{"id":124264,"date":"2026-07-10T10:47:08","date_gmt":"2026-07-10T10:47:08","guid":{"rendered":"https:\/\/www.europesays.com\/canada\/124264\/"},"modified":"2026-07-10T10:47:08","modified_gmt":"2026-07-10T10:47:08","slug":"meta-to-build-c13bn-data-centre-in-canada","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/canada\/124264\/","title":{"rendered":"Meta to build C$13bn data centre in Canada"},"content":{"rendered":"<p><img post-id=\"72940\" fifulocal-featured=\"1\" fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"425\" src=\"https:\/\/www.europesays.com\/canada\/wp-content\/uploads\/2026\/07\/meta.jpg\" alt=\"\" class=\"wp-image-72941\"  \/>A render of the 1GW data centre in Sturgeon County, Alberta (Meta)<\/p>\n<p>\nA joint venture of Clark Builders and PCL Construction has broken ground on a C$13bn, 1GW data centre in Sturgeon County, Alberta, the company\u2019s first in Canada.\n<\/p>\n<p class=\"wp-block-paragraph\">Meta also pledged to spend C$60m on local projects including roads and water infrastructure.<\/p>\n<p class=\"wp-block-paragraph\">At peak construction, 3,000 workers will be onsite building the facility at an industrial park. 300 people will work there when it\u2019s operating.<\/p>\n<p class=\"wp-block-paragraph\">Meta said it would generate $250m a year for Albertans through royalties, taxes, levies and fees.<\/p>\n<p class=\"wp-block-paragraph\">It will also become \u201cwater positive\u201d in 2030, Meta claimed, meaning it will restore more water to local watersheds than it consumes.<\/p>\n<p class=\"wp-block-paragraph\">In Alberta, Meta says it is conserving 200 acres of grasslands, trees and wetlands within the North Saskatchewan River watershed. The data centre has been designed to employ a closed-loop, liquid-cooled system with dry cooling, meaning there is no operational water use in the cooling system.<\/p>\n<p class=\"wp-block-paragraph\">Residents living near Meta data centres in Georgia have previously <a href=\"https:\/\/www.bbc.co.uk\/news\/articles\/cy8gy7lv448o\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">complained<\/a> about disruption to the water supply.<\/p>\n<p class=\"wp-block-paragraph\">In the first quarter of 2026, at least 75 data centre projects together worth approximately $130bn were disrupted by local opposition, <a href=\"https:\/\/www.datacenterwatch.org\/q1-2026\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">according<\/a> to Data Centre Watch.<\/p>\n<p class=\"wp-block-paragraph\">The Sturgeon Data Centre will be powered through a combination of grid-connected electricity and on-site natural gas. The Alberta Electric System Operator estimated that 1,200MW could be allocated for data centres without compromising the grid.<\/p>\n<p class=\"wp-block-paragraph\">Danielle Smith, Alberta\u2019s premier, <a href=\"https:\/\/www.sturgeoncounty.ca\/news-release-meta-makes-historic-investment-in-alberta\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">said<\/a>: \u201cArtificial intelligence is transforming the global economy, and Alberta is making sure we lead rather than follow. We created the right conditions to attract world-leading investments while protecting the interests of Albertans.\u201d<\/p>\n<p>Subscribe to our newsletter <a href=\"https:\/\/www.globalconstructionreview.com\/newsletter\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">here<\/a> to receive construction news and insights from around the world straight to your inbox<\/p>\n","protected":false},"excerpt":{"rendered":"A render of the 1GW data centre in Sturgeon County, Alberta (Meta) A joint venture of Clark Builders&hellip;\n","protected":false},"author":2,"featured_media":124265,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[17,12073,2132],"class_list":["post-124264","post","type-post","status-publish","format-standard","has-post-thumbnail","category-canada","tag-canada","tag-data-centre","tag-meta"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/posts\/124264","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/comments?post=124264"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/posts\/124264\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/media\/124265"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/media?parent=124264"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/categories?post=124264"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/tags?post=124264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}