Daystar Power Group, a Nigeria-based solar hybrid energy provider, has expanded its Nestlé partnership across West Africa. The operational installations now cover four Nestlé manufacturing facilities across Côte d’Ivoire, Ghana, and Senegal. The deployments have reached 6.884 MW across two Abidjan sites, one Tema factory, and one Dakar facility. In Côte d’Ivoire, Daystar Power has delivered 3.447 MW across Nestlé’s two Abidjan manufacturing locations. Ghana’s Tema factory has a 2.547 MW system, while Senegal’s Dakar facility has an 890 kW installation. All four sites are fully operational, with each system designed around its local grid and operational profile. Daystar Power said the partnership began with a single commissioning before expanding across three countries and four manufacturing facilities.