{"id":34532,"date":"2026-10-13T00:50:26","date_gmt":"2026-10-13T00:50:26","guid":{"rendered":"https:\/\/www.europesays.com\/conflicts\/34532\/"},"modified":"2026-10-13T00:50:26","modified_gmt":"2026-10-13T00:50:26","slug":"pentagon-certifies-production-capacity-for-second-ddg-at-gd-biw","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/conflicts\/34532\/","title":{"rendered":"Pentagon certifies production capacity for second DDG at GD BIW"},"content":{"rendered":"<p>                Written by<br \/>\n                <a href=\"https:\/\/www.marinelog.com\/author\/marinelogstaff\/\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                    Marine Log\u00a0Staff<\/a><\/p>\n<p>                <img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.europesays.com\/conflicts\/wp-content\/uploads\/2026\/10\/HULL-455-PAUL-HAMILTON-DDG-60-768x593-1.jpg\" alt=\"DDG built at BIW\" width=\"755\" height=\"402\"\/><\/p>\n<p class=\"caption\">Photo: GD BIW<\/p>\n<p class=\"wp-block-paragraph\">The Department of War announced today that, following a comprehensive, multi-phase due diligence review, it has determined that significant operational and managerial improvements at General Dynamics Bath Iron Works (<a href=\"https:\/\/www.marinelog.com\/?s=%22Bath+Iron+Works%22\" rel=\"nofollow noopener\" target=\"_blank\">BIW)<\/a> have established the capacity and stability necessary to support the potential construction of a second guided-missile destroyer <a href=\"https:\/\/www.gdbiw.com\/what-we-do\/naval-combatants\/arleigh-burke-class-destroyers\/#class-flights\" rel=\"nofollow noopener\" target=\"_blank\">(DDG)<\/a>.<\/p>\n<p class=\"wp-block-paragraph\">The department says that its thorough review evaluated production throughput, schedule adherence, quality assurance benchmarks, supply chain resilience, and workforce optimization at the Bath, Maine, shipyard. Based on verifiable performance enhancements and leadership initiatives implemented across the facility, the department concluded that building an additional Arleigh Burke-class (DDG 51) destroyer at BIW is feasible and strategically advantageous for the Navy\u2019s fleet, should Congress secure the necessary funding.<\/p>\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\">\n<p lang=\"en\" dir=\"ltr\">I have advocated for a second destroyer to be included in this year\u2019s budget, and I worked with the Administration during its careful review and repeated visits to BIW to verify the ability of the shipyard to construct another ship.<a href=\"https:\/\/t.co\/YuKDMHgnzO\" rel=\"nofollow\">https:\/\/t.co\/YuKDMHgnzO<\/a><\/p>\n<p>\u2014 Sen. Susan Collins (@SenatorCollins) <a href=\"https:\/\/x.com\/SenatorCollins\/status\/2109649111636902254?ref_src=twsrc%5Etfw\" rel=\"nofollow\">October 12, 2026<\/a><\/p><\/blockquote>\n<p class=\"wp-block-paragraph\">\u201cToday\u2019s decision by the Department of War validates the capacity of Bath Iron Works (BIW) and the hard work of its highly skilled 6,800 employees who build the best ships in the world. I have advocated for a second destroyer to be included in this year\u2019s budget, and I worked with the Administration during its careful review and repeated visits to BIW to verify the ability of the shipyard to construct another ship while continuing to complete its current workload,\u201d said Senator Susan Collins (R.-Me). \u201cThis certification will help keep our Navy strong and support BIW as a steady source of good-paying Maine jobs. I will continue to work to ensure our shipbuilders have the resources to meet the Navy\u2019s needs at a time when China is relentlessly expanding its fleet.\u201d<\/p>\n<p class=\"wp-block-paragraph\">\u201cOur national security requires an industrial base that can respond to demands for increased speed and volume,\u201d said Deputy Secretary of War Steve Feinberg. \u201cAfter a rigorous review, Bath Iron Works has proven it has the capacity and stability to support construction of a second destroyer. While the operational improvements we have seen at BIW are a significant step in the right direction, the shipyard must continue this momentum to fully resolve legacy production challenges \u2013 sustained performance is essential. The Department will continue to partner with contractors who prioritize execution, accountability, and the rapid modernization of our forces.\u201d<\/p>\n<p class=\"wp-block-paragraph\">The department says that the decision to certify the shipyard\u2019s capacity for a second destroyer aligns with the Administration\u2019s broader campaign to revitalize the U.S. Maritime Industrial Base and outmatch global pacing threats. To counter aggressive ship-construction timelines by foreign adversaries, the department is prioritizing long-term stability and capacity-building across the domestic shipbuilding supply chain.<\/p>\n<p>            RELATED ARTICLES<\/p>\n","protected":false},"excerpt":{"rendered":"Written by Marine Log\u00a0Staff Photo: GD BIW The Department of War announced today that, following a comprehensive, multi-phase&hellip;\n","protected":false},"author":2,"featured_media":34533,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[14834,21277,21519,215,5709],"class_list":["post-34532","post","type-post","status-publish","format-standard","has-post-thumbnail","category-military-defense","tag-arleigh-burke-class","tag-bath-iron-works","tag-gd-biw","tag-pentagon-news","tag-susan-collins"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@conflicts\/117430860280873961","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/conflicts\/wp-json\/wp\/v2\/posts\/34532","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/conflicts\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/conflicts\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/conflicts\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/conflicts\/wp-json\/wp\/v2\/comments?post=34532"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/conflicts\/wp-json\/wp\/v2\/posts\/34532\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/conflicts\/wp-json\/wp\/v2\/media\/34533"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/conflicts\/wp-json\/wp\/v2\/media?parent=34532"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/conflicts\/wp-json\/wp\/v2\/categories?post=34532"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/conflicts\/wp-json\/wp\/v2\/tags?post=34532"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}