Rio Tinto (ASX:RIO) CEO Simon Trott is calling for closer cooperation between businesses and governments to meet rising copper and lithium demand as developing new mines becomes more difficult.

Speaking at the Asia-Pacific Economic Cooperation (APEC) CEO Summit in Shenzhen, China, on Tuesday (17 November), Trott pointed to electrification and AI as long-term demand drivers, the South China Morning Post reports.

“We’re going to need more copper between now and 2050 than has been mined since the time of the Phoenicians,” he says.

Trott also says annual lithium demand could soon equal the total quantity mined throughout history.

“And so to be able to deliver [the required copper and lithium] at a time when it’s getting harder and harder to develop projects, we’re going to need all of the innovations,” he says.

He warns that fragmented supply chains could drive prices higher, calling for integrated supply networks alongside improvements in exploration and project development.

Trott points to the Simandou iron ore development in Guinea, involving Rio Tinto, Chinese partners, and the Guinean Government, as an example of cooperation.

Separately, executives from Rio Tinto and BHP Group (ASX:BHP) are due to join Prime Minister Anthony Albanese for talks with Chinese Premier Li Qiang and business leaders in Beijing on Friday (20 November), as previously reported.

The meeting comes amid increasingly difficult supply negotiations with China’s state-backed iron ore buyer, China Mineral Resources Group (CMRG), which has banned purchases of selected Australian products during this year’s negotiations.

Expansion provides production context

Rio’s latest quarterly update shows consolidated copper production reached 646,000 tonnes in the first nine months of 2026, up 1% year-on-year. Output at Oyu Tolgoi in Mongolia increased 29%.

The company maintained full-year copper production guidance of 800,000–870,000 tonnes.

In lithium, Rio is targeting annual production capacity of approximately 200,000 tonnes of lithium carbonate equivalent by 2028.

Its Fénix 1B expansion and Sal de Vida operation in Argentina achieved first production in the second quarter and are ramping up. Together, they are expected to add 25,000 tonnes of annual capacity once fully ramped up.

Write to France Pinzon at Mining.com.au

Main image: Simon Trott, LinkedIn

Add to Watch List:Rio TintoLithiumCopper