an example, Fig. 1 shows the correspondence between the power grid and the actual roads of the highway.
Fig. 1
Electricity-transportation interdependent network model.
As seen in Fig. 1,considering the actual orientation and road conditions of the highway, the travel path of mobile energy storage devices during the scheduling process does not have a direct correspondence with the length of the power lines, and there are multiple feasible road paths available for selection between each node. In the event of sudden faults or special circumstances such as traffic congestion, there may be situations where some grid nodes are obstructed and cannot be accessed. Therefore, in order to accurately reflect the real geographical connection between various nodes in the highway power supply system, it is necessary to construct an adjacency matrix D to describe the connectivity between the roads and the corresponding geographical distances:
$$D=\left[ {\begin{array}{*{20}{c}} {{d_{11}}}&{{d_{12}}}&{…}&{{d_{1N}}} \\ {{d_{21}}}&{{d_{22}}}&{…}&{{d_{2N}}} \\ \vdots & \vdots &{}& \vdots \\ {{d_{N1}}}&{{d_{N2}}}&{…}&{{d_{NN}}} \end{array}} \right]$$
(11)
In (11), N represents the total number of system nodes, and \({d_{ij}}\)represents the actual geographical connection relationship and road distance between node i and node j. According to the actual situation, if there are no roads connecting two nodes or road conditions do not allow vehicles to pass, then the distance between the two nodes is considered infinitely far.
$${d_{ij}}=\left\{ \begin{gathered} 0,i=j \hfill \\ \infty , \hfill \\ {l_{ij}},i \ne j \hfill \\ \end{gathered} \right.$$
(12)
In (12),\({l_{ij}}\)represents the road distance between node i and node j, measured in km. Due to the real-time variability of actual road conditions and the impact of sandstorms on the roads, the road passability probability \({Q_r} \in \left. {\left( {0,} \right.1} \right]\), determined by the sandstorm intensity level and road geometric characteristics15, is used to modify the adjacency matrix D:
$${d_{ij}}(t)={Q_r}{d_{ij}}$$
(13)
Objective function for the disaster damage prevention model of highway power supply system
In extreme scenarios, when zoning the highway power supply system, the goal should be to restore more fault nodes. At this time, the power supply system is disconnected from the large power grid due to faults, and the internal power supply of the system is mainly provided by distributed generations. Therefore, when zoning the power supply areas, available power sources should be searched outward from important fault nodes, and as many distributed generations as possible should be included in the power supply zone to maximize the restoration of critical loads. On this basis, the grid-side objective function is established as follows:
$${F_1}=\hbox{max} \sum\limits_{{{\text{i}} \in L}} {\sum\limits_{{t=1}}^{n} {{w_i}\theta _{{i,t}}^{{}}{P_{i,t}}} }$$
(14)
where L is the set of load nodes,\(\:{w}_{i}\) is the importance weight of the load at node \(\:i\), \(\theta _{{i,t}}^{{}} \in \left\{ {0,1} \right\}\)indicates whether the load at node \(\:i\) is restored, and \({P_{i,t}}\) is the load-recovery amount at node \(\:i\) in period \(\:t\). Since the weighted restored load involves the bilinear product \(\theta _{{i,t}}^{{}}{P_{i,t}}\) of a continuous variable and a binary variable, it is represented exactly by an auxiliary variable \({z_{i,t}}=\theta _{{i,t}}^{{}}{P_{i,t}}\) through the linear constraints\(0 \le {z_{i,t}}=\theta _{{i,t}}^{{}}{\bar {P}_{i,t}}\) and \({P_{i,t}} – {\bar {P}_{i,t}}(1 – \theta _{{i,t}}^{{}}) \le {z_{i,t}} \le {P_{i,t}}\), where \({\bar {P}_{i,t}}\) is the load demand at node \(\:i\) (the upper bound of\({P_{i,t}}\)). Because\(\theta _{{i,t}}^{{}}\) is binary, this representation is exact (\({z_{i,t}}={P_{i,t}}\)if\(\theta _{{i,t}}^{{}}=1\), and \({z_{i,t}}=0\) otherwise), so the objective remains linear.
In addition to the need to meet the maximum load recovery, it is also necessary to consider the impact of the transportation network on the recovery time after zoning of the power supply system. The fault recovery time, apart from the basic recovery time supported by distributed generations, also includes the scheduling time of emergency power vehicles and the recovery time for supplying power to the load by these vehicles. Therefore, when zoning the power supply system, the scheduling time for emergency power vehicles should be reduced as much as possible, with minimizing the fault recovery time of the power supply system as the second objective function. Based on this, the road-side objective function is established as follows:
$$\hbox{min} {F_2}=\sum\limits_{{p=1}}^{H} {\sum\limits_{{q=1}}^{M} {\sum\limits_{{k \in {G_{pq}}}}^{{}} {{\omega _k}{T_{pq}} – } } } \sum\limits_{{k \in {G_k}}}^{{}} {{t_{k,k – 1}}}$$
(15)
In (15), \({\omega _k}\)is the importance of the load at the fault node k;\({G_{pq}}\) is the set of loads restored after the pth power supply vehicle connects to the qth isolated network; \({T_{pq}}\)is the service time of the pth power supply vehicle in the qth isolated network; \({t_{k,k – 1}}\)is the transfer time between the kth fault and the k-1th fault, H is the total number of emergency power supply vehicles and M is the total number of isolated networks.
Path optimization for disaster damage prevention in highway power supply systems
Regarding zoning of power supply systems, especially under extreme conditions such as those found in highway scenarios, selecting an appropriate path optimization method is crucial. The advantage of path optimization lies in minimizing the loss and cost of power transmission while meeting the demand for power supply. Traditional path optimization methods often fail to fully consider factors such as dynamic system changes, real-time load fluctuations, and highway road conditions, etc. when faced with the specific highway application scenario. Compared with Dijkstra’s algorithm, which only considers static shortest path optimization, the A* algorithm improves efficiency while dynamically adjusting path selection based on real-time traffic routes and conditions. Therefore, it is more suitable for emergency path optimization and dynamic adjustments. This paper uses the A* algorithm as the path optimization method for power supply zone division.
First, the formula for path evaluation is established:
where \(f(n)\)represents the total cost from the starting node to the target node; \(g(n)\)represents the cost of the path already traversed from the current node to the starting node (fault node); \(h(n)\)represents the estimated remaining cost from the current node to the target node (target power supply zone or distributed generation, etc.).
\(g(n)\)is generally related to the actual costs of power flow, time costs, power loss, transmission distance, and other factors, specifically including the following factors: ohmic loss and voltage drop.
$${P_{Iloss}}=I_{{ij}}^{2}{R_{ij}}$$
(17)
$${V_{loss}}={I_{ij}}{R_{ij}}$$
(18)
In (17, 18), \(I_{{ij}}^{2}\)is the square of the current between node i and node j; \({R_{ij}}\)is the resistance between node i and node j; \({I_{ij}}\)is the current between node i and node j.
\(h(n)\)is estimated based on heuristic functions, usually representing the estimated cost of the shortest path or optimal path from the current node to the target node, mainly including the following heuristic functions:
Firstly, an actual road heuristic function is established to help estimate the actual road distance from the current node to the target power supply zone. The purpose is to ensure path accessibility and to prioritize shorter roads in certain cases.
$${h_{road}}(n)={D_{road}}(i,j)$$
(19)
In (19), \({D_{road}}(i,j)\) represents the actual road distance from the current node i to the target power supply zone, which can be estimated by the topology and connectivity of the road network.
Secondly, establishing a heuristic function for the power transmission network can help select low-loss power transmission paths based on the power transmission losses and current losses, optimizing power transmission efficiency.
$${h_{elec}}(n)=\alpha {D_{elec}}(i,j)+\beta {L_{elec}}(i,j)$$
(20)
In (20), \({D_{elec}}(i,j)\) represents the length of the power transmission path from the current node to the target power supply zone; \({L_{elec}}(i,j)\) represents the current loss or other costs during the power transmission process; \(\alpha\) and \(\beta\)are the weights corresponding to different factors.
After that, a load demand heuristic function is established, taking into account important load nodes and prioritizing the power supply for these key loads. Increasing the costs for nodes with high load demand ensures they are prioritized for allocation into suitable power supply zones.
$${h_{load}}(n)=\sum\limits_{{i=1}}^{k} {({\gamma _i}{L_i})}$$
(21)
In (21), k is the number of critical load nodes in the target power supply zone; \({L_i}\)represents the load demand of node i; \({\gamma _i}\)represents the weight coefficient of the load demand, which reflects the importance of load demand to path selection.
Considering the differences between highway electrical load and urban power grid load, the priorities for highway electrical load recovery are defined as follows:
Special level load: Loads associated with major safety issues on highways, such as tunnel emergency lighting, tunnel fire protection, gantry facilities, etc.
1st level load: Loads associated with highway operational status, such as monitoring systems, communication systems, toll lane lighting, etc.
2nd level load: Loads with a relatively low level of safety importance, such as tunnel lighting, office building fire protection, office building emergency lighting, etc.
3rd level load: General loads associated with highways, such as general lighting, office loads, charging stations, etc.
The following load restoration set is established according to the importance level of the load:
$$C_{t}^{i}={w_{i,t}}{P_{i,t}}$$
(22)
where \(C_{t}^{i}\)is the load restoration set; \({w_{i,t}}\)represents the importance level of the load; \({P_{i,t}}\)represents the load restoration amount at node i during the time period t.
During fault recovery, to ensure the safety of highways and road passability, it is necessary to maintain 100% power supply for the special level loads and 1st level loads, provide as much power as possible for the 2nd level loads, and cut off part of the 3rd level loads.
Finally, considering the impact of distributed generations, a heuristic function for distributed generations is established to estimate path selection based on the location and capacity of the distributed generations. Since distributed generations can provide electricity to the power supply zones, prioritizing the paths near distributed generations can ensure that power supply zones operate independently.
$${h_d}(n)=\mathop {\hbox{min} }\limits_{{i \in \Omega }} ({\delta _i}{D_{elec}}(n,i))$$
(23)
In (23), \({D_{elec}}(n,i)\) represents the power transmission distance between the current node n and the target node i; \({\delta _i}\) is the weight coefficient associated with the distributed generation, which reflects the capacity or priority of the distributed generation.
Combining the above heuristic functions, a comprehensive heuristic function is established:
$$h(n)={\alpha _1}{h_{road}}(n)+{\alpha _2}{h_{elec}}(n)+{\alpha _3}{h_{load}}(n)+{\alpha _4}{h_d}(n)$$
(24)
where \({\alpha _1}\), \({\alpha _2}\) ,\({\alpha _3}\)and \({\alpha _4}\)are the weights of different heuristic functions.
Constraints of highway power supply systems
Power balance constraints of power supply zone i:
$${P_{{\text{WT}},i}}(t)+{P_{{\text{PV}},i}}(t)+{P_{{\text{ESS}},i}}(t)+{P_{G,i}}(t)={P_{{\text{Load}},i}}(t)+\Delta {P_{{\text{Loss}},i}}(t)$$
(25)
In (25), \({P_{{\text{WT}},i}}(t)\) represents the power output of the wind turbines; \({P_{{\text{PV}},i}}(t)\)represents the power output of the photovoltaic stations; \({P_{{\text{ESS}},i}}(t)\)represents the power generated or absorbed by the energy storage devices in zone i; \({P_{G,i}}\)represents the power generation of the emergency power supply vehicles at node i;\({P_{{\text{Load}},i}}(t)\)represents the load demand in zone i; \(\Delta {P_{{\text{Loss}},i}}(t)\)represents the line losses in zone i.
Active power balance constraints of emergency power supply vehicles:
$$\sum\limits_{{i=1}}^{n} {{P_{G,i}}+\sum\limits_{{j=1}}^{k} {{P_{L,j}} \le 0} }$$
(26)
$${P_{G,i}} \ge {P_i},i \in {\Omega _z}$$
(27)
In (26)-(28) \({P_{L,j}}\) represents the load recovery amount at node j; \({P_i}\)represents the power shortage amount at node i excluding the power supply from the wind turbines, photovoltaic stations, and energy storage devices; \(i \in {\Omega _z}\)represents the set of important load nodes; \({T_{G,i}}\)represents the usage time of the emergency power supply vehicles for node i.
Each restored power supply zone is supplied by an internal source and is operated as an acyclic, source-anchored network. To state this connectivity and acyclicity condition explicitly, a single-commodity fictitious-flow (SCF) formulation is adopted16,17. A virtual reference root \(\:{\text{r}}_{0}\) is associated with the internal source nodes through virtual arcs, so that a power supply zone containing more than one such source is still described as a single connected, acyclic structure. The fictitious flow is a purely topological quantity without physical units, and does not represent any power flow; it serves only to certify connectivity and acyclicity. Faulted lines are kept out of service, and the connectivity and acyclicity of each power supply zone are enforced by the following constraints:
$$a_{{ij,t}} = 0,\forall i,j \in \Omega _{G} ,\forall t$$
(29)
$$y_{{i,t}}^{{}}=1,\quad \forall s \in {\Omega _S}$$
(30)
$$0 \le \theta _{i}^{t} \le y_{i}^{t},\quad \forall i \in \Omega$$
(31)
$$- K{\mkern 1mu} {a_{ij,t}} \le {F_{ij,t}} \le K{\mkern 1mu} {a_{ij,t}},\quad \forall (i,j)$$
(32)
$$0 \le {R_{s,t}} \le M{\mkern 1mu} {z_{s,t}},\quad \forall s \in {\Omega _S}$$
(33)
$$\sum\limits_{{j \in {\delta ^ – }(i)}} {{F_{ji,t}}} – \sum\limits_{{j \in {\delta ^+}(i)}} {{F_{ij,t}}} +{{\mathbf{1}}_{\{ i \in {\Omega _S}\} }}{H_{i,t}}=y_{{i,t}}^{{}},\quad \forall i \in \Omega$$
(34)
$$\sum\limits_{{(i,j)}} {{a_{ij,t}}} +\sum\limits_{{s \in {\Omega _S}}} {{z_{s,t}}} =\sum\limits_{{i \in \Omega }} {y_{{i,t}}^{{}}} ,\quad \forall t$$
(35)
where \({\Omega _G}\) is the set of faulted lines,\({\Omega _S}\)is the set of internal source nodes,\(\Omega\) is the set of all nodes,\(y_{{i,t}}^{{}} \in \left\{ {0,1} \right\}\)indicates whether node \(\:i\) is energized, \({a_{ij,t}} \in \left\{ {0,1} \right\}\)is the in-service status of line (i, j),\({\mkern 1mu} {z_{s,t}} \in \left\{ {0,1} \right\}\) indicates whether the virtual arc connecting the reference root \(\:{\text{r}}_{0}\) to source \(\:\text{s}\) is activated, \({F_{ij,t}}\)is the fictitious flow on line (i, j),\({R_{s,t}}\)is the fictitious flow injected from \(\:{r}_{0}\) into source \(\:s\),\({\delta ^ – }(i)\) and \({\delta ^+}(i)\) denote the lines directed into and out of node \(\:i\), K is a sufficiently large constant, and \({{\mathbf{1}}_{\{ i \in {\Omega _S}\} }}\) is the indicator function. The line status \({a_{ij,t}}\) is a decision variable: the faulted lines are fixed out of service by (29), while for the remaining intact lines \({a_{ij,t}}\) is determined by the connectivity and acyclicity requirements (30)–(35). Equation (29) keeps the faulted lines out of service; (30) energizes the internal sources; (31) restricts the load-restoration variable \(\theta _{i}^{t}\) of objective (14) to energized nodes; (32) permits fictitious flow only on in-service lines; (33) permits injection only through activated virtual arcs; (34) forces every energized node to absorb exactly one unit of fictitious flow that is traceable to an internal source, thereby enforcing connectivity and excluding source-less power supply zones; and (35) is a spanning-forest edge-count condition that guarantees an acyclic, source-anchored topology, with the number of power supply zones equal to \(\sum\limits_{{s \in {\Omega _S}}} {{z_{s,t}}}\).
Branch capacity constraint:
$$0 \le {P_{t,ij}} \le P_{{ij}}^{{\hbox{max} }}$$
(36)
where \(P_{{ij}}^{{\hbox{max} }}\)represents the maximum active power transfer capacity of branch ij18.
Distributed generation constraints:
$$P_{{t,i}}^{{DG\hbox{min} }} \le P_{{t,i}}^{{DG}} \le P_{{t,i}}^{{DG\hbox{max} }},\forall t$$
(37)
$$- Q_{{t,i}}^{{DG\hbox{max} }} \le Q_{{t,i}}^{{DG}} \le Q_{{t,i}}^{{DG\hbox{max} }},\forall t$$
(38)
$$\sqrt {\left( {P_{{t,i}}^{{DG}} } \right)^{2} + \left( {Q_{{t,i}}^{{DG}} } \right)^{2} } \le S_{i}^{{DG}}$$
(39)
In (37)-(39), \(P_{{t,i}}^{{DG}}\)and \(Q_{{t,i}}^{{DG}}\) represent the active power and reactive power generated by the power sources at node i during time period t; \(P_{{t,i}}^{{DG\hbox{max} }}\)and \(P_{{t,i}}^{{DG\hbox{min} }}\) represent the upper and lower limits of the active power output of the power sources at node i during time period t; \(S_{i}^{{{\text{DG}}}}\)is the capacity of the power sources connected to node i.The apparent-power capability limit \(\sqrt {P_{i}^{{\,2}}+Q_{i}^{2}} \le S\) is enforced through an inscribed-polygon approximation, a standard linearization technique for inverter-based resources19.
Energy storage constraints:
$$P_{t}^{{ESS}}=P_{t}^{{ESS,d}} – P_{t}^{{ESS,c}}$$
(40)
$$P_{t}^{{ESS,d,\hbox{min} }} \le P_{t}^{{ESS,d}} \le P_{t}^{{ESS,d,\hbox{max} }}$$
(41)
$$P_{t}^{{ESS,c,\hbox{min} }} \le P_{t}^{{ESS,c}} \le P_{t}^{{ESS,c,\hbox{max} }}$$
(42)
$$- Q_{i}^{{{\text{ESS}},\hbox{max} }} \le Q_{{t,i}}^{{{\text{ESS}}}} \le Q_{i}^{{{\text{ESS}},\hbox{max} }}$$
(43)
$$\sqrt {{{(P_{{t,i}}^{{ESS}})}^2}+{{(Q_{{t,i}}^{{ESS}})}^2}} \le S_{i}^{{ESS}}$$
(44)
In (40)-(44), \(P_{t}^{{ESS}}\)represents the power injected into the grid by the battery energy storage system during time period t; \(P_{t}^{{ESS,c}}\)and \(P_{t}^{{ESS,d}}\) represent the charging and discharging power of the battery energy storage system during time period t; \(P_{t}^{{ESS,d,\hbox{min} }}\) and\(P_{t}^{{ESS,d,\hbox{max} }}\) are the upper and lower limits of the discharging power; \(P_{t}^{{ESS,c,\hbox{min} }}\)and \(P_{t}^{{ESS,c,\hbox{max} }}\) are the upper and lower limits of the charging power; is the reactive power generated by the energy storage system at node i during time period t; \(Q_{i}^{{{\text{ESS}},\hbox{max} }}\) is the upper limit for the reactive power of the energy storage devices at node i; \(P_{t}^{{ESS}}\) represents the charging/discharging power of the energy storage devices at the node i during time period t, which is positive for charging power and negative for discharging power; \(S_{i}^{{ESS}}\)represents the energy storage capacity at node i. The apparent-power limit of the energy storage unit is likewise enforced through the same inscribed-polygon linearization.