{"id":96802,"date":"2026-08-04T03:13:14","date_gmt":"2026-08-04T03:13:14","guid":{"rendered":"https:\/\/www.europesays.com\/britain\/96802\/"},"modified":"2026-08-04T03:13:14","modified_gmt":"2026-08-04T03:13:14","slug":"cubas-power-grid-collapses-again-during-restoration-efforts-after-nationwide-blackout","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/britain\/96802\/","title":{"rendered":"Cuba&#8217;s power grid collapses again during restoration efforts after nationwide blackout"},"content":{"rendered":"<p class=\"mb-4 text-lg md:leading-8 break-words\">HAVANA, Aug 3 (Reuters) &#8211; Cuba&#8217;s national electrical grid collapsed again on Monday as authorities struggled to restore power following a nationwide blackout late Sunday, state-run \u200cmedia reported, marking a fresh setback in the country&#8217;s deepening energy crisis.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The second \u200ccollapse in less than a day underscored the fragility of Cuba&#8217;s power system, which has become a potent \u200bsymbol of the island&#8217;s broader economic woes as fuel shortages, aging infrastructure and chronic underinvestment leave millions vulnerable to increasingly frequent blackouts.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">State television journalist Lazaro Manuel Alonso said a new disconnection of the National Electric System, or SEN, occurred on Monday afternoon despite progress made earlier in \u200crestoring service.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;A fluctuation caused the \u2060collapse,&#8221; Alonso reported.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The UNE power utility later said adverse weather conditions affected the transmission network during restoration efforts, directly impacting generating units that \u2060had already returned to service.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;During the process of restoring the SEN, existing weather conditions caused disruptions to the grid, directly affecting generating units that were online,&#8221; UNE said in a statement carried \u200bby state \u200bmedia.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">By early evening, authorities reported some progress, saying \u200bfour generating units at Energas Jaruco \u200cwere operating and several transmission substations around Havana had been re-energized.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The latest outage comes after three nationwide grid failures over a nine-day period in July and another collapse late Sunday, shortly before 11 p.m. (0300 GMT on Monday).<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Repeated blackouts have disrupted homes, businesses and public services across the Caribbean island of roughly 10 million people, adding to pressure on a \u200cgovernment already battling shortages of food, fuel and medicine \u200band a years-long economic downturn.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The electricity crisis has also \u200btaken on a diplomatic dimension. Cuba \u200bblames decades of U.S. sanctions and trade restrictions for limiting access \u200cto fuel, financing and spare parts needed \u200bto maintain its power \u200bsystem, while Washington says the outages reflect failures of the country&#8217;s state-run economic model.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Cuba&#8217;s thermal generating fleet, much of it decades old, has suffered recurring breakdowns as \u200bfuel shortages and maintenance problems \u200cstrain the grid, making the system increasingly vulnerable to disruptions and complicating efforts \u200bto restore power after major outages.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">(Reporting by Ayose Naranjo and Daina Beth \u200bSolomon; Editing by Kylie Madry and Stephen Coates)<\/p>\n","protected":false},"excerpt":{"rendered":"HAVANA, Aug 3 (Reuters) &#8211; Cuba&#8217;s national electrical grid collapsed again on Monday as authorities struggled to restore&hellip;\n","protected":false},"author":2,"featured_media":96803,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[21249],"tags":[34884,32422,972,41064,2580,28260],"class_list":["post-96802","post","type-post","status-publish","format-standard","has-post-thumbnail","category-national-grid","tag-cuba","tag-electrical-grid","tag-fuel-shortages","tag-manuel-alonso","tag-national-grid","tag-power-system"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@UnitedKingdom\/117035060785050209","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts\/96802","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/comments?post=96802"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/posts\/96802\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/media\/96803"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/media?parent=96802"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/categories?post=96802"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/britain\/wp-json\/wp\/v2\/tags?post=96802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}