{"id":293251,"date":"2026-11-27T13:16:24","date_gmt":"2026-11-27T13:16:24","guid":{"rendered":"https:\/\/www.europesays.com\/cz\/293251\/"},"modified":"2026-11-27T13:16:24","modified_gmt":"2026-11-27T13:16:24","slug":"letiste-praha-ma-novy-kolektor-a-trafostanici-za-113-miliardy-korun","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/cz\/293251\/","title":{"rendered":"Leti\u0161t\u011b Praha m\u00e1 nov\u00fd kolektor a trafostanici za 1,13 miliardy korun"},"content":{"rendered":"<p>&#13;<br \/>\n  Komer\u010dn\u00ed prezentace Aktual.: 27.11.2026 13:32&#13;<br \/>\n  Vyd\u00e1no: 27.11.2026, 13:32&#13;\n<\/p>\n<p class=\"big\" itemprop=\"description\">    Praha &#8211; Leti\u0161t\u011b V\u00e1clava Havla m\u00e1 nov\u00fd 648 metr\u016f dlouh\u00fd kolektor a trafostanici, kter\u00e9 poslou\u017e\u00ed p\u0159i pl\u00e1novan\u00e9m rozvoji leti\u0161t\u011b a budouc\u00edm napojen\u00ed mezi ji\u017en\u00ed a severn\u00ed \u010d\u00e1st\u00ed. Pr\u00e1ce, kter\u00e9 za\u010daly na podzim 2024 a skon\u010dily v listopadu, provedla firma Metrostav se zhruba 50 subdodavateli. N\u00e1klady dos\u00e1hly 1,13 miliardy korun. Nov\u00e9 stavby dnes p\u0159edstavili novin\u00e1\u0159\u016fm z\u00e1stupci leti\u0161t\u011b a stavebn\u00ed firmy.<\/p>\n<p>&#8222;Severn\u00ed \u010d\u00e1st leti\u0161t\u011b \u010dekaj\u00ed v n\u00e1sleduj\u00edc\u00edch letech v\u00fdznamn\u00e9 zm\u011bny a moderniza\u010dn\u00ed projekty. St\u00e1vaj\u00edc\u00ed trasy in\u017een\u00fdrsk\u00fdch s\u00edt\u00ed v t\u00e9to \u010d\u00e1sti are\u00e1lu ji\u017e kapacitn\u011b nevyhovovaly budouc\u00edm pot\u0159eb\u00e1m. Proto bylo nutn\u00e9 vybudovat nov\u00e9,&#8220; sd\u011blila \u010cTK mluv\u010d\u00ed Leti\u0161t\u011b Praha Denisa Hejtm\u00e1nkov\u00e1. &#8222;Sice nen\u00ed (stavba) vid\u011bt, ale my ji m\u00e1me p\u0159edev\u0161\u00edm proto, abychom mohli za\u010d\u00edt stav\u011bt budovy, kter\u00e9 budou vid\u011bt,&#8220; uvedl m\u00edstop\u0159edseda p\u0159edstavenstva Leti\u0161t\u011b Praha Ji\u0159\u00ed Kraus a zm\u00ednil roz\u0161\u00ed\u0159en\u00ed Termin\u00e1lu 2, parkovac\u00ed domy nebo estak\u00e1du.<\/p>\n<p>Stavba kolektoru byla rozd\u011blena na dv\u011b \u010d\u00e1sti &#8211; na 288 metr\u016f dlouhou ra\u017eenou \u010d\u00e1st a 360 metr\u016f dlouhou hloubenou, kter\u00e9 se li\u0161\u00ed sv\u00fdm profilem. Prvn\u00ed m\u00e1 klenbu a druh\u00e1 prav\u00e9 \u00fahly. Ra\u017ebu provedla firma v m\u00edstech, kde kolektor proch\u00e1z\u00ed pod silnicemi a dal\u0161\u00ed infrastrukturou. Nov\u00fd podzemn\u00ed tunel pro in\u017een\u00fdrsk\u00e9 s\u00edt\u011b je napojen\u00fd na st\u00e1vaj\u00edc\u00ed s\u00ed\u0165 a z\u00e1rove\u0148 p\u0159ipraven\u00fd na stavbu navazuj\u00edc\u00edho kolektoru, kter\u00fd povede do are\u00e1lu jih. Projekt navazuj\u00edc\u00edho kolektoru podle mana\u017eera technick\u00e9 infrastruktury Petra Tesa\u0159e p\u0159iprav\u00ed leti\u0161t\u011b v n\u00e1sleduj\u00edc\u00edch letech.<\/p>\n<p>Nejv\u011bt\u0161\u00ed hloubka stavby je 12,6 metru pod ter\u00e9nem. V hlouben\u00e9 \u010d\u00e1sti je tunel zhruba p\u011bt metr\u016f \u0161irok\u00fd a 4,5 metru vysok\u00fd. &#8222;Je to pr\u016f\u0159ezem daleko v\u011bt\u0161\u00ed kolektor, ne\u017e jsou standardn\u00ed kolektory v centru Prahy,&#8220; \u0159ekl vedouc\u00ed projektu ze spole\u010dnosti Metrostav Nikola \u0160tochl. Tesa\u0159 p\u0159irovnal rozm\u011bry ra\u017een\u00e9 \u010d\u00e1sti k jednokolejov\u00e9mu tubusu pra\u017esk\u00e9ho metra. St\u00e1vaj\u00edc\u00ed kolektorov\u00e1 s\u00ed\u0165, kter\u00e1 je slo\u017een\u00e1 z des\u00edtek tunel\u016f, je star\u00e1 zhruba 20 let a proti nov\u00e9mu je men\u0161\u00ed.<\/p>\n<p>V nov\u00e9m kolektoru je p\u011bt \u0161achet a jedna technick\u00e1 komora, kter\u00e9 umo\u017e\u0148uj\u00ed p\u0159\u00edstup do kolektoru nap\u0159\u00edklad kv\u016fli instalaci nebo \u00fadr\u017eb\u011b z povrchu po \u017eeb\u0159\u00edc\u00edch. Zat\u00edm jsou p\u0159ipraven\u00e9 pouze kabelov\u00e9 trasy, kter\u00e9 do budoucna umo\u017en\u00ed rychl\u00e9 um\u00edst\u011bn\u00ed s\u00edt\u00ed technick\u00e9 infrastruktury. &#8222;Prvn\u00ed instalace kabelov\u00fdch tras by m\u011bly prob\u011bhnout p\u0159ibli\u017en\u011b za rok a\u017e rok a p\u016fl,&#8220; \u0159ekl Tesa\u0159. Jedin\u00e9 kabely, kter\u00e9 jsou v nov\u00fdch stavb\u00e1ch um\u00edst\u011bny, zaji\u0161\u0165uj\u00ed jejich provoz.<\/p>\n<p>V kolektoru jsou pro kabely p\u0159ipraveny nerezov\u00e9 konstrukce, kter\u00e9 se podle \u0160tochla vyu\u017e\u00edvaj\u00ed nap\u0159\u00edklad v Norsku na ryb\u00e1\u0159sk\u00fdch lod\u00edch, aby odolaly sol\u00edm z mo\u0159sk\u00e9 vody. Nerezovou konstrukci by podle n\u011bj nem\u011bly po\u0161kodit ani rozmrazovac\u00ed l\u00e1tky vyu\u017e\u00edvan\u00e9 na leti\u0161ti. V kolektorech jsou jinak b\u011b\u017en\u011b vyu\u017e\u00edvan\u00e9 konstrukce s pozinkov\u00e1n\u00edm a n\u00e1t\u011brem.<\/p>\n<p>Z trafostanice o t\u0159ech podla\u017e\u00edch budou v budoucnu nap\u00e1jeny nov\u00e9 stavby, bude tak vybavov\u00e1na postupn\u011b podle aktu\u00e1ln\u00ed pot\u0159eby. Kapacita st\u00e1vaj\u00edc\u00edch trafostanic je podle Tesa\u0159e t\u00e9m\u011b\u0159 vy\u010derpan\u00e1.<\/p>\n<p>Leti\u0161t\u011b V\u00e1clava Havla by m\u011blo v p\u0159\u00ed\u0161t\u00ed letech proj\u00edt v\u00fdznamnou modernizac\u00ed, kter\u00e1 by m\u011bla zlep\u0161it dostupnost leti\u0161t\u011b a napojen\u00ed na dopravn\u00ed infrastrukturu. Sou\u010d\u00e1st\u00ed bude nap\u0159\u00edklad v\u00fdstavba estak\u00e1dy a \u017eelezni\u010dn\u00ed stanice, ze kter\u00e9 bude mo\u017en\u00e9 po dokon\u010den\u00ed v\u00fdstavby nov\u00e9ho tra\u0165ov\u00e9ho \u00faseku cestovat do centra metropole nebo Kladna. Druh\u00e1 etapa je zam\u011b\u0159en\u00e1 na zrychlen\u00ed odbaven\u00ed a roz\u0161\u00ed\u0159en\u00ed druh\u00e9ho termin\u00e1lu a t\u0159et\u00ed na modernizaci dr\u00e1hov\u00e9ho syst\u00e9mu. Celkov\u00e9 n\u00e1klady na modernizaci se pohybuj\u00ed podle d\u0159\u00edv\u011bj\u0161\u00edch informac\u00ed kolem 32 miliard korun.<\/p>\n<p>Spole\u010dnost Leti\u0161t\u011b Praha, kter\u00e1 provozuje Leti\u0161t\u011b V\u00e1clava Havla, zv\u00fd\u0161ila loni \u010dist\u00fd zisk meziro\u010dn\u011b o 800 milion\u016f na 3,2 miliardy korun. Hrub\u00fd provozn\u00ed zisk (EBITDA) j\u00ed stoupl t\u00e9\u017e o 800 milion\u016f na 5,1 miliardy korun. Ruzy\u0148sk\u00e9 leti\u0161t\u011b loni odbavilo 17,8 milionu cestuj\u00edc\u00edch, meziro\u010dn\u011b o 1,4 milionu v\u00edce.<\/p>\n<p>krf opm<\/p>\n<p class=\"tags\">&#13;<br \/>\n<a href=\"https:\/\/www.ceskenoviny.cz\/tema\/cr\/1\" class=\"tag blue\" itemprop=\"about\" rel=\"tag nofollow noopener\" target=\"_blank\">\u010cR<\/a>&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n<a href=\"https:\/\/www.ceskenoviny.cz\/tema\/letectvi\/428\" class=\"tag blue\" itemprop=\"about\" rel=\"tag nofollow noopener\" target=\"_blank\">letectv\u00ed<\/a>&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n<a href=\"https:\/\/www.ceskenoviny.cz\/tema\/stavby\/401\" class=\"tag blue\" itemprop=\"about\" rel=\"tag nofollow noopener\" target=\"_blank\">stavby<\/a>&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n<a href=\"https:\/\/www.ceskenoviny.cz\/tema\/letiste-praha\/1338\" class=\"tag blue\" itemprop=\"about\" rel=\"tag nofollow noopener\" target=\"_blank\">Leti\u0161t\u011b Praha<\/a>&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n<a href=\"https:\/\/www.ceskenoviny.cz\/tema\/foto\/13820\" class=\"tag blue\" itemprop=\"about\" rel=\"tag nofollow noopener\" target=\"_blank\">FOTO<\/a>&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n &#13;<\/p>\n","protected":false},"excerpt":{"rendered":"&#13; Komer\u010dn\u00ed prezentace Aktual.: 27.11.2026 13:32&#13; Vyd\u00e1no: 27.11.2026, 13:32&#13; Praha &#8211; Leti\u0161t\u011b V\u00e1clava Havla m\u00e1 nov\u00fd 648 metr\u016f&hellip;\n","protected":false},"author":2,"featured_media":293252,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[30],"tags":[302,304,305,298,303,1092,939,384,98,99,6633],"class_list":["post-293251","post","type-post","status-publish","format-standard","has-post-thumbnail","category-praha","tag-ceskenoviny-cz","tag-cn","tag-cn-cz","tag-cr","tag-ctk","tag-foto","tag-letectvi","tag-letiste-praha","tag-prague","tag-praha","tag-stavby"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@cz\/117688598432822985","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/293251","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/comments?post=293251"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/293251\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media\/293252"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media?parent=293251"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/categories?post=293251"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/tags?post=293251"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}