{"id":83872,"date":"2026-07-16T02:02:08","date_gmt":"2026-07-16T02:02:08","guid":{"rendered":"https:\/\/www.europesays.com\/britain\/83872\/"},"modified":"2026-07-16T02:02:08","modified_gmt":"2026-07-16T02:02:08","slug":"national-grid-overhaul-group-urges-urgent-action-amid-black-2","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/britain\/83872\/","title":{"rendered":"National Grid Overhaul: Group Urges Urgent Action Amid Black"},"content":{"rendered":"<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">Power sector advocacy group, PowerUp Nigeria, has called on the Federal Government to urgently overhaul the national grid, warning that persistent blackouts are crippling the economy, forcing manufacturers off the grid and undermining Nigeria\u2019s industrial competitiveness.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">The Executive Director of PowerUp Nigeria, Adetayo Adegbemle, made the call in a statement, arguing that the country\u2019s electricity crisis has become a major economic threat due to repeated national grid failures and weak infrastructure.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">According to him, Nigeria\u2019s electricity problem extends beyond inadequate supply to the persistent collapse of the national grid, which he said has suffered repeated failures over the years.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">\u201cLet\u2019s dispense with the euphemisms. Nigeria does not have a \u2018power supply challenge.\u2019 It has a national grid that has failed at least 222 times between 2010 and 2022, with a dozen more collapses recorded across 2024 and 2025 alone.<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">\u201cWhat it actually represents is a market and an infrastructure base that has been allowed to decay for a generation, while successive administrations treated the grid as a line item rather than the strategic asset that determines whether Nigerian industry can compete at all,\u201d he said.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">Adegbemle lamented that unreliable electricity had compelled manufacturers to rely on self-generation, thereby increasing production costs and weakening the electricity market.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">He said more than 60 per cent of manufacturing firms have exited the national grid, opting instead for captive generation: \u201cThat exodus is not a footnote; it is the market\u2019s verdict on grid reliability, delivered in the only currency that matters: capital allocation. Manufacturers now spend upward of N45tn annually on diesel, petrol and captive gas generation, money that, redirected into the grid, could have funded the very transmission and stability upgrades the sector needs.\u201d<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">The power expert warned that the trend was eroding the financial viability of electricity market participants and worsening Nigeria\u2019s economic losses.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">\u201cThis is not a utilities problem. It is a solvency problem for the entire electricity value chain and, by extension, a competitiveness problem for Nigerian industry,\u201d he stated. <\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">While acknowledging reforms introduced under the Electricity Act 2023, Adegbemle argued that the legislation had yet to translate into a more reliable national grid.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">He mentioned that the newly announced Grid Asset Management Company is a reasonable instrument in isolation. However, he argued that \u201cadding another agency to a sector already thick with overlapping mandates does nothing to fix the underlying commercial failures: non-bankable power purchase agreements, chronic gas supply shortfalls, and a liquidity chain that breaks down at multiple points before cash ever reaches a generation company\u2019s balance sheet\u201d.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">He also cautioned against pursuing ambitious energy transition targets without first strengthening the country\u2019s transmission infrastructure.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">Drawing lessons from South Africa and Egypt, Adegbemle said both countries demonstrated that reliable electricity supply was achievable through sustained reforms, transparency and strong governance.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">\u201cWhat both demonstrate is that grid reliability is a governance output, not a resource endowment, and that Nigeria\u2019s constraint has never primarily been capital or technical know-how but the absence of a sustained, transparently reported turnaround plan that survives changes in political leadership,\u201d the statement read partly.<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">He urged the Federal Government to create incentives that would encourage industries to reconnect to the national grid, prioritise investment in transmission infrastructure and guarantee the operational independence of the Nigerian Independent System Operator.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">\u201cThe government must design credible incentives \u2013 tariff structures, offtake guarantees, and cross-subsidy mechanisms \u2013 that make grid power commercially rational for industrial anchor tenants to return to, rather than continuing to lose them to captive generation by default. Transmission investment and spinning reserve capacity need to be funded and sequenced ahead of, not alongside, renewable energy targets that the current network cannot absorb,\u201d he added.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">Urging greater accountability in the power sector, Adegbemle said Nigeria\u2019s electricity industry is not constrained by inadequate installed capacity, funding commitments, or reform policies, but by a longstanding inability to implement reforms effectively and enforce accountability for their execution.\n<\/p>\n<p data-amp-original-style=\"text-align: justify;\" class=\"amp-wp-7d27179\">\u201cThe question for Abuja is not whether the playbook exists. It is whether there is the political will to run it,\u201d he submitted.\n                    <\/p>\n","protected":false},"excerpt":{"rendered":"Power sector advocacy group, PowerUp Nigeria, has called on the Federal Government to urgently overhaul the national grid,&hellip;\n","protected":false},"author":2,"featured_media":83852,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[21249],"tags":[31820,36928,36929,2597,375,5963,2580,4156,36930,36931],"class_list":["post-83872","post","type-post","status-publish","format-standard","has-post-thumbnail","category-national-grid","tag-blackouts","tag-economic-impact","tag-electricity-crisis","tag-energy-policy","tag-infrastructure","tag-manufacturing","tag-national-grid","tag-nigeria","tag-power-sector","tag-powerup-nigeria"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@UnitedKingdom\/116927197506691296","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts\/83872","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/comments?post=83872"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts\/83872\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/media\/83852"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/media?parent=83872"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/categories?post=83872"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/tags?post=83872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}