{"id":43340,"date":"2026-04-02T07:28:07","date_gmt":"2026-04-02T07:28:07","guid":{"rendered":"https:\/\/www.europesays.com\/ch\/43340\/"},"modified":"2026-04-02T07:28:07","modified_gmt":"2026-04-02T07:28:07","slug":"abb-and-voltagrid-extend-collaboration-on-data-centre-power-infrastructure","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/ch\/43340\/","title":{"rendered":"ABB and VoltaGrid Extend Collaboration on Data Centre Power Infrastructure"},"content":{"rendered":"<p>ABB has secured additional orders from VoltaGrid to supply power infrastructure for global data centre projects supporting artificial intelligence workloads.<\/p>\n<p>New agreement supports growing power demand from AI data centres<\/p>\n<p>The agreement extends the companies\u2019 existing collaboration to deliver stable and rapidly deployable power solutions for hyperscale AI infrastructure.<\/p>\n<p>Under the agreement, ABB will provide 35 synchronous condensers with flywheel technology along with associated prefabricated eHouse units to the Texas-based microgrid power generation company\u00a0. The orders are expected to be booked in the second quarter of 2026.<\/p>\n<p><img loading=\"lazy\" data-dominant-color=\"3a3635\" data-has-transparency=\"false\" style=\"--smush-placeholder-width: 1536px; --smush-placeholder-aspect-ratio: 1536\/1003;--dominant-color: #3a3635;\" decoding=\"async\" width=\"1536\" height=\"1003\" src=\"https:\/\/www.emeoutlookmag.com\/media\/ABB-1536x1003.webp\" alt=\"\" class=\"wp-image-58590 not-transparent lazyload\" bad-src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\"\/>Luke Saladyga, Chief Technology Officer of VoltaGrid; Brandon Spencer, ABB Executive Committee Member &amp; President, Motion; Nathan Ough, President &amp; CEO of VoltaGrid; Per Erik Holsten President, ABB\u2019s Energy Industries division; Peter Terwiesch, ABB Executive Committee Member &amp; President, AutomationPower stability for next-generation AI infrastructure<\/p>\n<p>The equipment will support VoltaGrid\u2019s expanding data centre power platform, delivering the voltage stability required by high-performance AI computing systems.<\/p>\n<p>Synchronous condensers act as stabilising assets within VoltaGrid\u2019s behind-the-meter power solutions. They provide instantaneous inertia, support short-circuit events and maintain network voltage through reactive power management, helping ensure resilient operation for high-density data centre loads.<\/p>\n<p>ABB\u2019s scope also includes high-availability medium- and low-voltage distribution infrastructure and excitation systems, designed to maximise system reliability and uptime.<\/p>\n<p>Expanding distributed power solutions for hyperscale computing<\/p>\n<p>The collaboration aims to accelerate the deployment of power infrastructure designed specifically for the needs of AI data centres.<\/p>\n<p>\u201cVoltaGrid\u2019s power platform is purpose-built to deliver large-scale power with exceptional dynamic performance and reliability for next-generation digital infrastructure,\u201d said Nathan Ough, CEO of VoltaGrid.<\/p>\n<p>\u201cBy integrating ABB\u2019s advanced grid stabilization technologies with our AI-optimized power systems, we are able to meet increasingly stringent transient performance requirements while accelerating deployment at gigawatt scale.\u201d<\/p>\n<p>VoltaGrid\u2019s systems are designed to combine performance and speed with operational efficiency, reduced noise and a compact footprint.<\/p>\n<p>Integrated offering across ABB technology divisions<\/p>\n<p>The partnership brings together capabilities from multiple ABB business areas, including automation, electrification and motion technologies.<\/p>\n<p>\u201cExtending our collaboration with VoltaGrid demonstrates the strength of ABB\u2019s businesses working together combining automation, electrification and motion expertise and technologies with innovative distributed power systems to create greater value for customers,\u201d said Per Erik Holsten, President of ABB\u2019s Energy Industries division.<\/p>\n<p>\u201cTogether, we are enabling reliable, resilient and scalable power infrastructure for data centers serving the rapidly growing AI economy.\u201d<\/p>\n<p><img loading=\"lazy\" data-dominant-color=\"91adbf\" data-has-transparency=\"false\" style=\"--smush-placeholder-width: 806px; --smush-placeholder-aspect-ratio: 806\/610;--dominant-color: #91adbf;\" decoding=\"async\" width=\"806\" height=\"610\" src=\"https:\/\/www.emeoutlookmag.com\/media\/ABB-HQ-Zurich.webp\" alt=\"\" class=\"wp-image-58591 not-transparent lazyload\" bad-src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\"\/>ABB HQ Zurich SwitzerlandRising energy demand from global data centres<\/p>\n<p>The project comes as energy demand from data centres continues to grow globally. Data centres accounted for approximately 1.5 percent of the world\u2019s electricity consumption in 2024, with the United States responsible for around 45 percent of this total.<\/p>\n<p>ABB supports data centres worldwide with automation, electrification and digitalisation technologies designed to improve reliability, efficiency and scalability as demand for digital infrastructure increases.<\/p>\n","protected":false},"excerpt":{"rendered":"ABB has secured additional orders from VoltaGrid to supply power infrastructure for global data centre projects supporting artificial&hellip;\n","protected":false},"author":2,"featured_media":43341,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[130],"tags":[232,25035],"class_list":{"0":"post-43340","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-abb","8":"tag-abb","9":"tag-insights"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@ch\/116333936951104773","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts\/43340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/comments?post=43340"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts\/43340\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/media\/43341"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/media?parent=43340"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/categories?post=43340"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/tags?post=43340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}