{"id":65625,"date":"2026-08-05T09:15:07","date_gmt":"2026-08-05T09:15:07","guid":{"rendered":"https:\/\/www.europesays.com\/australia\/65625\/"},"modified":"2026-08-05T09:15:07","modified_gmt":"2026-08-05T09:15:07","slug":"runaway-train-only-stopped-after-rolling-backwards-for-5km-through-hunter-valley","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/australia\/65625\/","title":{"rendered":"Runaway train only stopped after rolling backwards for 5km through Hunter Valley"},"content":{"rendered":"<p class=\"paragraph_paragraph___QITb\">An interim report into a runaway coal train incident in the Hunter Valley has found the three locomotives and 96 wagons reached speeds well over the safe limit, and only came to a halt after rolling backwards for 5 kilometres.<\/p>\n<p class=\"paragraph_paragraph___QITb\">The Office of Transport Safety Investigations (OTSI) has released its Interim Factual Statement into the incident, which took place on July 25.<\/p>\n<p class=\"paragraph_paragraph___QITb\">It found <a class=\"Link_link__kR0xA Link_link__5eL5m ScreenReaderOnly_srLinkHint__OysWz Link_showVisited__C1Fea Link_showFocus__ALyv2\" href=\"https:\/\/www.abc.net.au\/news\/2026-07-26\/runaway-coal-train-hunter-valley\/106959762\" data-component=\"Link\" data-uri=\"coremedia:\/\/article\/106959762\" rel=\"nofollow noopener\" target=\"_blank\">the Pacific National train had &#8220;runaway<\/a> approximately 20km (kilometres) on the Up Main Northern rail line&#8221;.<\/p>\n<p>Stopped by hill<\/p>\n<p class=\"paragraph_paragraph___QITb\">&#8220;The runaway train started at Newdell Junction reaching speeds up to 90km\/h before rolling to a stop on the uphill grade near Camberwell Junction,&#8221; the report stated.<\/p>\n<p><img decoding=\"async\" alt=\"A coal train stopped on the line. A car with a flashing light is next to the tracks\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.europesays.com\/australia\/wp-content\/uploads\/2026\/08\/c779611ddb351bd4aa0b928d04085a80.jpeg\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">An interim report has found the speeding, unmanned train stopped near Glennies Creek, after rolling backwards 5 kilometres. (ABC Upper Hunter: Courtney Yeandle)<\/p>\n<p>&#8220;The train then started rolling back for 5km and rolled to a stop between Middle Folbrook Rd level crossing and Glennies Creek Rd level crossing.&#8221;<\/p>\n<p class=\"paragraph_paragraph___QITb\">The safe operating speed for a loaded coal train is generally 60km\/h.<\/p>\n<p class=\"paragraph_paragraph___QITb\">The report found there was damage to rolling stock and minor damage to the track.<\/p>\n<p>Probe looking at brakes and crew<\/p>\n<p class=\"paragraph_paragraph___QITb\">OTSI said its investigation would look at &#8220;locomotive and wagon specifications and braking systems \u2026 along with data loggers and CCTV&#8221;.<\/p>\n<p class=\"paragraph_paragraph___QITb\">Investigators will also review &#8220;the actions of the train crew and organisational processes for responding to train brake faults&#8221;.<\/p>\n<p class=\"paragraph_paragraph___QITb\">Operating procedures and maintenance systems, audio recording systems and network incident response systems will also be looked at.<\/p>\n<p>Risks examined<\/p>\n<p class=\"paragraph_paragraph___QITb\">The chief investigator has assigned an investigator in charge (IIC) to find out how and why the train ran away, and &#8220;determine whether the incident might have been anticipated&#8221;.<\/p>\n<p class=\"paragraph_paragraph___QITb\">Coal haul operator Pacific National previously released a statement saying it was co-operating with investigators.<\/p>\n<p class=\"paragraph_paragraph___QITb\">&#8220;Safety is Pacific National&#8217;s highest priority,&#8221; it said.<\/p>\n<p class=\"paragraph_paragraph___QITb\">&#8220;We take this incident extremely seriously and are fully cooperating with the regulator and all relevant authorities to understand exactly what occurred and identify any actions required to prevent a recurrence.&#8221;<\/p>\n<p class=\"paragraph_paragraph___QITb\">OTSI said the final report would be provided to the minister for tabling in both Houses of the NSW parliament in accordance with section 46D of the Passenger Transport Act 1990.<\/p>\n","protected":false},"excerpt":{"rendered":"An interim report into a runaway coal train incident in the Hunter Valley has found the three locomotives&hellip;\n","protected":false},"author":2,"featured_media":65626,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[10761,22,21,81318,9884,81317,81319,1260,2737,81316],"class_list":["post-65625","post","type-post","status-publish","format-standard","has-post-thumbnail","category-australia","tag-accident","tag-au","tag-austrlia","tag-brakes","tag-coal","tag-crew","tag-runaway","tag-speeding","tag-train","tag-wagons"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/australia\/wp-json\/wp\/v2\/posts\/65625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/australia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/australia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/australia\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/australia\/wp-json\/wp\/v2\/comments?post=65625"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/australia\/wp-json\/wp\/v2\/posts\/65625\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/australia\/wp-json\/wp\/v2\/media\/65626"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/australia\/wp-json\/wp\/v2\/media?parent=65625"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/australia\/wp-json\/wp\/v2\/categories?post=65625"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/australia\/wp-json\/wp\/v2\/tags?post=65625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}