Last week, St Martin’s Property Investments held consultation events over the proposals to redevelop the two polished pink Brazilian granite-clad towers.

The existing building was designed by John S Bonnington Partnership, a former Hertfordshire-based practice, 40 years ago. The 25,500m2 riverside structure, at the southern end of London Bridge, features two blocks joined by a central atrium and is best known for its huge exterior cutaway and diagonal external steps set at an angle to their handrails.

The building received a certificate of immunity from listing last year, meaning it can’t be considered for listing before November 2030.

The original 13-storey scheme was built between 1985-1988 and included No 1 London Bridge, Cottons, Hays Galleria and 29-33 Tooley Street. According to Historic England, it was the ‘biggest building contract in London and was one of the largest construction projects in the country’ at he time.

A website set up to promote the proposed redevelopment said the ‘ageing’ office complex would be replaced with ‘modern, energy-efficient workspace alongside new public spaces and active ground-floor uses’ potentially up to 16 storeys high.

It added: ‘The proposals also aim to improve connections between Tooley Street, London Bridge and the Thames, opening up new views to the river and creating a more welcoming and vibrant riverside destination.’

And it said the project could create a ‘wider and improved’ Queen’s Walk; accessible, step-free connections to the river; safer spaces with better visibility; and improved views of the Thames.

It added that shops, cafés, restaurants, planting, seating and covered areas were all under consideration, as were cycle parking and an increase in public space.

The first consultations were held at nearby Hay’s Galleria on 12 and 14 November.

A website promoting the existing structure at One London Bridge described it as comprising ‘contemporary, riverside office space adjacent to London Bridge Station’ which ‘benefits from its ideal location between Tower Bridge, More London and Borough Market/the South Bank’.

It added: ‘The final remaining floor offers [980m²] of bright and open plan workspace with river views. The third floor of the east wing is delivered fully fitted with high-quality furnishings, ready for immediate occupation.’

Foster + Partners was contacted for comment.



 

2018 predictions: Will the profession continue to be marginalised?