{"id":184950,"date":"2026-08-19T15:02:19","date_gmt":"2026-08-19T15:02:19","guid":{"rendered":"https:\/\/www.europesays.com\/cz\/184950\/"},"modified":"2026-08-19T15:02:19","modified_gmt":"2026-08-19T15:02:19","slug":"vypadky-signalu-na-koridoru-by-mely-zmizet-do-roku-2028-sz-chce-pet-novych-vysilacu","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/cz\/184950\/","title":{"rendered":"V\u00fdpadky sign\u00e1lu na koridoru by m\u011bly zmizet do roku 2028. S\u017d chce p\u011bt nov\u00fdch vys\u00edla\u010d\u016f"},"content":{"rendered":"<p>\n                                        Projekt a stavba nov\u00fdch za\u0159\u00edzen\u00ed na mobiln\u00ed 5G sign\u00e1l vzniknou v re\u017eii S\u017d.                                    <\/p>\n<p>Spr\u00e1va \u017eeleznic (S\u017d) hled\u00e1 projektanta a zhotovitele vylep\u0161en\u00ed s\u00edt\u011b 5G na nejfrekventovan\u011bj\u0161\u00edm koridorov\u00e9m \u00faseku mezi Prahou a \u010ceskou T\u0159ebovou. Na p\u011bti m\u00edstech vyrostou nov\u00e9 vys\u00edla\u010de, o samotn\u00e9 \u0161\u00ed\u0159en\u00ed sign\u00e1lu se postaraj\u00ed mobiln\u00ed oper\u00e1to\u0159i. Nejvy\u0161\u0161\u00ed p\u0159\u00edpustn\u00e1 nab\u00eddkov\u00e1 cena je 168,7 milionu korun. Hotovo by m\u011blo b\u00fdt na za\u010d\u00e1tku roku 2028.<\/p>\n<p>V\u00edt\u011bz tendru podle S\u017d nejprve vytvo\u0159\u00ed projekt, pot\u00e9 provede samotn\u00e9 stavebn\u00ed pr\u00e1ce. Jejich dokon\u010den\u00ed m\u00e1 p\u0159in\u00e9st lep\u0161\u00ed pokryt\u00ed hlavn\u00edho koridoru sign\u00e1lem 5G, kter\u00e9 \u010del\u00ed kv\u016fli sou\u010dasn\u00fdm v\u00fdpadk\u016fm \u010dast\u00e9 kritice cestuj\u00edc\u00edch.<\/p>\n<p>\u201ePokud chceme, aby byla \u017eeleznice skute\u010dnou alternativou k cestov\u00e1n\u00ed autem, mus\u00ed nab\u00eddnout i slu\u017eby, kter\u00e9 dnes cestuj\u00edc\u00ed pova\u017euj\u00ed za samoz\u0159ejmost. Mezi n\u011b pat\u0159\u00ed stabiln\u00ed a rychl\u00e9 datov\u00e9 p\u0159ipojen\u00ed, a\u0165 u\u017e lid\u00e9 ve vlaku pracuj\u00ed, telefonuj\u00ed nebo vyu\u017e\u00edvaj\u00ed dal\u0161\u00ed slu\u017eby na palub\u011b vlaku. Kvalitn\u00ed datov\u00e9 pokryt\u00ed je ale d\u016fle\u017eit\u00e9 tak\u00e9 pro dal\u0161\u00ed digitalizaci \u017eeleznice a bezpe\u010dn\u00fd provoz, v\u010detn\u011b rozvoje syst\u00e9m\u016f souvisej\u00edc\u00edch s ETCS,\u201c \u0159\u00edk\u00e1 ministr dopravy Ivan Bedn\u00e1rik.<\/p>\n<p>\u201eNa\u0161\u00edm c\u00edlem je, aby cestuj\u00edc\u00ed mohli b\u00fdt online po celou dobu j\u00edzdy. Zlep\u0161en\u00ed sign\u00e1lu ve vlac\u00edch p\u0159inese nep\u0159eru\u0161ovan\u00e9 hovory, kvalitn\u011bj\u0161\u00ed datov\u00e9 p\u0159ipojen\u00ed a celkov\u011b vy\u0161\u0161\u00ed komfort cestov\u00e1n\u00ed. Kl\u00ed\u010dov\u00e1 je p\u0159itom sou\u010dinnost s mobiln\u00edmi oper\u00e1tory, se kter\u00fdmi na tomto projektu spolupracujeme,\u201c dopl\u0148uje gener\u00e1ln\u00ed \u0159editel Spr\u00e1vy \u017eeleznic Tom\u00e1\u0161 T\u00f3th.<\/p>\n<p>V\u0161echny nov\u00e9 sto\u017e\u00e1ry bude mo\u017en\u00e9 vyu\u017e\u00edt i pro \u0161\u00ed\u0159en\u00ed sou\u010dasn\u00e9ho r\u00e1diov\u00e9ho sign\u00e1lu GSM-R, kter\u00fd se pou\u017e\u00edv\u00e1 pro komunikaci mezi tra\u0165ovou a palubn\u00ed \u010d\u00e1st\u00ed vlakov\u00e9ho zabezpe\u010dova\u010de ETCS. Stejn\u011b tak poslou\u017e\u00ed syst\u00e9mu FRMCS, kter\u00fd GSM-R v budoucnu nahrad\u00ed.<\/p>\n<p><a href=\"https:\/\/zdopravy.cz\/zeleznicni-tunely-pod-vitkovem-konecne-ziskaly-pokryti-5g-zapad-nam-muze-zavidet-uvedl-zhotovitel-286630\/\" rel=\"nofollow noopener\" target=\"_blank\">\u017delezni\u010dn\u00ed tunely pod V\u00edtkovem kone\u010dn\u011b z\u00edskaly pokryt\u00ed 5G. Z\u00e1pad n\u00e1m m\u016f\u017ee z\u00e1vid\u011bt, uvedl zhotovitel<\/a><\/p>\n<p>V \u010dervnu Spr\u00e1va \u017eeleznic s oper\u00e1tory dokon\u010dila pokryt\u00ed mobiln\u00ed s\u00edt\u00ed ve dvou \u017eelezni\u010dn\u00edch tunelech na koridoru. Nov\u011b se tak cestuj\u00edc\u00ed dovolaj\u00ed a vyu\u017eij\u00ed mobiln\u00ed data ve V\u00edtkovsk\u00fdch tunelech v Praze a v Kras\u00edkovsk\u00e9m tunelu mezi \u010ceskou T\u0159ebovou a Olomouc\u00ed.<\/p>\n<p>                                                        Tagy<\/p>\n<p>                                                                                                                                                                                                                            <a href=\"https:\/\/zdopravy.cz\/tag\/5g\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                5G                                                            <\/a><br \/>\n                                                                                                                                                                                                                                <a href=\"https:\/\/zdopravy.cz\/tag\/mobilni-signal-na-zeleznici\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                mobiln\u00ed sign\u00e1l na \u017eeleznici                                                            <\/a><\/p>\n<p>                                                <a href=\"https:\/\/zdopravy.cz\/vypadky-signalu-na-koridoru-by-mely-zmizet-do-roku-2028-sz-chce-pet-novych-vysilacu-294529\/?comments=1#comments\" class=\"ml-3 text-body mb-3 mt-4 d-inline-block\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p>                                                    27 koment\u00e1\u0159\u016f                                                <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"Projekt a stavba nov\u00fdch za\u0159\u00edzen\u00ed na mobiln\u00ed 5G sign\u00e1l vzniknou v re\u017eii S\u017d. Spr\u00e1va \u017eeleznic (S\u017d) hled\u00e1 projektanta&hellip;\n","protected":false},"author":2,"featured_media":184951,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[7],"tags":[9440,43,42,41,40,19057,119],"class_list":["post-184950","post","type-post","status-publish","format-standard","has-post-thumbnail","category-cesko","tag-5g","tag-ceska-republika","tag-cesko","tag-czech-republic","tag-czechia","tag-mobilni-signal-na-zeleznici","tag-seznam"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@cz\/117122783304635084","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/184950","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/comments?post=184950"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/184950\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media\/184951"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media?parent=184950"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/categories?post=184950"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/tags?post=184950"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}