Power was first sent from Dogger Bank in 2023, ahead of commercial operations, via the ‘A’ section of its three-phase development. When fully operational, the windfarm’s ‘A’, ‘B’ and ‘C’ phases, with a total of 277 wind turbines, will deliver clean energy to approximately six million homes from 2027, if all goes to schedule³.
We’re delivering the complete electrical system for the offshore substations for Dogger Bank A, B and C. The scope for Dogger Bank C includes auxiliary control systems, overall operational technology (OT) security, IT infrastructure, condition monitoring, telecoms, low voltage power distribution and bus ducts.
The final electrical substation for Dogger Bank C has recently been floated out to sea for installation, marking a major milestone in our electrical infrastructure delivery for the project.