So this has moved on from the previous concept design that Foster won the design competition with. This is now the master plan of what the airport will actually look like, next stage is construction.
On a side note, recently the EU awarded €64 million Euros for the preparation of the first 140km section of the high speed rail line that will link with the CPK and with Rail Baltica.
1 comment
Video: [https://twitter.com/CPK_PL/status/1676892860543561728?s=20](https://twitter.com/CPK_PL/status/1676892860543561728?s=20)
So this has moved on from the previous concept design that Foster won the design competition with. This is now the master plan of what the airport will actually look like, next stage is construction.
On a side note, recently the EU awarded €64 million Euros for the preparation of the first 140km section of the high speed rail line that will link with the CPK and with Rail Baltica.