{"id":60238,"date":"2026-04-20T07:28:13","date_gmt":"2026-04-20T07:28:13","guid":{"rendered":"https:\/\/www.europesays.com\/cz\/60238\/"},"modified":"2026-04-20T07:28:13","modified_gmt":"2026-04-20T07:28:13","slug":"desitky-tisic-stran-vykresu-nove-dukovany-jsou-uz-na-papire","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/cz\/60238\/","title":{"rendered":"Des\u00edtky tis\u00edc stran v\u00fdkres\u016f. Nov\u00e9 Dukovany jsou u\u017e na pap\u00ed\u0159e"},"content":{"rendered":"<p class=\"e_bW\">Dukovany dos\u00e1hly dal\u0161\u00edho miln\u00edku v\u00a0harmonogramu p\u0159\u00edpravy na re\u00e1lnou v\u00fdstavbu: spole\u010dnost Elektr\u00e1rna Dukovany II obdr\u017eela od korejsk\u00e9 firmy KHNP projektovou dokumentaci elektr\u00e1rny, kter\u00e1 odpov\u00edd\u00e1 \u010desk\u00fdm po\u017eadavk\u016fm. Korejci ji budou je\u0161t\u011b dvakr\u00e1t rozpracov\u00e1vat a\u00a0n\u00e1sleduj\u00edc\u00ed podobu, tedy druhou z\u00a0celkov\u00fdch t\u0159\u00ed, u\u017e dostane do rukou St\u00e1tn\u00ed \u00fa\u0159ad pro jadernou bezpe\u010dnost.<\/p>\n<p class=\"e_bW\">Jde o\u00a0kl\u00ed\u010dov\u00e9 dokumenty, kter\u00e9 popisuj\u00ed celkov\u00e9 \u0159e\u0161en\u00ed elektr\u00e1rny v\u010detn\u011b v\u0161ech zm\u011bn oproti standardn\u00edmu reaktoru APR1000.\u00a0Varianta pro \u010cesko toti\u017e mus\u00ed oproti tomu, co nab\u00edz\u00ed \u201ekatalogov\u00fd\u201c design APR1000, spl\u0148ovat specifick\u00e9 po\u017eadavky pro chlazen\u00ed, zem\u011bt\u0159esen\u00ed \u010di bezpe\u010dnost.<\/p>\n<p class=\"e_bW\">Nap\u0159\u00edklad \u010desk\u00e1 verze bude m\u00edt dvojit\u00fd kontejnment, neboli ochrannou betonovou ob\u00e1lku kolem reaktoru. Ta zajist\u00ed vy\u0161\u0161\u00ed bezpe\u010dnost a\u00a0odolnost reaktoru p\u0159ed r\u016fzn\u00fdmi n\u00e1razy a\u00a0dal\u0161\u00edm nebezpe\u010d\u00edm. Reaktory KHNP v\u00a0Koreji maj\u00ed toti\u017e jen jednoduch\u00fd obal.<\/p>\n<p class=\"e_bW\">KHNP musela rovn\u011b\u017e zohlednit podm\u00ednky, kter\u00e9 obsahuj\u00ed \u010desk\u00e9 z\u00e1kony. Spole\u010dnost tak do koncep\u010dn\u00edho projektu zapracovala n\u011bkolik des\u00edtek tis\u00edc po\u017eadavk\u016f, kter\u00e9 u\u017e p\u0159edala investorovi ke kontrole.<\/p>\n<p>Co je to koncep\u010dn\u00ed projekt?<\/p>\n<p class=\"e_bW\">Koncep\u010dn\u00ed projekt je po\u010d\u00e1te\u010dn\u00ed f\u00e1ze projektov\u00e9 dokumentace, kter\u00e1 definuje z\u00e1kladn\u00ed technick\u00e9 \u0159e\u0161en\u00ed, c\u00edle, strukturu a\u00a0funk\u010dn\u00ed celky zvolen\u00e9 varianty. Slou\u017e\u00ed k\u00a0ov\u011b\u0159en\u00ed proveditelnosti, stanoven\u00ed priorit a\u00a0nacen\u011bn\u00ed projektu p\u0159ed tvorbou podrobn\u00e9 realiza\u010dn\u00ed dokumentace. \u010casto se vyu\u017e\u00edv\u00e1 ve stroj\u00edrenstv\u00ed, energetice (nap\u0159.) \u010di strategick\u00e9m pl\u00e1nov\u00e1n\u00ed.<\/p>\n<p class=\"e_bW\">\u201eTento d\u016fle\u017eit\u00fd dokument, od kter\u00e9ho se budou odv\u00edjet dal\u0161\u00ed stupn\u011b projektov\u00e9 dokumentace, jsme obdr\u017eeli v\u00a0term\u00ednu dle smluvn\u00edho harmonogramu. Nyn\u00ed jej budeme n\u011bkolik t\u00fddn\u016f podrobn\u011b pro\u010d\u00edtat, p\u0159ipom\u00ednkovat a\u00a0projedn\u00e1vat s\u00a0jeho autory,\u201c uvedl \u0159editel technick\u00e9ho \u00fatvaru Elektr\u00e1rna Dukovany II Viktor \u010cern\u00fd.<\/p>\n<p class=\"e_bW\">\u010ce\u0161t\u00ed odborn\u00edci budou koncep\u010dn\u00ed projekt d\u016fkladn\u011b posuzovat a\u00a0p\u0159ipom\u00ednkovat. Po jeho schv\u00e1len\u00ed za\u010dne KHNP pracovat na \u00favodn\u00edm projektu, kter\u00fd u\u017e podrobn\u011bji rozpracov\u00e1v\u00e1 technick\u00e1 \u0159e\u0161en\u00ed jednotliv\u00fdch syst\u00e9m\u016f. Hotov\u00fd bude podle harmonogramu p\u0159\u00ed\u0161t\u00ed rok.<\/p>\n<p class=\"e_bW\">Dokumentace m\u00e1 des\u00edtky tis\u00edc stran. Zahrnuj\u00edc\u00ed textov\u00e9 \u010d\u00e1sti, v\u00fdkresy a\u00a0sch\u00e9mata pro elektr\u00e1rnu jako celek, ale i\u00a0jej\u00ed jednotliv\u00e9 syst\u00e9my &#8211; nap\u0159\u00edklad prim\u00e1rn\u00ed jadern\u00fd okruh v\u010detn\u011b bezpe\u010dnostn\u00edch syst\u00e9m\u016f, syst\u00e9my sekund\u00e1rn\u00edho okruhu, neboli turb\u00ednov\u00e9ho ostrova, syst\u00e9my chlazen\u00ed apod.<\/p>\n<p><img fetchpriority=\"high\" height=\"2304\"   width=\"4096\" src=\"https:\/\/www.europesays.com\/cz\/wp-content\/uploads\/2026\/04\/edu-ii-dukovany.jpeg\" loading=\"eager\" decoding=\"sync\" class=\"e_aa e_Z\"\/>Foto: EDU II<\/p>\n<p class=\"e_bW\">N\u00e1kres nov\u00fdch jadern\u00fdch blok\u016f elektr\u00e1rny Dukovany. Vyrostou hned vedle st\u00e1vaj\u00edc\u00edch a\u00a0budou m\u00edt dv\u011b chladic\u00ed v\u011b\u017ee m\u00edsto \u010dty\u0159.<\/p>\n<p class=\"e_bW\">\u201ePosouzen\u00ed koncep\u010dn\u00edho projektu se jen v\u00a0EDU II v\u011bnuje p\u0159ibli\u017en\u011b 60\u00a0lid\u00ed, dal\u0161\u00ed des\u00edtky lid\u00ed jej posuzuj\u00ed v\u00a0r\u00e1mci spole\u010dnosti Energoprojekt Praha, kter\u00e1 n\u00e1m poskytuje in\u017een\u00fdrsko-technickou podporu. Na stran\u011b na\u0161ich korejsk\u00fdch partner\u016f p\u0159ipravovaly koncep\u010dn\u00ed projekt ni\u017e\u0161\u00ed stovky osob,\u201c \u0159\u00edk\u00e1 \u010cern\u00fd.<\/p>\n<p class=\"e_bW\">Schv\u00e1len\u00ed prvn\u00edho stupn\u011b projektov\u00e9 dokumentace EDU II je podm\u00ednkou pro postup do dal\u0161\u00ed f\u00e1ze projektov\u00e1n\u00ed. Ta by podle harmonogramu m\u011bla b\u00fdt zavr\u0161ena v\u00a0p\u0159\u00ed\u0161t\u00edm roce schv\u00e1len\u00edm \u00favodn\u00edho projektu, kter\u00fd u\u017e rozpracov\u00e1v\u00e1 technick\u00e1 \u0159e\u0161en\u00ed do v\u011bt\u0161\u00edho technick\u00e9ho detailu.<\/p>\n<p><a data-dot=\"mol-article-card-media\" aria-hidden=\"true\" tabindex=\"-1\" href=\"https:\/\/www.seznamzpravy.cz\/clanek\/ekonomika-firmy-khnp-podepsala-smlouvu-na-dodavku-turbiny-do-dukovan-za-pet-miliard-korun-299038\" class=\"e_n f_l-\" rel=\"nofollow noopener\" target=\"_blank\"><img height=\"900\"   width=\"1600\" src=\"https:\/\/www.europesays.com\/cz\/wp-content\/uploads\/2026\/04\/doosan-skoda-power.jpeg\" loading=\"eager\" decoding=\"sync\" class=\"e_aa e_Z\"\/><\/a><\/p>\n<p class=\"e_bW\">Ten u\u017e je hlavn\u00edm podkladem pro licen\u010dn\u00ed a\u00a0povolovac\u00ed procesy. Detailn\u011bj\u0161\u00ed verze dokumentace u\u017e bude slou\u017eit jako podklad pro schv\u00e1len\u00ed jadern\u00fdch regul\u00e1torem. Dal\u0161\u00edm stupn\u011bm projektov\u00e9 dokumentace je prov\u00e1d\u011bc\u00ed projekt, kter\u00fd jde do nejv\u011bt\u0161\u00edch podrobnost\u00ed a\u00a0obsahuje kompletn\u00ed technick\u00e9 specifikace pot\u0159ebn\u00e9 pro obstar\u00e1v\u00e1n\u00ed, v\u00fdrobu, p\u0159epravu, v\u00fdstavbu a\u00a0spou\u0161t\u011bn\u00ed elektr\u00e1rny.<\/p>\n<p class=\"e_bW\">Minul\u00e9 pond\u011bl\u00ed skon\u010dil v\u00a0are\u00e1lu sou\u010dasn\u00e9 dukovansk\u00e9 jadern\u00e9 elektr\u00e1rny geologick\u00fd pr\u016fzkum. Jeho v\u00fdsledky potvrd\u00ed, \u017ee elektr\u00e1rna m\u016f\u017ee v\u00a0m\u00edstech, kde se je\u0161t\u011b loni rozkl\u00e1dalo pole, vyr\u016fst a\u00a0bezpe\u010dn\u011b fungovat.<\/p>\n<p class=\"e_bW\">Stavebn\u00ed povolen\u00ed by m\u011bly Dukovany z\u00edskat p\u0159\u00ed\u0161t\u00ed rok. Stavba prvn\u00edho nov\u00e9ho bloku by m\u011bla za\u010d\u00edt v\u00a0roce 2029, spu\u0161t\u011bn\u00ed elektr\u00e1rny je pl\u00e1nov\u00e1no na rok 2036.<\/p>\n","protected":false},"excerpt":{"rendered":"Dukovany dos\u00e1hly dal\u0161\u00edho miln\u00edku v\u00a0harmonogramu p\u0159\u00edpravy na re\u00e1lnou v\u00fdstavbu: spole\u010dnost Elektr\u00e1rna Dukovany II obdr\u017eela od korejsk\u00e9 firmy KHNP&hellip;\n","protected":false},"author":2,"featured_media":60239,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[43,42,41,40,1008,20992,2470,20993,18537],"class_list":{"0":"post-60238","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-cesko","8":"tag-ceska-republika","9":"tag-cesko","10":"tag-czech-republic","11":"tag-czechia","12":"tag-dukovany","13":"tag-edu-ii","14":"tag-jaderne-elektrarny","15":"tag-khnp-korea-hydro-nuclear-power","16":"tag-statni-urad-pro-jadernou-bezpecnost-sujb"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@cz\/116435858527109765","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/60238","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/comments?post=60238"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/60238\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media\/60239"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media?parent=60238"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/categories?post=60238"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/tags?post=60238"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}