{"id":172627,"date":"2026-11-23T08:47:09","date_gmt":"2026-11-23T08:47:09","guid":{"rendered":"https:\/\/www.europesays.com\/britain\/172627\/"},"modified":"2026-11-23T08:47:09","modified_gmt":"2026-11-23T08:47:09","slug":"rooppur-supply-resumes-nuclear-power-connected-to-grid-for-second-time","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/britain\/172627\/","title":{"rendered":"Rooppur: Supply resumes, nuclear power connected to grid for second time"},"content":{"rendered":"<p>Power plant officials say experimental production may continue for several months after it begins. However, with electricity reaching the grid, Bangladesh has become the world\u2019s 33rd country to generate nuclear power. Formal recognition will come, however, after testing is completed and full-scale supply begins. <\/p>\n<p>Earlier, in October 2023, the Rooppur Nuclear Power Plant was recognised as a nuclear facility after nuclear fuel arrived at the project site. Bangladesh was included in the list of countries possessing nuclear energy immediately after receiving the fuel.<\/p>\n<p>The Rooppur Nuclear Power Plant is the largest single project in the country\u2019s history. The project is being implemented by the Bangladesh Atomic Energy Commission under the Ministry of Science and Technology. <\/p>\n<p>The operational activities are being carried out by a government-owned company called Nuclear Power Plant Company Bangladesh Limited (NPCBL), under the commission. Russian contractor Atomstroyexport is constructing two 1,200-megawatt units at Rooppur.<\/p>\n<p>The Rooppur project was scheduled to run until December 2025. Its duration has been extended twice, until June 2028. According to the contract with the contractor, there is no scope to increase the project cost despite the extension. <\/p>\n<p>However, the rise in the dollar exchange rate has increased the project cost by Tk 260 billion. The Rooppur Nuclear Power Plant will cost Tk 1.38 trillion.<\/p>\n","protected":false},"excerpt":{"rendered":"Power plant officials say experimental production may continue for several months after it begins. However, with electricity reaching&hellip;\n","protected":false},"author":2,"featured_media":172628,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[21249],"tags":[159,2580,35367,30083],"class_list":["post-172627","post","type-post","status-publish","format-standard","has-post-thumbnail","category-national-grid","tag-electricity","tag-national-grid","tag-nuclear-power-plant","tag-rooppur-nuclear-power-plant"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@UnitedKingdom\/117664890426422245","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts\/172627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/comments?post=172627"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts\/172627\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/media\/172628"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/media?parent=172627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/categories?post=172627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/tags?post=172627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}