{"id":258843,"date":"2026-10-26T10:30:12","date_gmt":"2026-10-26T10:30:12","guid":{"rendered":"https:\/\/www.europesays.com\/cz\/258843\/"},"modified":"2026-10-26T10:30:12","modified_gmt":"2026-10-26T10:30:12","slug":"zachrana-na-posledni-chvili-urad-prodlouzil-povoleni-pro-dalsi-cast-d35-stavba-zacne-letos","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/cz\/258843\/","title":{"rendered":"Z\u00e1chrana na posledn\u00ed chv\u00edli. \u00da\u0159ad prodlou\u017eil povolen\u00ed pro dal\u0161\u00ed \u010d\u00e1st D35, stavba za\u010dne letos"},"content":{"rendered":"<p>\n                                        \u0158SD u\u017e m\u00e1 na d\u00e1lni\u010dn\u00ed obchvat \u00dalibic smlouvu, stavba za\u010dne je\u0161t\u011b letos.                                     <\/p>\n<p>\u0158editelstv\u00ed silnic a d\u00e1lnic (\u0158SD) za\u017eehnalo riziko, \u017ee jednomu z dal\u0161\u00edch \u00fasek\u016f d\u00e1lnice D35 vypr\u0161\u00ed stavebn\u00ed povolen\u00ed je\u0161t\u011b p\u0159ed t\u00edm, ne\u017e se kopne poprv\u00e9 do zem\u011b.<\/p>\n<p>Dopravn\u00ed a energetick\u00fd stavebn\u00ed \u00fa\u0159ad (DES\u00da) prodlou\u017eil minul\u00fd t\u00fdden stavebn\u00ed povolen\u00ed pro stavbu D35 v podob\u011b obchvatu \u00dalibic. Vypl\u00fdv\u00e1 to z <a href=\"https:\/\/zdopravy.cz\/wp-content\/uploads\/2026\/10\/26-033805.pdf\" target=\"_blank\" rel=\"noopener nofollow\">dokumentu na \u00fa\u0159edn\u00ed desce<\/a>. Bez prodlou\u017een\u00ed by povolen\u00ed p\u0159estalo platit u\u017e letos v prvn\u00ed polovin\u011b \u0159\u00edjna.<\/p>\n<p>\u201eZ d\u016fvodu \u010dasov\u00e9, administrativn\u00ed a technick\u00e9 n\u00e1ro\u010dnosti p\u0159\u00edpravy rozs\u00e1hl\u00e9 ve\u0159ejn\u011b prosp\u011b\u0161n\u00e9 stavby strategick\u00e9 dopravn\u00ed infrastruktury d\u00e1lnice \u201aD35 \u00dalibice, obchvat\u2018 nebylo mo\u017eno doposud stavbu zah\u00e1jit,\u201c uvedlo \u0158SD v \u017e\u00e1dosti.<\/p>\n<p>Podle textu rozhodnut\u00ed m\u00e1 nyn\u00ed \u0158SD dal\u0161\u00ed dva roky na zah\u00e1jen\u00ed stavby, tak velkorys\u00fd \u010das u\u017e ale nebude pot\u0159ebovat. <a href=\"https:\/\/smlouvy.gov.cz\/smlouva\/39977661\" target=\"_blank\" rel=\"noopener nofollow\">Smlouva s v\u00edt\u011bzem je podepsan\u00e1<\/a>, stavba m\u00e1 za\u010d\u00edt je\u0161t\u011b letos.<\/p>\n<p>Zak\u00e1zku za 1,066 miliardy korun z\u00edskalo sdru\u017een\u00ed polsk\u00e9 firmy Budimex a \u010desk\u00e9 spole\u010dnosti Firesta-Fi\u0161er. Budimex aktu\u00e1ln\u011b stav\u00ed \u00fasek D35 D\u017eb\u00e1nov \u2013 Litomy\u0161l, je tak\u00e9 ve sdru\u017een\u00ed, kter\u00e9 bylo vyhl\u00e1\u0161eno v\u00edt\u011bzem na dostavbu D35 z Opatovce a\u017e do Mohelnice metodou PPP.<\/p>\n<p>Podle zpr\u00e1vy na profilu zadavatele p\u0159i\u0161ly do sout\u011b\u017ee na obchvat \u00dalibic celkem \u010dty\u0159i nab\u00eddky, v\u0161echny v\u00fdrazn\u011b pod odhadovanou cenou 1,416 miliardy korun. Druh\u00e1 nejni\u017e\u0161\u00ed nab\u00eddka je za 1,151 miliardy korun od Strabagu SIS, nejvy\u0161\u0161\u00ed za 1,232 miliardy korun od sdru\u017een\u00ed Hochtief, Chl\u00e1dek a Tint\u011bra Pardubice a Silnice Group. Nejni\u017e\u0161\u00ed cena je na 75 % p\u0159edpokl\u00e1dan\u00e9 hodnoty.<\/p>\n<p>Stavba nav\u00e1\u017ee ve sm\u011bru od Hradce Kr\u00e1lov\u00e9 na \u00fasek \u00dalibice \u2013 Ho\u0159ice, kter\u00fd se ji\u017e stav\u00ed. Z druh\u00e9ho konce se zapoj\u00ed do silnice I\/16 a sou\u010dasn\u011b bude v budoucnu navazovat na novou silnici I\/35 sm\u011brem na Turnov. Kdy se tento \u00fasek za\u010dne stav\u011bt, nen\u00ed jasn\u00e9. B\u00fdval\u00fd ministr \u017eivotn\u00edho prost\u0159ed\u00ed Petr Hlad\u00edk (KDU-\u010cSL) t\u011bsn\u011b p\u0159ed koncem ve sv\u00e9 funkci zru\u0161il souhlasn\u00e9 stanovisko se stavbou a bude se muset d\u011blat nov\u00e1 dokumentace EIA.<\/p>\n<p>Sou\u010d\u00e1st\u00ed zak\u00e1zky bude jak vybudov\u00e1n\u00ed 1,641 kilometru d\u00e1lnice D35 okolo \u00dalibic, tak sou\u010dasn\u011b 2,150 km dlouh\u00e1 p\u0159elo\u017eka silnice I\/16. Jednou z hlavn\u00edch \u010d\u00e1st\u00ed stavby bude nov\u00e1 mimo\u00farov\u0148ov\u00e1 k\u0159i\u017eovatka M\u00daK \u00dalibice, kter\u00e1 \u0159e\u0161\u00ed k\u0159\u00ed\u017een\u00ed silnice I\/16 s d\u00e1lnic\u00ed. <a href=\"https:\/\/letaky.rsd.cz\/media\/stavba\/51\/leaflet\/infoletak_d35-ulibice-obchvat.pdf\" target=\"_blank\" rel=\"noopener nofollow\">Detailn\u011b stavbu popisuje informa\u010dn\u00ed let\u00e1k<\/a>.<\/p>\n<p>Na p\u0159elo\u017ece vznikne je\u0161t\u011b spir\u00e1lov\u00e1 turbookru\u017en\u00ed k\u0159i\u017eovatka (vejcovit\u00e1) umo\u017e\u0148uj\u00edc\u00ed napojen\u00ed budouc\u00ed silnice II\/635 (a sil. III. t\u0159\u00eddy) na novou \u010d\u00e1st silnice I\/16. Jej\u00ed um\u00edst\u011bn\u00ed na novou \u010dty\u0159pruhovou komunikaci dlouhodob\u011b bud\u00ed u \u010d\u00e1sti ve\u0159ejnosti kritiku, zda takov\u00e9 \u0159e\u0161en\u00ed pat\u0159\u00ed na kapacitn\u00ed silnici.<\/p>\n<p>                                                        Tagy<\/p>\n<p>                                                                                                                                                                                                                            <a href=\"https:\/\/zdopravy.cz\/tag\/budimex\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                Budimex                                                            <\/a><br \/>\n                                                                                                                                                                                                                                <a href=\"https:\/\/zdopravy.cz\/tag\/d35\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                D35                                                            <\/a><br \/>\n                                                                                                                                                                                                                                <a href=\"https:\/\/zdopravy.cz\/tag\/d35-ulibice-obchvat\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                D35 \u00dalibice obchvat                                                            <\/a><br \/>\n                                                                                                                                                                                                                                <a href=\"https:\/\/zdopravy.cz\/tag\/dopravni-a-energeticky-stavebni-urad-desu\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                Dopravn\u00ed a energetick\u00fd stavebn\u00ed \u00fa\u0159ad (DES\u00da)                                                            <\/a><br \/>\n                                                                                                                                                                                                                                <a href=\"https:\/\/zdopravy.cz\/tag\/firesta-fiser\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                Firesta-Fi\u0161er                                                            <\/a><br \/>\n                                                                                                                                                                                                                                <a href=\"https:\/\/zdopravy.cz\/tag\/reditelstvi-silnic-a-dalnic\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                \u0158editelstv\u00ed silnic a d\u00e1lnic                                                            <\/a><br \/>\n                                                                                                                                                                                                                                <a href=\"https:\/\/zdopravy.cz\/tag\/rsd\/\" type=\"button\" class=\"btn btn-secondary mb-1 btn-sm\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                                                                \u0158SD                                                            <\/a><\/p>\n<p>                                                <a href=\"https:\/\/zdopravy.cz\/zachrana-na-posledni-chvili-urad-prodlouzil-povoleni-pro-dalsi-cast-d35-stavba-zacne-letos-304635\/?comments=1#comments\" class=\"ml-3 text-body mb-3 mt-4 d-inline-block\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p>                                                    3 koment\u00e1\u0159e                                                <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"\u0158SD u\u017e m\u00e1 na d\u00e1lni\u010dn\u00ed obchvat \u00dalibic smlouvu, stavba za\u010dne je\u0161t\u011b letos. \u0158editelstv\u00ed silnic a d\u00e1lnic (\u0158SD) za\u017eehnalo&hellip;\n","protected":false},"author":2,"featured_media":258844,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[7],"tags":[8431,43,42,41,40,8234,33874,8056,5657,2607,2608,119],"class_list":["post-258843","post","type-post","status-publish","format-standard","has-post-thumbnail","category-cesko","tag-budimex","tag-ceska-republika","tag-cesko","tag-czech-republic","tag-czechia","tag-d35","tag-d35-ulibice-obchvat","tag-dopravni-a-energeticky-stavebni-urad-desu","tag-firesta-fiser","tag-reditelstvi-silnic-a-dalnic","tag-rsd","tag-seznam"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@cz\/117506751470020613","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/258843","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/comments?post=258843"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/258843\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media\/258844"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media?parent=258843"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/categories?post=258843"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/tags?post=258843"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}