{"id":141976,"date":"2026-07-24T05:21:14","date_gmt":"2026-07-24T05:21:14","guid":{"rendered":"https:\/\/www.europesays.com\/canada\/141976\/"},"modified":"2026-07-24T05:21:14","modified_gmt":"2026-07-24T05:21:14","slug":"canada-nickel-delivers-maiden-resource-at-nesbitt","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/canada\/141976\/","title":{"rendered":"Canada Nickel delivers maiden resource at Nesbitt"},"content":{"rendered":"<p><a href=\"https:\/\/canadanickel.com\/\" target=\"_blank\" rel=\"nofollow noopener\">Canada Nickel<\/a> (TSX-V:CNC) has delivered a maiden mineral resource estimate (MRE) for its Nesbitt Nickel Sulphide Project and a 46% increase in indicated resources at the Deloro Project in Ontario, Canada.<\/p>\n<p>The Nesbitt MRE marks the company\u2019s ninth resource estimate completed across the Timmins Nickel District. <\/p>\n<p>Located less than 3km northwest of the Crawford Nickel Sulphide Project, Nesbitt contains indicated resources of 24.5 million tonnes (Mt) grading 0.23% <a href=\"https:\/\/mining.com.au\/commodities\/nickel\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">nickel<\/a> (Ni) for 57,500 tonnes of contained metal, plus inferred resources of 152.1Mt @ 0.23% Ni for 351,000 tonnes of metal.<\/p>\n<p>The estimate is based on 10,031m of drilling across 28 drill holes completed between 2021 and 2026, modelled within two open pits using a 0.10% nickel cut-off grade. <\/p>\n<p>Canada Nickel notes the deposit extends 1.7km long, 0.8km wide, and down to 500m depth, remaining open in multiple directions.<\/p>\n<p>At Deloro, located 8km south of Timmins, indicated resources rose to 119Mt @ 0.25% Ni for 300,300 tonnes of contained metal. Meanwhile, inferred resources stand at 498Mt @ 0.25% Ni for 1.25Mt of contained metal. <\/p>\n<p>The update incorporates 21 new drill holes totalling 8,468m completed since July 2024.<\/p>\n<p>CEO Mark Selby says the results showcase the regional scope of the asset base.<\/p>\n<p>\u201cWe have now clearly demonstrated the world class potential of the Timmins Nickel District with the completion of our ninth resource at Nesbitt,\u201d Selby says.<\/p>\n<p>\u201cThe expansion at Deloro shows the potential to continue to expand our existing resources beyond where they stand today.\u201d<\/p>\n<p>Across nine properties in the district, Canada Nickel holds measured and indicated resources totalling 4.63 billion tonnes (Bt) @ 0.24% Ni for 10.3Mt contained metal and inferred resources of 5.70Bt @ 0.23% Ni for 13.2Mt contained metal.<\/p>\n<p>Seven additional targets remain untested across the company\u2019s footprint, including three targets with geophysical signatures larger than Crawford.<\/p>\n<p>The company intends to submit a technical report for both Nesbitt and Deloro within 45 days.<\/p>\n<p>Meanwhile, further studies and metallurgical testwork will continue through 2026, together with infill drilling, ahead of a preliminary economic assessment.<\/p>\n<p><a href=\"https:\/\/mining.com.au\/company\/canada-nickel\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Canada Nickel<\/a> is focused on advancing nickel-sulphide projects to supply the rapidly growing electric vehicle (EV) and stainless steel markets.<\/p>\n<p>Write to <a href=\"https:\/\/mining.com.au\/canada-nickel-delivers-maiden-resource-at-nesbitt\/mailto:paula.fabe@mining.com.au\" rel=\"nofollow noopener\" target=\"_blank\">Paula Fabe<\/a> at <a href=\"https:\/\/mining.com.au\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Mining.com.au<\/a><\/p>\n<p>Images: Mining.com.au<\/p>\n<p>Add to Watch List:Canada NickelNickel<\/p>\n","protected":false},"excerpt":{"rendered":"Canada Nickel (TSX-V:CNC) has delivered a maiden mineral resource estimate (MRE) for its Nesbitt Nickel Sulphide Project and&hellip;\n","protected":false},"author":2,"featured_media":141977,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[17,11191,19264,38545,33842,94,39716,41257],"class_list":["post-141976","post","type-post","status-publish","format-standard","has-post-thumbnail","category-canada","tag-canada","tag-drilling","tag-expansion","tag-metallurgical-testwork","tag-mineral-resource-estimate","tag-ontario","tag-regional","tag-technical-report"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/posts\/141976","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/comments?post=141976"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/posts\/141976\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/media\/141977"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/media?parent=141976"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/categories?post=141976"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/tags?post=141976"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}