  1. It is a meme so I wont call you ignorant. But for those who don’t know this is nothing compared to what other Cathedrals have taken to be build in the past, just look up Cologne.

    Also funding relies entirely in donations, mainly from the Catholic community, there is no rush to finish the building, it can’t be rushed for various reasons, the design is not minimalistic quite the opposite just look the drawings made by Gaudi, it is a really intricate design unlike the standard American concrete box if that was the case it would have been done in a year.

    FYI Gaudi barely left drawings of the plan, he worked on models that were destroyed in the Civil War, and architects that volunteer have some guess work to do when designing the missing elements, but that guess work comes from studying Gaudi’s work.

  2. I Think spain could use money and manpower at many other things , waste in nature is one of the things

  3. I was curious too when I was living in Barcelona, and someone told me once that Gaudí left plans but they where coded, so It’ s not just that the construction is merely afforded by donations though. Is it true what I was told? Haven’t they been decoded yet? Is it procrastination? Well I’m Spanish and I can say that Spain has many times nonlogical things happening. So we may never know.

  4. Even the Washington DC cathedral took almost 85 years to construct and it had the funding, the stone, and it’s plans weren’t written in code by our homie or destroyed by thieves during a civil war..so I’m thinking La Sagrada is right on schedule lol