{"id":139317,"date":"2026-10-07T15:36:20","date_gmt":"2026-10-07T15:36:20","guid":{"rendered":"https:\/\/www.europesays.com\/britain\/139317\/"},"modified":"2026-10-07T15:36:20","modified_gmt":"2026-10-07T15:36:20","slug":"national-grid-completes-2-2km-tunnel-breakthrough-49-days-ahead-of-schedule","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/britain\/139317\/","title":{"rendered":"National Grid completes 2.2km tunnel breakthrough 49 days ahead of schedule"},"content":{"rendered":"<p>The breakthrough of a 2.2km cable tunnel beneath the River Thames, which is part of National Grid\u2019s Great Grid Upgrade Grain to Tilbury Project, has been completed 49 days ahead of schedule.<\/p>\n<p>The new 400kV cable tunnel beneath the Thames, replaces the 1960s Thames Cable Tunnel and reinforces electricity transmission between Kent and Essex.<\/p>\n<p>The milestone was achieved on Sunday 27 September by a tunnel boring machine (TBM) named Caroline, following \u201cexceptional tunnelling performance\u201d,\u00a0 said National Grid.<\/p>\n<p>Caroline dug the tunnel between Tilbury in Essex and Gravesend in Kent and completed the final stage of its journey via an intentionally flooded reception shaft to balance the pressure between the shaft and surrounding chalk ground in order to reduce the risk of groundwater entering the shaft.<\/p>\n<p>The TBM installed more than 10,000 concrete tunnel segments and almost 1,700 tunnel rings.<\/p>\n<p>\u201cCombined with the expertise of engineers, operators and construction teams, Caroline maintained strong progress throughout the tunnelling phase,\u201d National Grid said.<\/p>\n<p>The company provided statistics on the progress made by the TBM. In its most productive month, Caroline advanced 926m and installed 712 tunnel lining rings, \u201cat peak performance\u201d, it advanced 229m in one week, and its best daily output saw 41m advanced and 31 tunnel rings installed.<\/p>\n<p>\u201cDigital design tools and connected TBM data also supported delivery by improving visibility, quality assurance and decision-making,\u201d National Grid added.<\/p>\n<p>\u201cAn integrated underwater telescopic camera allowed inspections to be carried out remotely, reducing the need for personnel intervention and supporting safe working practices.\u201d<\/p>\n<p>The delivery partner for the tunnel was Ferrovial Bemo JV, it was designed by Mott MacDonald and Herrenknecht provided specialist tunnelling services.<\/p>\n<p>The early breakthrough was enabled by \u201ccareful planning, favourable ground conditions, and the proven performance of the tunnel boring machine\u201d as well as \u201cwell-coordinated logistics that kept tunnel segments continuously delivered to the TBM, while a dedicated separation plant reliably processed excavated material uninterrupted and efficiently\u201d, National Grid said.<\/p>\n<p>Ferrovial Bemo JV project director Borja Trashorras said: \u201cReaching breakthrough ahead of schedule is the result of excellent planning, strong engineering expertise and outstanding collaboration across the project team.<\/p>\n<p>\u201cThe combination of diligent planning, efficient logistics, innovative tunnelling technology and a highly skilled workforce enabled us to achieve consistently strong performance throughout the drive.\u201d<\/p>\n<p>Herrenknecht board member Ulrich Schaffhauser said: \u201cThe fast completion of the cable tunnel beneath the River Thames shows\u202fthe value of effectively coordinating all project components, technologies, and services.<\/p>\n<p>\u201cWith our product and service portfolio, we were able to deliver not only the TBM tailored to the operating conditions, but also the corresponding separation equipment and tunnel logistics for continuous tunnelling performance.<\/p>\n<p>\u201cThis breakthrough demonstrates what can be achieved when advanced tunnelling technology, efficient project execution and strong teamwork come together. We congratulate the entire project team on reaching the breakthrough safely and successfully.\u201d<\/p>\n<p>National Grid project director Mark Farmer said: \u201cCompleting this tunnel drive ahead of schedule is a testament to the expertise, dedication and collaboration of our teams and supply chain partners.<\/p>\n<p>\u201cThis project will play a critical role in strengthening the electricity network and supporting Britain\u2019s future energy needs as demand for cleaner electricity continues to grow.\u201d<\/p>\n<p>Main image: NG Grain to Tilbury Gravesend shaft. Credit: National Grid\u00a0<\/p>\n<p class=\"hide-in-mobile-app\">Like what you&#8217;ve read?\u00a0<a href=\"https:\/\/www.newcivilengineer.com\/account\/newsletter\/\" target=\"_blank\" rel=\"noopener nofollow\">To receive New Civil Engineer&#8217;s daily and weekly newsletters click here.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"The breakthrough of a 2.2km cable tunnel beneath the River Thames, which is part of National Grid\u2019s Great&hellip;\n","protected":false},"author":2,"featured_media":139318,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[21249],"tags":[55779,8605,55780,23160,55781,23162,23187,21305,2580,9679,55782,55783,55784],"class_list":["post-139317","post","type-post","status-publish","format-standard","has-post-thumbnail","category-national-grid","tag-cable-tunnel","tag-electricity-grid","tag-electricity-tunnel","tag-ferrovial","tag-ferrovial-bemo-jv","tag-grain-to-tilbury","tag-great-grid-upgrade","tag-herrenknecht","tag-national-grid","tag-river-thames","tag-tbm","tag-tunnel","tag-tunnel-boring-machine"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@UnitedKingdom\/117400370054574338","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts\/139317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/comments?post=139317"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts\/139317\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/media\/139318"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/media?parent=139317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/categories?post=139317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/tags?post=139317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}