{"id":163419,"date":"2026-11-20T08:56:46","date_gmt":"2026-11-20T08:56:46","guid":{"rendered":"https:\/\/www.europesays.com\/ch\/163419\/"},"modified":"2026-11-20T08:56:46","modified_gmt":"2026-11-20T08:56:46","slug":"data-centres-will-need-10-of-swiss-electricity-by-20250-2","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/ch\/163419\/","title":{"rendered":"Data centres will need 10% of Swiss electricity by 20250"},"content":{"rendered":"<p>    <img src=\"https:\/\/www.europesays.com\/ch\/wp-content\/uploads\/2026\/11\/1795165005_935_926f07e526b6aced0f4503d884a1020c25486223-92409594.jpg\" width=\"1400\" height=\"1050\" alt=\"Data centres will account for 10 per cent of Switzerland\u2019s electricity consumption\" loading=\"eager\" decoding=\"sync\" fetchpriority=\"high\"\/><\/p>\n<p>                Data centres will account for 10 per cent of Switzerland\u2019s electricity consumption            <\/p>\n<p>            Keystone-SDA        <\/p>\n<p>        The growth of artificial intelligence (AI) and digitalisation will significantly increase the energy requirements of data centres in Switzerland.\n<\/p>\n<p>            Listen to the article        <\/p>\n<p>            Listening the article        <\/p>\n<p>                Toggle language selector            <\/p>\n<p>                            English (US)                        <\/p>\n<p>                            English (British)                        <\/p>\n<p>            Generated with artificial intelligence.        <\/p>\n<p>        This content was published on    <\/p>\n<p>        November 20, 2026 &#8211; 08:50\n<\/p>\n<p><a href=\"https:\/\/www.swissinfo.ch\/eng\/geopolitics\/?utm_campaign=Swiss-Interested&amp;utm_source=swi&amp;utm_medium=ENG&amp;utm_id=Traffic&amp;utm_term=website&amp;utm_content=geopolitics\" rel=\"nofollow noopener\" target=\"_blank\">+Switzerland\u2019s position on world affairs<\/a><\/p>\n<p class=\"wp-block-paragraph\">By 2050, this infrastructure could consume between 2.5 and 7 terawatt-hours (TWh) of electricity per year, accounting for up to 10% of projected national consumption.<\/p>\n<p class=\"wp-block-paragraph\">This is according to a study carried out by the Association of Swiss Electricity Companies (AES) in collaboration with the consultancy firm Deloitte. In 2024, according to previous research, data centres had consumed around 2.1 TWh, equivalent to 3.6% of national electricity demand.<\/p>\n<p>\n    More<\/p>\n<p>    <img src=\"https:\/\/www.europesays.com\/ch\/wp-content\/uploads\/2026\/11\/1795165005_241_679051440_highres.jpg\" width=\"1300\" height=\"975\" alt=\"fans on the rooftop of datacenters\" loading=\"lazy\" decoding=\"async\" fetchpriority=\"auto\"\/><\/p>\n<p>        More    <\/p>\n<p>        Swiss AI\n        <\/p>\n<p>        Swiss researchers push to make AI data centres more sustainable    <\/p>\n<p class=\"teaser-wide-card__excerpt\">\n<p>                        This content was published on                    <\/p>\n<p>                        Jul 21, 2026                    <\/p>\n<p>                Researchers in Switzerland are developing solutions to reduce the growing energy and water demands of AI data centres. Will it be enough?            <\/p>\n<p>    <a class=\"teaser-wide-card__link\" href=\"https:\/\/www.swissinfo.ch\/eng\/swiss-ai\/swiss-researchers-push-to-make-ai-data-centres-more-sustainable\/91757049\" target=\"_self\" rel=\"nofollow noopener\"><\/p>\n<p>            Read more: Swiss researchers push to make AI data centres more sustainable<br \/>\n    <\/a><\/p>\n<p class=\"wp-block-paragraph\">The current study combines the AES\u2019s new energy forecasts up to 2050 with a representative survey of 1,300 people, a survey of 155 member companies and interviews with experts from the energy, technology, finance, telecommunications and research sectors.<\/p>\n<p class=\"wp-block-paragraph\">According to the authors of the analysis, the increase in consumption will be largely manageable, provided that domestic electricity generation, import capacity and grid infrastructure grow in tandem. <\/p>\n<p class=\"wp-block-paragraph\">The main challenge will therefore not only concern the availability of energy, but above all the ability to distribute it where and when it is needed. Data centres can, in fact, be built much more quickly than the power stations required to supply them.<\/p>\n<p class=\"wp-block-paragraph\">The availability of connection capacity at local and regional level thus risks becoming a limiting factor for the sector\u2019s development. This problem is confirmed by a survey of electricity companies: 86% of operators surveyed consider grid capacity and the long time required to upgrade it to be key factors.<\/p>\n<p class=\"wp-block-paragraph\">According to Chris Tattersall, partner and head of the energy sector at Deloitte Switzerland, it will therefore be essential to plan infrastructure development in advance and to establish clear rules for the allocation of connection capacity, as well as for the sharing of investment costs and risks.<\/p>\n<p>\n    More<\/p>\n<p>    <img src=\"https:\/\/www.europesays.com\/ch\/wp-content\/uploads\/2026\/11\/1795165006_649_694449770_highres.jpg\" width=\"1300\" height=\"867\" alt=\"a child holding protest signs against a data centre\" loading=\"lazy\" decoding=\"async\" fetchpriority=\"auto\"\/><\/p>\n<p>        More    <\/p>\n<p>        Swiss AI\n        <\/p>\n<p>        These five charts explain why nobody wants a data centre next door    <\/p>\n<p class=\"teaser-wide-card__excerpt\">\n<p>                        This content was published on                    <\/p>\n<p>                        Jul 5, 2026                    <\/p>\n<p>                Around the world, communities are increasingly concerned about the amount of electricity, water and land these facilities require.            <\/p>\n<p>    <a class=\"teaser-wide-card__link\" href=\"https:\/\/www.swissinfo.ch\/eng\/swiss-ai\/these-five-charts-explain-why-nobody-wants-a-data-centre-next-door\/91693282\" target=\"_self\" rel=\"nofollow noopener\"><\/p>\n<p>            Read more: These five charts explain why nobody wants a data centre next door<br \/>\n    <\/a><\/p>\n<p class=\"wp-block-paragraph\">The situation will also be particularly delicate during the winter months, when Switzerland is most dependent on electricity imports. In this context, the AES emphasises that an electricity agreement with the European Union would be an important step towards securing the necessary foreign supply capacity.<\/p>\n<p class=\"wp-block-paragraph\">Public opinion must also be taken into account. According to the survey, 38% of Swiss people are in favour of building further data centres in Switzerland, whilst a further 37% prefer a combination of infrastructure both domestically and abroad. <\/p>\n<p class=\"wp-block-paragraph\">Among the conditions considered most important are the recovery of heat generated by the facilities \u2013 cited by 42% of respondents \u2013 job creation (34%) and infrastructure operators bearing the costs of upgrading the electricity grid (35%).<\/p>\n<p class=\"wp-block-paragraph\">Finally, the expansion of data centres raises issues relating to digital sovereignty. According to the specialists involved in the study, it is not necessary for all data and applications to be physically managed in Switzerland. <\/p>\n<p class=\"wp-block-paragraph\">For particularly sensitive applications, however, appropriate conditions must be guaranteed in terms of control, security, availability and the ability to transfer information and services.<\/p>\n<p class=\"wp-block-paragraph\">+\u00a0<a href=\"https:\/\/www.swissinfo.ch\/eng\/about-us\/how-swissinfo-produces-news-in-english\/91695684\" rel=\"nofollow noopener\" target=\"_blank\">How we produce news in English<\/a><br \/>Translated from Italian, reviewed by an\u00a0<a href=\"https:\/\/www.swissinfo.ch\/eng\/department\/english-department\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">English Department<\/a> journalist.\u00a0<\/p>\n<p><a href=\"https:\/\/www.swissinfo.ch\/eng\/swiss-business-economy-news\/\" rel=\"noopener nofollow\" aria-label=\"Business news newsletter\" target=\"_blank\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/www.europesays.com\/ch\/wp-content\/uploads\/2026\/11\/1795165006_135_Teaser-Banner-business-news-NL-subscription-November-2026.png\" alt=\"Business news newsletter\"   width=\"1000\" height=\"480\"\/><\/a><\/p>\n<p>        Articles in this story    <\/p>\n","protected":false},"excerpt":{"rendered":"Data centres will account for 10 per cent of Switzerland\u2019s electricity consumption Keystone-SDA The growth of artificial intelligence&hellip;\n","protected":false},"author":2,"featured_media":163420,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[4],"tags":[101,9334,457,100,103,1434,41,17],"class_list":["post-163419","post","type-post","status-publish","format-standard","has-post-thumbnail","category-switzerland","tag-article","tag-beat-swiss-ai","tag-environment","tag-latest-news","tag-production-type-deepl-autotranslation","tag-sci-tech","tag-swiss","tag-switzerland"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@ch\/117647942769200067","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts\/163419","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/comments?post=163419"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts\/163419\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/media\/163420"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/media?parent=163419"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/categories?post=163419"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/tags?post=163419"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}