{"id":123830,"date":"2026-09-01T15:54:14","date_gmt":"2026-09-01T15:54:14","guid":{"rendered":"https:\/\/www.europesays.com\/ch\/123830\/"},"modified":"2026-09-01T15:54:14","modified_gmt":"2026-09-01T15:54:14","slug":"wison-fires-starting-gun-on-fpso-fabrication-for-enis-african-oil-gas-project","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/ch\/123830\/","title":{"rendered":"Wison fires starting gun on FPSO fabrication for Eni\u2019s African oil &#038; gas project"},"content":{"rendered":"<p>China-based energy services provider Wison New Energies (WNE) has confirmed the first steel cut for a newbuild floating production, storage and offloading (FPSO) vessel, destined for deployment at the next phase of a major oil and gas development off the coast of C\u00f4te d\u2019Ivoire, operated by Italy\u2019s Eni.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"533\" src=\"https:\/\/www.europesays.com\/ch\/wp-content\/uploads\/2026\/09\/First-steel-cut-for-Baleine-Phase-3-FPSO-project-Source-Wison-New-Energies.jpg\" alt=\"First steel cut for Baleine Phase 3 FPSO project; Source: Wison New Energies\" class=\"wp-image-799462\"  \/>First steel cut for Baleine Phase 3 FPSO project; Source: Wison New Energies<\/p>\n<p>The first steel was cut for the hull of the Baleine Phase 3 FPSO project on August 30, 2026, with Wison New Energies as the engineering, procurement, construction, installation, and commissioning (<a href=\"https:\/\/www.offshore-energy.biz\/altera-infrastructure-on-fpso-duty-for-enis-west-african-oil-gas-project\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">EPCIC<\/a>) <a href=\"https:\/\/www.offshore-energy.biz\/chinese-player-picks-up-fpso-job-for-enis-african-oil-gas-project\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">contractor thanks to its contract<\/a> with Eni and Altera Infrastructure.<\/p>\n<p>The Asian company was previously involved in the front-end engineering and design (FEED) phase. The official start-up of yard activities is said to mark an important step forward in the execution of the project as it moves into the construction phase.<\/p>\n<p>\u201cWe look forward to the project\u2019s next important milestone\u2014the first steel cut for the topsides\u2014and to maintaining this momentum as the project progresses toward successful delivery,\u201d emphasized Wison New Energies.<\/p>\n<p>The start of hull fabrication follows the <a href=\"https:\/\/www.offshore-energy.biz\/eni-moves-forward-with-third-chapter-of-oil-gas-project-in-west-africa\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">final investment decision (FID)<\/a> taken by Eni, Petroci, and Vitol in May 2026 for Baleine Phase 3. The development represents an investment of approximately $4 billion and is intended to bring the Baleine field to its full planned production potential.<\/p>\n<p>The new FPSO will be approximately 308 meters long, 57 meters wide, and 29.8 meters deep, with a design life of at least 20 years. The unit will be capable of processing around 90,000 barrels of oil per day, 160 million standard cubic feet of gas per day, and 80,000 barrels per day of produced water.<\/p>\n<p>The vessel will operate in water depths of approximately 800 to 1,200 meters and is expected to have crude storage capacity of around 1.4 million barrels. Phase 3 is expected to significantly expand the Baleine development.<\/p>\n<p>Once fully developed, overall production from the field is expected to reach approximately 150,000 barrels of oil per day, alongside around 200 million cubic feet per day of gas. The gas is intended to support C\u00f4te d\u2019Ivoire\u2019s domestic energy and industrial requirements.<\/p>\n<p>Several major international contractors have been hired to bring this project to life. SLB OneSubsea has been <a href=\"https:\/\/www.offshore-energy.biz\/after-technipfmc-eni-brings-onesubsea-onboard-cote-divoire-project\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">awarded an EPC contract<\/a>, covering subsea production systems for 13 wells, including subsea trees, manifolds, umbilicals, multiphase flowmeters and controls.<\/p>\n<p>TechnipFMC is responsible for <a href=\"https:\/\/www.offshore-energy.biz\/technipfmc-to-deliver-flexible-flowlines-and-risers-to-eni-in-cote-divoire\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">flexible flowlines and risers<\/a>, while Saipem is involved in <a href=\"https:\/\/www.offshore-energy.biz\/eni-strengthens-team-for-cote-divoire-project-with-saipem-now-on-board\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">rigid pipelines, subsea structures<\/a> and transportation and installation activities. Wison is now looking ahead to the first steel cut for the FPSO topsides, identified as the next major fabrication milestone.<\/p>\n<p>With hull fabrication now underway and the subsea and offshore packages progressing in parallel, the project is entering a critical phase on its path towards FPSO delivery and eventual production. Phase 3 is the third development phase of the Baleine field and builds on the phased development strategy used for the earlier stages of the project.<\/p>\n<p>The development is expected to further strengthen C\u00f4te d\u2019Ivoire\u2019s position as a significant offshore oil and gas producer while increasing the availability of domestic natural gas for the country\u2019s power and industrial sectors.<\/p>\n<p>\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"600\" src=\"https:\/\/www.europesays.com\/ch\/wp-content\/uploads\/2026\/09\/admin-ajax.jpg\" class=\"attachment-large size-large\" alt=\"OE logo\"  \/><\/p>\n<p>Power Your Brand With Offshore Energy \u2935\ufe0f<\/p>\n<p>Take the spotlight and anchor your brand in the heart of the offshore world! <\/p>\n<p>Join us for a bigger impact and amplify your presence at the core hub of the offshore energy community!<\/p>\n","protected":false},"excerpt":{"rendered":"China-based energy services provider Wison New Energies (WNE) has confirmed the first steel cut for a newbuild floating&hellip;\n","protected":false},"author":2,"featured_media":123831,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[125],"tags":[1678,1554,1555,158,60597],"class_list":["post-123830","post","type-post","status-publish","format-standard","has-post-thumbnail","category-vitol","tag-baleine","tag-eni","tag-petroci","tag-vitol","tag-wison-new-energies"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@ch\/117196598187209750","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts\/123830","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/comments?post=123830"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts\/123830\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/media\/123831"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/media?parent=123830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/categories?post=123830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/tags?post=123830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}