{"id":139641,"date":"2026-07-06T07:13:09","date_gmt":"2026-07-06T07:13:09","guid":{"rendered":"https:\/\/www.europesays.com\/cz\/139641\/"},"modified":"2026-07-06T07:13:09","modified_gmt":"2026-07-06T07:13:09","slug":"nejvetsi-dalnicni-zakazka-na-opravu-ma-viteze-rekonstrukce-d11-bude-vyrazne-levnejsi-a-rychlejsi","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/cz\/139641\/","title":{"rendered":"Nejv\u011bt\u0161\u00ed d\u00e1lni\u010dn\u00ed zak\u00e1zka na opravu m\u00e1 v\u00edt\u011bze. Rekonstrukce D11 bude v\u00fdrazn\u011b levn\u011bj\u0161\u00ed a rychlej\u0161\u00ed"},"content":{"rendered":"<p>\n                                        Cena opravy klesla na 56 % odhadu, doba opravy na t\u0159etinu maxim\u00e1ln\u00edho \u010dasu.                                     <\/p>\n<p>Spole\u010dnost Skanska se stala v\u00edt\u011bzem sout\u011b\u017ee na nejv\u011bt\u0161\u00ed zak\u00e1zku na opravu d\u00e1lnice ve vlastnictv\u00ed \u0158editelstv\u00ed silnic a d\u00e1lnic. Za 757,3 milionu korun oprav \u00ed 13,334 km dlouh\u00fd \u00fasek mezi Pod\u011bbrady a Sadskou.<\/p>\n<p>O v\u00fdb\u011bru v\u00edt\u011bze informoval na s\u00edti X gener\u00e1ln\u00ed \u0159editel \u0158editelstv\u00ed silnic a d\u00e1lnic Radek M\u00e1tl. Do sout\u011b\u017ee s odhadovanou cenou 1,3 miliardy korun p\u0159i\u0161lo p\u011bt nab\u00eddek. Skanska vyhr\u00e1la d\u00edky nejlep\u0161\u00ed kombinaci nab\u00eddnut\u00e9 ceny a \u010dasu na opravu.<\/p>\n<p>Zat\u00edmco po\u017eadavek \u0158SD byl dokon\u010dit opravu maxim\u00e1ln\u011b do 220 dn\u016f, Skanska nab\u00eddla pouze 78 dn\u016f. V\u00fdrazn\u011b pod limitem byly i ostatn\u00ed nab\u00eddky. Nejlevn\u011bj\u0161\u00ed uchaze\u010d nab\u00eddl cenu 738 milion\u016f korun, ale pr\u00e1ce na 113 dn\u016f. Vypl\u00fdv\u00e1 to z \u00fadaj\u016f na profilu zadavatele.<\/p>\n<p>B\u011b\u017e\u00ed je\u0161t\u011b lh\u016fty na odvol\u00e1n\u00ed proti v\u00fdb\u011bru v\u00edt\u011bze, oprava m\u00e1 za\u010d\u00edt b\u011bhem srpna.<\/p>\n<p>Opravou projdou i v\u011btve k\u0159i\u017eovatek<\/p>\n<p>Pracovat se bude na j\u00edzdn\u00edm p\u00e1su ve sm\u011bru na Prahu mezi Pod\u011bbrady a Sadskou. Opraveny budou tak\u00e9 v\u011btve t\u0159\u00ed mimo\u00farov\u0148ov\u00fdch k\u0159i\u017eovatek a odpo\u010d\u00edvka Vrbov\u00e1 Lhota. Celkov\u00e1 d\u00e9lka opravovan\u00e9ho \u00faseku \u010din\u00ed 13 334 metr\u016f. V opravovan\u00e9m \u00faseku prob\u011bhne v\u00fdm\u011bna konstruk\u010dn\u00edch vrstev, ty by pak m\u011bly podle \u0158SD vydr\u017eet dal\u0161\u00edch 30 let.<\/p>\n<p>P\u016fvodn\u00ed cementobetonov\u00fd kryt v pr\u016fm\u011brn\u00e9 tlou\u0161\u0165ce 260 mm poch\u00e1z\u00ed z doby v\u00fdstavby d\u00e1lnice a jej\u00edho uveden\u00ed do provozu v roce 1990. Diagnostika uk\u00e1zala velk\u00e9 mno\u017estv\u00ed trhlin, \u00fasek je poznamen\u00e1n \u010dast\u00fdmi vyspr\u00e1vkami. Emulzn\u00ed mikrokoberec zabra\u0148uj\u00edc\u00ed dal\u0161\u00ed degradaci vozovky v tlou\u0161\u0165ce 10 \u2013 30 mm je podle \u0158SD na hranici sv\u00e9 \u017eivotnosti.<\/p>\n<p>Projekt po\u010d\u00edt\u00e1 s rekonstrukc\u00ed syst\u00e9mu telematiky a odvodn\u011bn\u00ed, nap\u0159\u00edklad obnovou meteo \u010didel nebo vybour\u00e1n\u00edm p\u016fvodn\u00edch \u017elab\u016f a nahrazen\u00edm nov\u00fdmi. Vym\u011bn\u011bna budou tak\u00e9 ocelov\u00e1 i betonov\u00e1 svodidla. Na odpo\u010d\u00edvce Vrbov\u00e1 Lhota sm\u011br Praha se budou rekonstruovat rovn\u011b\u017e ostr\u016fvky mezi odstavn\u00fdmi plochami, dla\u017eba, syst\u00e9m odvodn\u011bn\u00ed a mimo jin\u00e9 budou vym\u011bn\u011bny i p\u016fvodn\u00ed odpadkov\u00e9 ko\u0161e z betonu za nov\u00e9.<\/p>\n<p>Provoz na d\u00e1lnici omez\u00ed oprava jen \u010d\u00e1ste\u010dn\u011b. P\u0159edpokl\u00e1d\u00e1 se jeho veden\u00ed v re\u017eimu 2\/2 z\u00fa\u017een\u00e9 j\u00edzdn\u00ed pruhy, rychlost\u00ed sn\u00ed\u017eenou na maxim\u00e1ln\u011b 80 km\/h. S postupuj\u00edc\u00edmi etapami bude omezen provoz na mimo\u00farov\u0148ov\u00fdch k\u0159i\u017eovatk\u00e1ch a rekonstruovan\u00e9 odpo\u010d\u00edvce.<\/p>\n<p>                                                        Tagy<\/p>\n<p>                                                                                                                                                                                                                            <a href=\"https:\/\/zdopravy.cz\/tag\/d11\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                D11                                                            <\/a><br \/>\n                                                                                                                                                                                                                                <a href=\"https:\/\/zdopravy.cz\/tag\/opravy-dalnic\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                opravy d\u00e1lnic                                                            <\/a><br \/>\n                                                                                                                                                                                                                                <a href=\"https:\/\/zdopravy.cz\/tag\/reditelstvi-silnic-a-dalnic\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                \u0158editelstv\u00ed silnic a d\u00e1lnic                                                            <\/a><br \/>\n                                                                                                                                                                                                                                <a href=\"https:\/\/zdopravy.cz\/tag\/rsd\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                \u0158SD                                                            <\/a><br \/>\n                                                                                                                                                                                                                                                                                                                                            <a href=\"https:\/\/zdopravy.cz\/tag\/skanska\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                Skanska                                                            <\/a><\/p>\n<p>                                                <a href=\"https:\/\/zdopravy.cz\/nejvetsi-dalnicni-zakazka-na-opravu-ma-viteze-rekonstrukce-d11-bude-vyrazne-levnejsi-a-rychlejsi-287997\/?comments=1#comments\" class=\"ml-3 text-body mb-3 mt-4 d-inline-block\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p>                                                    2 koment\u00e1\u0159e                                                <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"Cena opravy klesla na 56 % odhadu, doba opravy na t\u0159etinu maxim\u00e1ln\u00edho \u010dasu. Spole\u010dnost Skanska se stala v\u00edt\u011bzem&hellip;\n","protected":false},"author":2,"featured_media":139642,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[7],"tags":[43,42,41,40,5786,36990,2607,2608,119,2842],"class_list":["post-139641","post","type-post","status-publish","format-standard","has-post-thumbnail","category-cesko","tag-ceska-republika","tag-cesko","tag-czech-republic","tag-czechia","tag-d11","tag-opravy-dalnic","tag-reditelstvi-silnic-a-dalnic","tag-rsd","tag-seznam","tag-skanska"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@cz\/116871797500079558","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/139641","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/comments?post=139641"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/139641\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media\/139642"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media?parent=139641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/categories?post=139641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/tags?post=139641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}