Poland and the United Kingdom have agreed to co-develop CAMM-MR, a medium-range air defence missile expected to engage targets beyond 100 kilometers. The two governments signed the intergovernmental agreement on 24 November, in Gdynia, at the keel-laying ceremony for Poland’s third Miecznik-class frigate. Poland’s Defence Ministry and the UK Minister for Defence Procurement signed it. The agreement sets the legal and financial framework for the project and commits both countries to a single missile design for Poland’s new warships and ground-based air-defence systems. CAMM-MR, short for “Common Anti-Air Modular Missile, Medium Range,” is a development of MBDA’s CAMM family.

Poland’s Armament Agency will work with MBDA UK and the state-owned defence group PGZ on detailed design and development, following a 2023 letter of intent between MBDA and PGZ. The agreement does not commit either side to procurement contracts or production schedules. It is the basis for a follow-on design contract that will divide workshare between the two countries. Both governments have pledged to fund development, and the programme includes technology transfer and Polish industrial participation.

Poland and UK Partner on New 100 km-Range CAMM-MR Air Defense Interceptor. (MBDA via Polish Armament Agency)

CAMM-MR is larger and has a longer range than CAMM and CAMM-ER, which Poland has already purchased. Alongside the Patriot-based Wisła and the short-range Pilica+, it would defend against aircraft, helicopters and cruise missiles at greater distances than Poland can cover now, filling the gap between CAMM-ER and Patriot-class systems. The Armament Agency says the missile will draw on operational experience with the CAMM family. It will be fitted to the three Miecznik frigates, expected to enter service around 2030 to 2032, and to land-based Narew batteries. MBDA and the Armament Agency have released no specifications beyond the range, though a 2023 report said CAMM-MR should be able to engage targets beyond 100 km and above 20 km in altitude.

It is Poland’s first international government-industry co-development of an air-defence missile. UK Defence Minister Luke Pollard, who attended the signing, called it “the next chapter of cooperation between our two countries” and said the project will develop new technology together, bolster both nations’ defences and create jobs.

The Armament Agency, PGZ and MBDA UK must still negotiate a detailed design contract, followed later by a supply contract timed to the completion of the Miecznik frigates. No cost estimates or firm timelines have been announced. In the meantime, Poland will keep operating its existing CAMM and CAMM-ER stocks.