{"id":129602,"date":"2026-09-11T15:16:16","date_gmt":"2026-09-11T15:16:16","guid":{"rendered":"https:\/\/www.europesays.com\/ch\/129602\/"},"modified":"2026-09-11T15:16:16","modified_gmt":"2026-09-11T15:16:16","slug":"switzerland-turns-railway-tracks-into-a-working-solar-farm-2","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/ch\/129602\/","title":{"rendered":"Switzerland Turns Railway Tracks Into a Working Solar Farm"},"content":{"rendered":"<p class=\"mb-4 text-lg md:leading-8 break-words\">A working <a data-ylk=\"slk:railway;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/www.irishtimes.com\/world\/us\/2026\/08\/30\/is-that-a-solar-farm-or-a-train-track-in-one-swiss-town-its-both\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">railway<\/a> in a Swiss village is also, quietly, a solar power plant. On <a data-ylk=\"slk:24 April 2025;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/www.groupe-sncf.com\/en\/innovation\/solar-power-between-rails\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">24 April 2025<\/a>, Swiss startup <a data-ylk=\"slk:Sun-Ways;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/www.sun-ways.ch\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Sun-Ways<\/a> and regional rail operator TransN inaugurated what is described as the world&#8217;s first removable solar power plant installed on an active railway line open to regular traffic, on a 100-metre stretch of track near Buttes, canton Neuch\u00e2tel.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The timing is not accidental. Europe&#8217;s 2022 energy crisis sharpened the urgency for homegrown renewables, while <a data-ylk=\"slk:land;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/www.gadgetreview.com\/your-power-company-can-seize-your-land-for-ai-data-centers-heres-how-to-fight-back\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">land<\/a> scarcity makes new solar farms increasingly contentious. Rail companies, by contrast, already own continuous linear corridors across entire countries.<\/p>\n<p>How the Panels Fit Between the Trains<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Sun-Ways slots photovoltaic panels into the railbed itself, held by pistons and removable in minutes.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Sun-Ways&#8217; system places photovoltaic panels between the rails, resting on the sleepers and held in position by pistons pressing against the steel. A three-panel module, roughly 20 feet long, can be electrically disconnected and lifted clear in about 10 minutes by a single worker. The Buttes installation uses <a data-ylk=\"slk:48 panels;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/www.goodgoodgood.co\/articles\/switzerland-train-tracks-solar-panels\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">48 panels<\/a> rated at 380 W each, totalling 18 kWp across 104 metres of track, and is rated for train speeds up to 150 km\/h.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Results from the first year of operation are straightforward. The installation has generated more than 16,000 kWh of electricity, withstood more than 11,000 train passages without a recorded safety or operational conflict, and experienced roughly one month of downtime from snow accumulation and integration work. Valerio Tamellini, project manager at TransN, put it plainly: &#8220;This technology is rock solid.&#8221;<\/p>\n<p>Three Countries Are Now Watching<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">France, Italy, and South Korea have each moved to test or license the Sun-Ways approach on their own rail networks.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">France moved first among international partners. In February 2026, <a data-ylk=\"slk:SNCF signed a collaboration;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/www.groupe-sncf.com\/medias-publics\/2026-02\/cp_partenariat_groupe%20sncf_sunways.pdf\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">SNCF signed a collaboration<\/a> agreement with Sun-Ways to access performance data from Buttes, with the pilot running through April 2028 and covering glare, soiling, maintenance impact, and energy output. Nicolas Phan-Trong, SNCF&#8217;s head of energy and decarbonisation projects, stated the company&#8217;s position directly: &#8220;We want to become a big, <a data-ylk=\"slk:big solar energy producer.;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/www.nytimes.com\/2026\/08\/28\/climate\/solar-power-railway-train-tracks.html\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">big solar energy producer.<\/a>&#8221; SNCF&#8217;s network spans roughly 20,000 km, and teams also noted a secondary benefit: the panels suppress trackside weeds, potentially reducing vegetation management costs.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Italy is moving through a licensing arrangement. Engineer and consultant Giuseppe Fulco has licensed the Sun-Ways design for an Italian pilot, estimating that deploying on 20% of Italy&#8217;s railways, around 3,000 km of track, could yield approximately 1 GW of generating capacity, enough to supply electricity to up to one million homes.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">South Korea approved a <a data-ylk=\"slk:two-year pilot;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/www.bostonglobe.com\/2026\/08\/28\/world\/is-that-solar-farm-or-train-track-one-swiss-town-its-both\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">two-year pilot<\/a> in September 2025 at the Korea Railroad Research Institute&#8217;s test track, evaluating the technology under local climatic and operational conditions.<\/p>\n<p>The Challenge Still Sitting on the Grid Side<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The mechanical design has proven itself; the harder work now involves minimising electrical losses when power flows beyond the trains themselves.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The mechanical case is largely made. The harder problem is electrical. Sun-Ways founder Joseph Scuderi acknowledges that routing excess power beyond trains to the wider grid introduces transmission losses. Julien Pouget, a researcher at HES-SO Valais, is developing a specialised <a data-ylk=\"slk:electrical architecture;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/www.swissinfo.ch\/eng\/emissions-reduction\/solar-energy-from-railways-shows-first-positive-results-in-switzerland\/91628036\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">electrical architecture<\/a> to reduce those losses. His team presented findings at a power systems summit in Paris.<\/p>\n<p>What 2028 Will Settle<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The Buttes pilot&#8217;s economics, assessed when the test concludes in 2028, will determine whether rail-mounted solar scales from a Swiss village to a global standard.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Rail companies already own the land. That removes the primary cost barrier: conventional ground-mounted solar requires roughly 2.5 acres per megawatt and is increasingly difficult to site. Sun-Ways estimates that full deployment across Switzerland&#8217;s 3,000-plus kilometres of rail could supply up to 30% of the country&#8217;s public <a data-ylk=\"slk:transport;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/www.gadgetreview.com\/14-personal-transport-vehicles-that-will-blow-your-mind\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">transport<\/a> energy needs. Tamellini expects the full economics to come into focus when the Buttes pilot concludes in 2028, a verdict that will shape whether similar deployments follow on rail networks worldwide.<\/p>\n","protected":false},"excerpt":{"rendered":"A working railway in a Swiss village is also, quietly, a solar power plant. On 24 April 2025,&hellip;\n","protected":false},"author":2,"featured_media":129603,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[4],"tags":[48447,48445,63067,34708,734,63066,17],"class_list":["post-129602","post","type-post","status-publish","format-standard","has-post-thumbnail","category-switzerland","tag-buttes","tag-photovoltaic-panels","tag-rail-companies","tag-sncf","tag-solar-energy","tag-solar-power-plant","tag-switzerland"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@ch\/117253071543121194","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts\/129602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/comments?post=129602"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts\/129602\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/media\/129603"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/media?parent=129602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/categories?post=129602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/tags?post=129602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}