{"id":264642,"date":"2026-10-31T17:37:22","date_gmt":"2026-10-31T17:37:22","guid":{"rendered":"https:\/\/www.europesays.com\/cz\/264642\/"},"modified":"2026-10-31T17:37:22","modified_gmt":"2026-10-31T17:37:22","slug":"zasadni-zprava-ale-cenu-i-terminy-mame-pojistene-sankcemi-mirni-benes-krach-korejskych-jednani-o-dukovanech","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/cz\/264642\/","title":{"rendered":"Z\u00e1sadn\u00ed zpr\u00e1va, ale cenu i term\u00edny m\u00e1me poji\u0161t\u011bn\u00e9 sankcemi, m\u00edrn\u00ed Bene\u0161 krach korejsk\u00fdch jedn\u00e1n\u00ed o Dukovanech"},"content":{"rendered":"<p><a href=\"https:\/\/www.e15.cz\/byznys\/prumysl-a-energetika\/korejci-se-rozhadali-o-dukovany-miliardovy-spor-ohrozuje-start-obri-jaderne-stavby-1436945\" rel=\"nofollow noopener\" target=\"_blank\">Kontrakt s korejskou firmou KHNP<\/a> m\u00e1 pevnou cenu a harmonogram, za nedodr\u017een\u00ed hroz\u00ed sankce. Novin\u00e1\u0159\u016fm to dnes \u0159ekl gener\u00e1ln\u00ed \u0159editel \u010cEZ Daniel Bene\u0161. Reagoval tak na \u010dtvrte\u010dn\u00ed informaci, \u017ee KHNP ukon\u010dila bez dohody jedn\u00e1n\u00ed o smlouv\u011b na stavebn\u00ed pr\u00e1ce na projektu nov\u00fdch jadern\u00fdch blok\u016f v Dukovanech s konsorciem korejsk\u00fdch firem Daewoo Engineering &amp; Construction a Doosan Enerbility. D\u016fvodem jsou podle KHNP rozd\u00edln\u00e9 postoje k z\u00e1sadn\u00edm podm\u00ednk\u00e1m, nyn\u00ed firma zv\u00e1\u017e\u00ed dal\u0161\u00ed kroky.<\/p>\n<p>\u201eRozhodn\u011b se to nem\u016f\u017ee zleh\u010dovat. Je to z\u00e1sadn\u00ed zpr\u00e1va. Pokud je to tedy konec, mo\u017en\u00e1 to je jen cenov\u00e9 vyjedn\u00e1v\u00e1n\u00ed p\u0159es m\u00e9dia v Koreji, to neum\u00edm je\u0161t\u011b \u0159\u00edct,\u201c uvedl Bene\u0161. Dodal, \u017ee zpr\u00e1va je zat\u00edm \u010derstv\u00e1 a podle jeho informac\u00ed harmonogram prac\u00ed nen\u00ed ohro\u017een\u00fd. \u201ePro \u010deskou stranu je to tak, \u017ee si mus\u00edme hl\u00eddat, \u017ee bude napln\u011bn kontrakt, kter\u00fd m\u00e1 pevnou cenu, pevn\u00fd harmonogram a m\u00e1 sankce za nedodr\u017een\u00ed,\u201c \u0159ekl Bene\u0161.<\/p>\n<p>Stavba nov\u00fdch jadern\u00fdch blok\u016f v Dukovanech by m\u011bla b\u00fdt nejv\u011bt\u0161\u00ed \u010deskou zak\u00e1zkou. N\u00e1klady p\u0159i v\u00fdstavb\u011b dvou reaktor\u016f v Dukovanech p\u0159i cen\u00e1ch z lo\u0148sk\u00e9ho roku \u010din\u00ed 407 miliard korun. Stavba prvn\u00edho bloku podle dosud zve\u0159ejn\u011bn\u00fdch pl\u00e1n\u016f m\u011bla za\u010d\u00edt v roce 2029, hotov\u00fd by m\u011bl b\u00fdt v roce 2036.<\/p>\n<p>Od uzav\u0159en\u00ed smlouvy o v\u00fdstavb\u011b dukovansk\u00fdch blok\u016f v minul\u00e9m roce KHNP zat\u00edm podepsala nap\u0159\u00edklad smlouvu na projektov\u00e9 a in\u017een\u00fdrsk\u00e9 pr\u00e1ce se spole\u010dnost\u00ed Kepco Engineering &amp; Construction, d\u00e1le smlouvu na dod\u00e1vku jadern\u00e9ho parn\u00edho syst\u00e9mu s Doosan Enerbility a smlouvu na dod\u00e1vku turbogener\u00e1toru se stejnou spole\u010dnost\u00ed.<\/p>\n<p>Krom\u011b toho podle KHNP pokra\u010duj\u00ed jedn\u00e1n\u00ed o smlouv\u011b na dod\u00e1vky jadern\u00e9ho paliva s Kepco Nuclear Fuel a o smlouv\u011b na uveden\u00ed elektr\u00e1rny do provozu a jej\u00ed \u00fadr\u017ebu s Kepco KPS. Uzav\u0159en\u00ed obou smluv se p\u0159edpokl\u00e1d\u00e1 v p\u0159\u00ed\u0161t\u00edm roce.<\/p>\n","protected":false},"excerpt":{"rendered":"Kontrakt s korejskou firmou KHNP m\u00e1 pevnou cenu a harmonogram, za nedodr\u017een\u00ed hroz\u00ed sankce. Novin\u00e1\u0159\u016fm to dnes \u0159ekl&hellip;\n","protected":false},"author":2,"featured_media":264643,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[12],"tags":[67,68,702,8738,10204,21218,33553,476,2059],"class_list":["post-264642","post","type-post","status-publish","format-standard","has-post-thumbnail","category-byznys","tag-business","tag-byznys","tag-cez","tag-daewoo","tag-daniel-benes","tag-jaderna-elektrarna-dukovany","tag-khnp","tag-projekt","tag-sankce"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@cz\/117536741505144054","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/264642","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/comments?post=264642"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/264642\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media\/264643"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media?parent=264642"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/categories?post=264642"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/tags?post=264642"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}