{"id":86552,"date":"2026-07-20T12:51:08","date_gmt":"2026-07-20T12:51:08","guid":{"rendered":"https:\/\/www.europesays.com\/britain\/86552\/"},"modified":"2026-07-20T12:51:08","modified_gmt":"2026-07-20T12:51:08","slug":"national-grid-nerc-issues-guidelines-for-electricity-transmission-audit","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/britain\/86552\/","title":{"rendered":"National Grid: NERC issues guidelines for electricity transmission audit"},"content":{"rendered":"<p>The Nigerian Electricity Regulatory Commission, NERC has issued guidelines for the Technical Audit of the Electricity Transmission System and Network Data Validation, 2026.<\/p>\n<p>NERC disclosed this in a notice posted on its official X account on Monday.<\/p>\n<p>The regulator said the move is pursuant to Sections 34 and 226 of the Electricity Act, 2023, as well as Section 7.2.2 of the Grid Code.<\/p>\n<p>It noted that the Guidelines, which takes effect from 20 July 2026, are aimed at establishing a transparent framework for conducting periodic technical audits of Nigeria\u2019s electricity transmission system, validating transmission network data to enhance the reliability, safety, security, and operational efficiency of the national grid.<\/p>\n<p>Accordingly, NERC said the Guidelines apply to the Nigerian Independent System Operator, NISO and all licensed Transmission Service Providers, TSPs operating within the Nigerian Electricity Supply Industry, NESI.<\/p>\n<p>Specifically, the Guidelines require NISO to conduct a comprehensive technical assessment of the 330-kilovolt and 132-kilovolt transmission network at least once every five years.<\/p>\n<p>The notice reads: \u201cRequire NISO to engage suitably qualified consultants to conduct a comprehensive technical audit of the 330kV and 132kV transmission network at least once every five (5) years, or as otherwise directed by the Commission.<\/p>\n<p>\u201cMandate TSP to provide full access to transmission facilities, operational records, and other relevant information required for the audit.<\/p>\n<p>\u201cRequire TSP to prepare and implement Performance Improvement Plans based on the audit findings and submit annual implementation progress reports to the Commission.<\/p>\n<p>\u201cProvide minimum competency requirements, scope of work, and methodology for the engagement of consultants undertaking the technical audit.<\/p>\n<p>\u201cStakeholders are encouraged to familiarise themselves with the provisions of the Guidelines, which are available on the NERC website, nerc.gov.ng, and ensure full compliance.\u201d<\/p>\n<p>    You may like<\/p>\n","protected":false},"excerpt":{"rendered":"The Nigerian Electricity Regulatory Commission, NERC has issued guidelines for the Technical Audit of the Electricity Transmission System&hellip;\n","protected":false},"author":2,"featured_media":86553,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[21249],"tags":[2580,27448],"class_list":["post-86552","post","type-post","status-publish","format-standard","has-post-thumbnail","category-national-grid","tag-national-grid","tag-nerc"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@UnitedKingdom\/116952398685796383","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts\/86552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/comments?post=86552"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts\/86552\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/media\/86553"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/media?parent=86552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/categories?post=86552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/tags?post=86552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}