Switzerland
  • Europe
    • FR
    • DE
    • IT
    • ES
    • BE
    • NL
    • LU
    • DK
    • PL
    • UK
  • Switzerland
    • Basel
    • Bern
    • Geneva
    • Lausanne
    • Zürich
  • Schweiz
  • Suisse
  • Alps
  • Business
    • ABB
    • Chubb
    • Glencore
    • Nestlé
    • Novartis
    • Roche
    • UBS
    • Vitol
    • Zurich Insurance
  • NATO
  • US
  • UK
  • Africa
  • Afrique
  • CH

Categories

  • ABB
  • Alps
  • Basel
  • Bern
  • Chubb
  • Geneva
  • Glencore
  • Lausanne
  • Nestlé
  • Novartis
  • Roche
  • Switzerland
  • UBS
  • Vitol
  • Zürich
  • Zurich Insurance
Switzerland
  • Europe
    • FR
    • DE
    • IT
    • ES
    • BE
    • NL
    • LU
    • DK
    • PL
    • UK
  • Switzerland
    • Basel
    • Bern
    • Geneva
    • Lausanne
    • Zürich
  • Schweiz
  • Suisse
  • Alps
  • Business
    • ABB
    • Chubb
    • Glencore
    • Nestlé
    • Novartis
    • Roche
    • UBS
    • Vitol
    • Zurich Insurance
  • NATO
  • US
  • UK
  • Africa
  • Afrique
  • CH

Browsing Tag

Suiça

4 posts
AAlps
Switzerland took 17 years to tear through the Alps and build the world's largest railway tunnel, a 57.1 km passage under 2,300 meters of rock, with 50 °C heat and 28.2 million tons excavated to connect the north to the south of Europe.
Read More

Switzerland took 17 years to tear through the Alps and build the world’s largest railway tunnel, a 57.1 km passage under 2,300 meters of rock, with 50 °C heat and 28.2 million tons excavated to connect the north to the south of Europe.

  • 2026-06-21
Under the Swiss Alps, a railway project crosses rocks, extreme heat, and decades of planning to connect strategic…
SSwitzerland
Switzerland dug a hole the size of two football fields to install the most powerful underground battery on the planet, capable of releasing 1.2 GW in milliseconds, storing 2.1 GWh, and costing up to 5 billion Swiss francs.
Read More

Switzerland dug a hole the size of two football fields to install the most powerful underground battery on the planet, capable of releasing 1.2 GW in milliseconds, storing 2.1 GWh, and costing up to 5 billion Swiss francs.

  • 2026-05-17
Published on 17/05/2026 at 20:14 Underground project in Switzerland bets on giant energy storage to stabilize European electrical…
SSwitzerland
While countries compete for land for solar panels, Switzerland unrolls solar panels like a carpet between the tracks of an active railway.
Read More

While countries compete for land for solar panels, Switzerland unrolls solar panels like a carpet between the tracks of an active railway.

  • 2026-05-12
According to swissinfo, Switzerland has installed removable solar panels between the tracks of an operational railway, using a…
AAlps
A Swiss village pays 25,000 francs per adult and 10,000 francs per child for families who agree to live for years in the Alps, but imposes strict rules on age, residency, and property purchase.
Read More

A Swiss village pays 25,000 francs per adult and 10,000 francs per child for families who agree to live for years in the Alps, but imposes strict rules on age, residency, and property purchase.

  • 2026-05-09
Swiss Alpine village offers up to 25,000 francs per adult to attract residents, but requires long residency, age…
Switzerland
www.europesays.com