Published November 27, 2026 10:59am

Add GMA on Google

Make this your preferred source to get more updates from this publisher on Google.

The Visayas grid will be under yellow alert status for an hour on Friday, as major coal plants in the region remain unavailable due to forced outages and derated capacities.

In an advisory, the National Grid Corporation of the Philippines (NGCP) said the Visayas grid will be on yellow alert status from 5 p.m. to 6 p.m. on November 27.

This comes as the available capacity was recorded at 2,500 megawatts (MW) versus the peak demand of 2,428 MW, while a total of 599.2 MW remains unavailable to the grid.

The grid operator said the following factors contributed to the yellow alert declaration:

Unavailability of TVI 2 (Unplanned Outage) and derated capacity of TVI 1 Unavailability of PCPC and KSPC Unit 2 (both on Planned Outage) Limited power import from the Mindanao grid.

It added that 10 plants have been on forced outage since November, one plant since October, two plants since September, two plants since August, one plant since June, three plants since 2025, one plant since 2024, two plants since 2023, and one plant since 2021, while 20 plants are running at derated capacities.

A yellow alert is issued when the operating margin is insufficient to meet the transmission grid’s contingency requirement.—AOL, GMA News