{"id":262306,"date":"2026-10-29T13:58:12","date_gmt":"2026-10-29T13:58:12","guid":{"rendered":"https:\/\/www.europesays.com\/cz\/262306\/"},"modified":"2026-10-29T13:58:12","modified_gmt":"2026-10-29T13:58:12","slug":"dostavba-dukovan-se-komplikuje-kvuli-sporu-korejskych-firem","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/cz\/262306\/","title":{"rendered":"Dostavba Dukovan se komplikuje kv\u016fli sporu korejsk\u00fdch firem"},"content":{"rendered":"<p class=\"c_bB\">KHNP podle <a data-dot=\"atm-link\" target=\"_blank\" rel=\"noopener nofollow\" href=\"https:\/\/www.businesskorea.co.kr\/news\/articleView.html?idxno=280011\" class=\"c_N\">BusinessKorea<\/a> ozn\u00e1mila, \u017ee ani pracovn\u00ed jedn\u00e1n\u00ed, zvl\u00e1\u0161tn\u00ed koordina\u010dn\u00ed v\u00fdbor a\u00a0n\u00e1sledn\u00e9 rozhovory veden\u00ed firem nevedly k\u00a0dohod\u011b.<\/p>\n<p class=\"c_bB\">Spor se t\u00fdkal hlavn\u011b zp\u016fsobu v\u00fdpo\u010dtu stavebn\u00edch n\u00e1klad\u016f a\u00a0toho, kdo ponese riziko jejich p\u0159\u00edpadn\u00e9ho r\u016fstu. Situaci komplikuje skute\u010dnost, \u017ee hlavn\u00ed smlouva s\u00a0\u010deskou stranou u\u017e byla uzav\u0159ena. Elektr\u00e1rna Dukovany II podepsala kontrakt s\u00a0KHNP v\u00a0\u010dervnu 2025.\u00a0Jeho hodnota je vy\u010d\u00edslena na 407\u00a0miliard korun bez DPH.<\/p>\n<p class=\"c_bB\">Daewoo E&amp;C a\u00a0Doosan Enerbility podle listu odm\u00edtly tvrzen\u00ed, \u017ee jedn\u00e1n\u00ed jednodu\u0161e zkrachovala, a\u00a0uvedly, \u017ee cht\u011bly pokra\u010dovat nejm\u00e9n\u011b do konce roku.<\/p>\n<p><a data-dot=\"atm-link\" target=\"_self\" href=\"https:\/\/www.novinky.cz\/clanek\/ekonomika-dohodnuta-cena-za-dukovany-je-realisticka-rika-reditel-vystavby-z-korejske-khnp-40601645\" class=\"c_N\" rel=\"nofollow noopener\"><img fetchpriority=\"high\" height=\"2304\" width=\"4096\" src=\"https:\/\/www.europesays.com\/cz\/wp-content\/uploads\/2026\/10\/suh-khnp.jpeg\" loading=\"eager\" decoding=\"sync\" class=\"c_t c_r\"\/><\/a><\/p>\n<p class=\"c_bB\">J\u00e1drem sporu m\u00e1 b\u00fdt podle konsorcia ot\u00e1zka, kdo zaplat\u00ed zv\u00fd\u0161en\u00e9 stavebn\u00ed n\u00e1klady, pokud se b\u011bhem projektu zm\u011bn\u00ed technick\u00fd n\u00e1vrh. Firmy nam\u00edtaj\u00ed, \u017ee jako stavebn\u00ed dodavatel\u00e9 nemohou n\u00e9st bez \u00fapravy ceny ve\u0161ker\u00e9 dodate\u010dn\u00e9 n\u00e1klady vyvolan\u00e9 zm\u011bnami projektu, do jeho\u017e n\u00e1vrhu samy pln\u011b nezasahuj\u00ed.<\/p>\n<p class=\"c_bB\">KHNP m\u011blo naopak dosp\u011bt k\u00a0z\u00e1v\u011bru, \u017ee dal\u0161\u00ed jedn\u00e1n\u00ed u\u017e nem\u00e1 smysl. Chce proto ukon\u010dit dosavadn\u00ed dohodu o\u00a0spolupr\u00e1ci a\u00a0vypsat sout\u011b\u017e na nov\u00e9ho stavebn\u00edho partnera. Ten by m\u011bl b\u00fdt vybr\u00e1n do \u010dervence 2027.\u00a0P\u0159\u00edpravn\u00e9 pr\u00e1ce na staveni\u0161ti maj\u00ed podle sou\u010dasn\u00e9ho pl\u00e1nu za\u010d\u00edt v\u00a0lednu 2028\u00a0a\u00a0hlavn\u00ed stavebn\u00ed pr\u00e1ce v\u00a0listopadu 2029.\u00a0Prvn\u00ed reaktor m\u00e1 b\u00fdt uveden do zku\u0161ebn\u00edho provozu v\u00a0roce 2036.\u00a0Do v\u00fdb\u011bru n\u00e1hrady chce KHNP n\u011bkter\u00e9 nezbytn\u00e9 \u010dinnosti zaji\u0161\u0165ovat sama.<\/p>\n<p>Doosan z\u00a0projektu nezmiz\u00ed<\/p>\n<p class=\"c_bB\">Krach jedn\u00e1n\u00ed p\u0159itom neznamen\u00e1 \u00fapln\u00fd odchod Doosan Enerbility z\u00a0Dukovan. Firma m\u00e1 zvl\u00e1\u0161tn\u00ed smlouvy na dod\u00e1vky reaktorov\u00fdch za\u0159\u00edzen\u00ed a\u00a0turb\u00ednov\u00fdch syst\u00e9m\u016f, kter\u00e9 nejsou sou\u010d\u00e1st\u00ed ukon\u010den\u00e9ho vyjedn\u00e1v\u00e1n\u00ed o\u00a0stavebn\u00edm kontraktu.<\/p>\n<p class=\"c_bB\">Turb\u00ednu a\u00a0vybaven\u00ed strojovny v\u00a0hodnot\u011b n\u011bkolika miliard korun m\u00e1 dodat dce\u0159in\u00e1 firma, plze\u0148sk\u00e1 Doosan \u0160koda Power.<\/p>\n<p class=\"c_bB\">\u0158editel v\u00fdstavby z\u00a0jihokorejsk\u00e9 spole\u010dnosti KHNP So \u010cun-kjo Novink\u00e1m ned\u00e1vno potvrdil, \u017ee v\u00a0sou\u010dasnosti m\u00e1 korejsk\u00e1 firma s\u00a0\u010desk\u00fdmi spole\u010dnostmi uzav\u0159eno celkem \u0161estn\u00e1ct smluv, v\u010detn\u011b t\u00e9 s\u00a0Doosan \u0160koda Power na dod\u00e1vku parn\u00ed turb\u00edny.<\/p>\n<p class=\"c_bB\">Samostatn\u011b pokra\u010duj\u00ed i\u00a0dal\u0161\u00ed \u010d\u00e1sti korejsk\u00e9ho dodavatelsk\u00e9ho \u0159et\u011bzce. KEPCO Engineering &amp; Construction m\u00e1 kontrakt na integrovan\u00e9 projektov\u00e1n\u00ed a\u00a0p\u0159ipravuj\u00ed se dohody na dod\u00e1vky jadern\u00e9ho paliva a\u00a0slu\u017eby spojen\u00e9 se spou\u0161t\u011bn\u00edm a\u00a0\u00fadr\u017ebou elektr\u00e1rny.<\/p>\n<p class=\"c_bB\">\u010cesk\u00fd projekt po\u010d\u00edt\u00e1 se dv\u011bma korejsk\u00fdmi bloky APR1000.\u00a0Smlouva z\u00e1rove\u0148 obsahuje opci na dal\u0161\u00ed dva bloky v\u00a0Temel\u00edn\u011b.<\/p>\n<p class=\"c_bB\">Nahrazen\u00ed zku\u0161en\u00e9ho stavebn\u00edho konsorcia ale m\u016f\u017ee podle BusinessKorea zv\u00fd\u0161it riziko r\u016fstu n\u00e1klad\u016f nebo zpo\u017ed\u011bn\u00ed. Daewoo E&amp;C i\u00a0Doosan pat\u0159\u00ed mezi zaveden\u00e9 firmy v\u00a0jadern\u00e9m stavebnictv\u00ed a\u00a0okruh spole\u010dnost\u00ed schopn\u00fdch podobn\u011b velkou zak\u00e1zku p\u0159evz\u00edt je omezen\u00fd.<\/p>\n<p>Akcie obou firem prudce spadly<\/p>\n<p class=\"c_bB\">Investo\u0159i na spor reagovali v\u00fdrazn\u00fdm v\u00fdprodejem. Akcie Daewoo E&amp;C ve \u010dtvrtek dopoledne klesaly o\u00a0v\u00edce ne\u017e 21\u00a0procent na 11\u00a0250\u00a0won\u016f (zhruba 185\u00a0K\u010d), Doosan Enerbility ztr\u00e1cela p\u0159es 11\u00a0procent na 54\u00a0500\u00a0won\u016f (asi 897\u00a0K\u010d).<\/p>\n<p class=\"c_bB\">Jihokorejsk\u00fd ministr obchodu, pr\u016fmyslu a\u00a0energetiky Kim \u010cong-kwan n\u00e1sledn\u011b rozhodnut\u00ed KHNP ve\u0159ejn\u011b podpo\u0159il. Podle BusinessKorea uvedl, \u017ee vl\u00e1da chce rychle naj\u00edt n\u00e1hradn\u00edho partnera a\u00a0zabr\u00e1nit tomu, aby spor naru\u0161il term\u00edny sl\u00edben\u00e9 \u010desk\u00e9 stran\u011b.<\/p>\n<p><a data-dot=\"atm-link\" target=\"_self\" href=\"https:\/\/www.novinky.cz\/clanek\/domaci-zpravy-kraj-vysocina-nove-dukovany-uz-se-rysuji-sestipatrovou-budovu-vyuziji-i-korejci-40604895\" class=\"c_N\" rel=\"nofollow noopener\"><img height=\"1080\" width=\"1920\" src=\"https:\/\/www.europesays.com\/cz\/wp-content\/uploads\/2026\/10\/1793282292_498_dukovany-jaderna-elektrarna.jpeg\" loading=\"eager\" decoding=\"sync\" class=\"c_t c_r\"\/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"KHNP podle BusinessKorea ozn\u00e1mila, \u017ee ani pracovn\u00ed jedn\u00e1n\u00ed, zvl\u00e1\u0161tn\u00ed koordina\u010dn\u00ed v\u00fdbor a\u00a0n\u00e1sledn\u00e9 rozhovory veden\u00ed firem nevedly k\u00a0dohod\u011b. Spor&hellip;\n","protected":false},"author":2,"featured_media":262307,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[12],"tags":[67,68,28481,1008,1009,5091],"class_list":["post-262306","post","type-post","status-publish","format-standard","has-post-thumbnail","category-byznys","tag-business","tag-byznys","tag-dostavba","tag-dukovany","tag-jadro","tag-problemy"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@cz\/117524556192682759","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/262306","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/comments?post=262306"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/262306\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media\/262307"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media?parent=262306"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/categories?post=262306"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/tags?post=262306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}