{"id":277735,"date":"2026-11-04T04:47:25","date_gmt":"2026-11-04T04:47:25","guid":{"rendered":"https:\/\/www.europesays.com\/canada\/277735\/"},"modified":"2026-11-04T04:47:25","modified_gmt":"2026-11-04T04:47:25","slug":"esgold-signs-second-montauban-aggregate-reuse-mou","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/canada\/277735\/","title":{"rendered":"ESGold signs second Montauban aggregate reuse MoU"},"content":{"rendered":"<p><a href=\"https:\/\/esgold.com\/\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">ESGold<\/a> (CSE:ESAU) has signed a second non-binding memorandum of understanding (MoU) covering the potential reuse of treated mining residue from its Montauban Gold-Silver Project in Qu\u00e9bec, <a href=\"https:\/\/mining.com.au\/how-to-invest-in-canadian-mining-stocks-from-australia\/\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Canada<\/a>.<\/p>\n<p>The MoU with Qu\u00e9bec-based Gestion D.S. 50 covers the potential supply of up to 200,000 tonnes annually of neutralised residue for use as construction aggregate.<\/p>\n<p>It follows ESGold\u2019s October waste reuse <a href=\"https:\/\/mining.com.au\/esgold-eyes-new-revenue-stream-from-montauban-waste\/\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">agreement<\/a> with Culture H. Dolbec, which covers up to 300,000 tonnes a year. Combined, the two MoUs contemplate annual supply of as much as 500,000 tonnes.<\/p>\n<p>The volumes represent indicative maximums rather than guaranteed purchases or minimum commitments. Any deliveries remain subject to material characterisation, environmental testing, regulatory approvals, and definitive commercial agreements.<\/p>\n<p>ESGold has not disclosed potential pricing or other commercial terms.<\/p>\n<p>Montauban is permitted to process up to 300,000 tonnes of historical tailings annually. Processing beyond that capacity would require further approvals.<\/p>\n<p>The company plans to recover remaining <a href=\"https:\/\/mining.com.au\/how-gold-is-mined-and-processed\/\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">gold<\/a> and <a href=\"https:\/\/mining.com.au\/commodities\/silver\/\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">silver<\/a> before treating, neutralising, and stabilising the residual material for potential reuse in approved construction applications.<\/p>\n<p>CEO Gordon Robb says the agreements could broaden Montauban\u2019s potential revenue base while addressing historical mine waste.<\/p>\n<p>\u201cWe are building a model that seeks to address a century-old environmental legacy issue while creating new economic opportunities,\u201d Robb says.<\/p>\n<p>\u201cSeeing this level of regional interest in repurposing our treated material is an encouraging step toward realising that vision.\u201d<\/p>\n<p><a href=\"https:\/\/mining.com.au\/company\/esgold-corp\/\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">ESGold<\/a> is a Canadian developer constructing the permitted Montauban tailings reprocessing operation, approximately 80km west of Qu\u00e9bec City.<\/p>\n<p>Write to <a href=\"https:\/\/mining.com.au\/esgold-signs-second-montauban-aggregate-reuse-mou\/mailto:france.pinzon@mining.com.au\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">France Pinzon<\/a> at <a href=\"https:\/\/mining.com.au\/\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Mining.com.au<\/a><\/p>\n<p>Main image: ESGold<br \/>\n<a href=\"https:\/\/link.mining.com.au\/google-preferences\" aria-label=\"google-preferred-sources\" rel=\"nofollow noopener\" target=\"_blank\"><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/www.europesays.com\/canada\/wp-content\/uploads\/2026\/11\/1793767645_692_google-preferred-sources.webp\" alt=\"\"   width=\"338\" height=\"107\"\/><\/a><\/p>\n<p>Add to Watch List:ESGold CorpSilverGold<\/p>\n","protected":false},"excerpt":{"rendered":"ESGold (CSE:ESAU) has signed a second non-binding memorandum of understanding (MoU) covering the potential reuse of treated mining&hellip;\n","protected":false},"author":2,"featured_media":277736,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[77572,17,1720,38546,4869,241,77573],"class_list":["post-277735","post","type-post","status-publish","format-standard","has-post-thumbnail","category-canada","tag-approvals","tag-canada","tag-construction","tag-environmental","tag-memorandum-of-understanding","tag-quebec","tag-tailings"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/posts\/277735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/comments?post=277735"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/posts\/277735\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/media\/277736"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/media?parent=277735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/categories?post=277735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/canada\/wp-json\/wp\/v2\/tags?post=277735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}