{"id":60881,"date":"2026-05-06T10:07:10","date_gmt":"2026-05-06T10:07:10","guid":{"rendered":"https:\/\/www.europesays.com\/ch\/60881\/"},"modified":"2026-05-06T10:07:10","modified_gmt":"2026-05-06T10:07:10","slug":"alstom-to-modernise-lausannes-m2-metro-with-new-cbtc-system-and-fleet-mid-life-upgrade","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/ch\/60881\/","title":{"rendered":"Alstom To Modernise Lausanne\u2019S M2\u00a0Metro With New Cbtc System And Fleet Mid-Life Upgrade"},"content":{"rendered":"<p class=\"transition-opacity duration-300\">Transports publics de la r\u00e9gion lausannoise (tl) and Alstom have signed a contract worth 295\u00a0million euros1\u00a0to modernise Lausanne\u2019s m2\u00a0metro line. The project will enable more frequent services and increased passenger capacity through the deployment of a new communications based train control (CBTC) system, combined with the mid-life modernisation of the existing train fleet.<\/p>\n<p class=\"transition-opacity duration-300\">The m2\u00a0metro is the backbone of public transport in the Lausanne region. The new signalling system will allow trains to operate closer together with greater precision, enabling more trains to run on the line, reducing waiting times and supporting growing passenger demand, while maintaining the highest levels of safety and reliability.<\/p>\n<p class=\"transition-opacity duration-300\">The Urbalis Fluence CBTC solution selected for the project uses a train\u2011centric architecture, with more intelligence onboard to maximise capacity and operational flexibility while limiting infrastructure changes and additional trackside equipment. It is well suited to modernising existing, fully automated metro lines, improving performance while making best use of current assets and enabling phased upgrades aligned with long\u2011term network strategies.<\/p>\n<p class=\"transition-opacity duration-300\">Alongside the signalling upgrade, the m2\u00a0fleet will undergo a major mid\u2011life modernisation at Alstom\u2019s site in Villeneuve in Switzerland, effectively extending the lifetime of the metro cars. The FlexCare Modernise programme will consist in renewing key onboard systems, notably the train control and monitoring system (TCMS), which will be fully integrated with the new CBTC signalling, as well as in enhancements to interior areas and a refresh of trains\u2019 exterior. Together, these upgrades will unlock higher capacity, improved reliability and a smoother passenger experience, demonstrating Alstom\u2019s capability to deliver complex mid-life modernisation programmes fully integrated with advanced digital signalling systems.<\/p>\n<p class=\"transition-opacity duration-300\">Patricia Solioz Mathys, CEO of tl, emphasises the importance of modernisation: \u201cAs Switzerland\u2019s only metro system, m2\u00a0is a real success story. The need to modernise the automation systems and increase capacity is crucial for the whole transport network in the Lausanne metropolitan area. We are delighted to be able to rely on Alstom\u2019s expertise and knowledge in carrying out these strategic operations.\u201d<\/p>\n<p class=\"transition-opacity duration-300\">\u201cThis modernisation will bring more frequent, more reliable journeys for passengers and help the city meet growing demand with shorter waits and a smoother ride. By pairing our new-generation, train-centric CBTC with a fully integrated mid-life upgrade of the fleet, we are boosting capacity while extending the performance of the existing trains for years to come. We are very happy to engage in this new project with tl and look forward to many years of continuous long-standing collaboration ,\u201d said Marie Icardo, Managing Director of Alstom Switzerland.<\/p>\n<p class=\"transition-opacity duration-300\">The agreement also includes technical support and obsolescence management services, securing reliable operation of the m2\u00a0line through the transition period and beyond.<\/p>\n<p class=\"transition-opacity duration-300\">The works will be carefully phased to minimise disruption to daily services. Most installation and testing activities will be carried out during short night time windows, ensuring that passenger services can be maintained throughout the programme. This reflects the brownfield nature of the project, integrating a new generation CBTC system into a fully operational metro line.<\/p>\n<p class=\"transition-opacity duration-300\">About tl<\/p>\n<p class=\"transition-opacity duration-300\">Transports publics de la r\u00e9gion lausannoise (tl) design, organise and operate daily public transport services for some 360,000\u00a0passengers. Every day, more than 2,000\u00a0staff members help to keep the network running. As a key player in the region and a recognised partner of local authorities, the tl contributes to the economic and social development of the Olympic capital.<\/p>\n<p class=\"transition-opacity duration-300\">ALSTOM\u2122, Urbalis Fluence\u2122 and FlexCare Modernise\u2122 are protected trademarks of the Alstom Group.<\/p>\n<p class=\"transition-opacity duration-300\">1.This order was booked in the 4th quarter of Alstom\u2019s 2025\/2026\u00a0financial year. It is the order referred to in the Note to Investors published on 8\u00a0April 2026\u00a0(\u201cAlstom signs a new Signalling contract in Europe\u201d).<\/p>\n<p class=\"transition-opacity duration-300\">www.alstom.com<\/p>\n<p class=\"transition-opacity duration-300\">\u00a0\u00a0Ask For More Information\u2026<\/p>\n","protected":false},"excerpt":{"rendered":"Transports publics de la r\u00e9gion lausannoise (tl) and Alstom have signed a contract worth 295\u00a0million euros1\u00a0to modernise Lausanne\u2019s&hellip;\n","protected":false},"author":2,"featured_media":60882,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[26709,26711,26715,26717,4609,26716,26710,26713,94,26714,26712],"class_list":{"0":"post-60881","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-lausanne","8":"tag-construction-news","9":"tag-engineering-news","10":"tag-global-construction-projects","11":"tag-global-investment","12":"tag-industry-insights","13":"tag-infrastructure-export-deal","14":"tag-infrastructure-updates","15":"tag-latest-project-developments","16":"tag-lausanne","17":"tag-major-construction-news","18":"tag-megaproject-news"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@ch\/116527080762736007","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts\/60881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/comments?post=60881"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/posts\/60881\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/media\/60882"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/media?parent=60881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/categories?post=60881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/ch\/wp-json\/wp\/v2\/tags?post=60881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}