{"id":98025,"date":"2026-05-26T17:11:09","date_gmt":"2026-05-26T17:11:09","guid":{"rendered":"https:\/\/www.europesays.com\/cz\/98025\/"},"modified":"2026-05-26T17:11:09","modified_gmt":"2026-05-26T17:11:09","slug":"lidi-je-malo-ale-dukovany-postavime-ceske-firmy-si-veri","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/cz\/98025\/","title":{"rendered":"Lid\u00ed je m\u00e1lo, ale Dukovany postav\u00edme. \u010cesk\u00e9 firmy si v\u011b\u0159\u00ed"},"content":{"rendered":"<p class=\"e_bX\">Tuzemsk\u00e9 stavebn\u00ed firmy maj\u00ed velk\u00e1 o\u010dek\u00e1v\u00e1n\u00ed od stavby nov\u00fdch dukovansk\u00fdch blok\u016f. Podle politick\u00fdch proklamac\u00ed i\u00a0slib\u016f investora Elektr\u00e1rny Dukovany II a\u00a0jihokorejsk\u00e9ho dodavatele KHNP by \u010desk\u00fd pr\u016fmysl m\u011bl obstarat alespo\u0148 60\u00a0procent ve\u0161ker\u00fdch dod\u00e1vek.<\/p>\n<p class=\"e_bX\">\u201eMysl\u00edm, \u017ee 60\u00a0procent je ve\u0159ejn\u00fd slib, kter\u00fd tady padl a\u00a0m\u00e1me k\u00a0n\u011bmu sm\u011b\u0159ovat, nebo i\u00a0k v\u011bt\u0161\u00edmu pod\u00edlu. V\u016fbec si nep\u0159ipou\u0161t\u00edm, \u017ee bychom toho nedos\u00e1hli. Je to p\u0159\u00edle\u017eitost i\u00a0pro korejsk\u00e9 a\u00a0\u010desk\u00e9 firmy s\u00a0perspektivou dlouhodob\u011bj\u0161\u00ed spolupr\u00e1ce. P\u0159edpokl\u00e1d\u00e1m, \u017ee ani KHNP tady nebude cht\u00edt z\u016fstat jen u\u00a0t\u00e9to spolupr\u00e1ce na Dukovanech,\u201c \u0159ekl na konferenci J\u00e1dro prezident Hospod\u00e1\u0159sk\u00e9 komory Zden\u011bk Zaj\u00ed\u010dek.<\/p>\n<p class=\"e_bX\">Z dan\u00e9ho pod\u00edlu tvo\u0159\u00ed stavebn\u00ed \u010d\u00e1st 20\u00a0a\u017e 30\u00a0procent, co\u017e p\u0159edstavuje \u0161anci pro tuzemsk\u00e9 stavebn\u00ed firmy. Ty v\u011b\u0159\u00ed, \u017ee si s\u00e1hnou na maximum stavebn\u00edch prac\u00ed, kter\u00e9 ob\u0159\u00ed projekt nab\u00edz\u00ed. \u201eStavebn\u00ed firmy jsou p\u0159ipraveny dodat 100\u00a0procent stavebn\u00ed \u010d\u00e1sti,\u201c \u0159\u00edk\u00e1 Karel Volf ze spole\u010dnosti Metrostav.<\/p>\n<p class=\"e_bX\">\u010cesk\u00e9 firmy maj\u00ed \u0161anci usp\u011bt ve v\u0161ech oblastech v\u00fdstavby, ale zejm\u00e9na ve stavebn\u00ed \u010d\u00e1sti, nebo\u0165 dob\u0159e znaj\u00ed zdej\u0161\u00ed prost\u0159ed\u00ed. \u201eJsem p\u0159esv\u011bd\u010den\u00fd, \u017ee \u010desk\u00e9 firmy jsou schopn\u00e9 to dodat ve stejn\u00e9 kvalit\u011b a\u00a0cen\u011b, jako firmy odjinud,\u201c dod\u00e1v\u00e1 gener\u00e1ln\u00ed \u0159editel spole\u010dnosti Elektr\u00e1rna Dukovany II Petr Z\u00e1vodsk\u00fd.<\/p>\n<p><a data-dot=\"mol-article-card-media\" aria-hidden=\"true\" tabindex=\"-1\" href=\"https:\/\/www.seznamzpravy.cz\/clanek\/ekonomika-finance-pripravy-na-dostavbu-dukovan-bezi-stat-chysta-migracni-plan-307006\" class=\"e_n f_l1\" rel=\"nofollow noopener\" target=\"_blank\"><img fetchpriority=\"high\" height=\"1101\"   width=\"1957\" src=\"https:\/\/www.europesays.com\/cz\/wp-content\/uploads\/2026\/04\/elektrarna-dukovany-jadro.jpeg\" loading=\"eager\" decoding=\"sync\" class=\"e_aa e_Z\"\/><\/a><\/p>\n<p class=\"e_bX\">\u00da\u010dast na projektu v\u00a0Dukovanech pro tuzemsk\u00fd pr\u016fmysl p\u0159edstavuje \u0161anci na \u00fa\u010dast v\u00a0jadern\u00fdch zak\u00e1zk\u00e1ch v\u00a0zahrani\u010d\u00ed, pokud se osv\u011bd\u010d\u00ed u\u00a0dodavatel\u016f, kte\u0159\u00ed je budou stav\u011bt. U\u00a0Dukovan nejde jen o\u00a0KHNP, ale tak\u00e9 o\u00a0americkou spole\u010dnost Westinghouse, kter\u00e1 bude jedn\u00edm ze subdodavatel\u016f.<\/p>\n<p class=\"e_bX\">\u201eSou\u010d\u00e1st\u00ed dodavatelsk\u00e9ho \u0159et\u011bzce bude i\u00a0Westinghouse, kter\u00fd bude stav\u011bt jadern\u00e9 bloky v\u00a0Polsku, tak\u017ee i\u00a0to je p\u0159\u00edle\u017eitost pro \u010desk\u00e9 firmy,\u201c \u0159\u00edk\u00e1 \u0159editel sekce jadern\u00e1 energetika na ministerstvu pr\u016fmyslu a\u00a0obchodu Tom\u00e1\u0161 Ehler.<\/p>\n<p class=\"e_bX\">\u010clen dozor\u010d\u00ed rady spole\u010dnosti Hochtief Pavel R\u016f\u017ei\u010dka v\u011b\u0159\u00ed, \u017ee \u00fa\u010dast \u010desk\u00fdch firem m\u016f\u017ee p\u0159es\u00e1hnout deklarovan\u00fdch 60\u00a0procent. \u201eBude to 80\u00a0procent, ale pro stavebnictv\u00ed v\u011b\u0159\u00edm, \u017ee to bude 100\u00a0procent,\u201c uvedl na konferenci J\u00e1dro.<\/p>\n<p class=\"e_bX\">Stavebnictv\u00ed m\u00e1 mnoho mo\u017enost\u00ed, jak se na projektu pod\u00edlet &#8211; od stavby ubytov\u00e1n\u00ed pro pracovn\u00edky, p\u0159es dopravn\u00ed stavby po pr\u00e1ce na samotn\u00e9 elektr\u00e1rn\u011b, kterou mohou postavit od z\u00e1klad\u016f po kl\u00ed\u010dov\u00e9 technologie, jako jsou chladic\u00ed v\u011b\u017ee \u010di ochrann\u00e1 ob\u00e1lka reaktoru. Firmy nyn\u00ed o\u010dek\u00e1vaj\u00ed, \u017ee bude brzy vyps\u00e1no v\u00fdb\u011brov\u00e9 \u0159\u00edzen\u00ed na stavbu chladic\u00edch v\u011b\u017e\u00ed, kter\u00e9 maj\u00ed b\u00fdt vysok\u00e9 p\u0159es 180\u00a0metr\u016f.<\/p>\n<p class=\"e_bX\">C\u00edl 60\u00a0procent je re\u00e1ln\u00fd i\u00a0z pohledu ministerstva pr\u016fmyslu. \u201eV\u011b\u0159\u00edm, \u017ee dos\u00e1hnou je\u0161t\u011b v\u011bt\u0161\u00edho \u010d\u00edsla,\u201c \u0159\u00edk\u00e1 Ehler.<\/p>\n<p class=\"e_bX\">\u010cesk\u00fd pr\u016fmysl m\u00e1 k\u00a0dosa\u017een\u00ed \u010di p\u0159ekro\u010den\u00ed miln\u00edku nejen ambice, ale podle Josefa Kotrby, p\u0159edsedy Svazu energetiky, i\u00a0schopnosti. \u201eKdy\u017e se budeme sna\u017eit, m\u00e1me \u0161anci to p\u0159ekro\u010dit, nebo toho dos\u00e1hnout. M\u00e1me tady p\u011bkn\u00e9 kusy dodavatelsk\u00e9 \u0159et\u011bzce. Budeme usilovat o\u00a0to, aby se \u010desk\u00e9 firmy mohly pod\u00edlet i\u00a0na dal\u0161\u00edch projektech,\u201c popisuje Kotrba.<\/p>\n<p class=\"e_bX\">Energetici i\u00a0politici s\u00a0oblibou \u0159\u00edkaj\u00ed, \u017ee dukovansk\u00fd projekt znamen\u00e1 spolupr\u00e1ci a\u017e na p\u0159\u00ed\u0161t\u00ed stolet\u00ed. Po\u010d\u00edt\u00e1 se s\u00a0t\u00edm, \u017ee p\u0159\u00edprava a\u00a0stavba jednoho bloku v\u00a0Dukovanech zabere zhruba jedno desetilet\u00ed, dal\u0161\u00edch 60\u00a0a\u00a0v\u00edce let se budou bloky provozovat. V\u00a0sou\u010dasnosti se v\u0161ak provoz blok\u016f b\u011b\u017en\u011b prodlu\u017euje i\u00a0za horizont 80\u00a0let.<\/p>\n<p class=\"e_bX\">Stavebn\u00ed konstrukce tak mus\u00ed b\u00fdt natolik kvalitn\u00ed a\u00a0bezpe\u010dn\u00e1, aby vydr\u017eela pr\u00e1v\u011b 80\u00a0let, co\u017e podle z\u00e1stupc\u016f stavebn\u00edho pr\u016fmyslu \u010desk\u00e9 firmy um\u00ed. Stava\u0159i si tak\u00e9 mus\u00ed v\u010das sehnat dostatek materi\u00e1lu, p\u0159i\u010dem\u017e mohou vyu\u017e\u00edt lok\u00e1ln\u00ed suroviny jako \u0161t\u011brkop\u00edsek, kamenivo \u010di cement. Jeden blok elektr\u00e1rny toti\u017e \u201espolkne\u201c zhruba 100\u00a0a\u017e 200\u00a0tis\u00edc kub\u00edk\u016f betonu.<\/p>\n<p>Stava\u0159\u016fm mohou chyb\u011bt lid\u00e9 i\u00a0materi\u00e1l<\/p>\n<p class=\"e_bX\">Z \u010deho a\u00a0kdo velk\u00e9 strategick\u00e9 stavby, jako je j\u00e1dro a\u00a0dopravn\u00ed infrastruktura, postav\u00ed, je pro tuzemsk\u00e9 spole\u010dnosti kl\u00ed\u010dovou ot\u00e1zkou. \u201eCena stavebn\u00edch prac\u00ed roste. Suroviny budeme z\u00edsk\u00e1vat v\u00a0zahrani\u010d\u00ed dr\u00e1\u017e, ne\u017e kdy\u017e si je budeme dob\u00fdvat doma,\u201c popisuje Zaj\u00ed\u010dek.<\/p>\n<p class=\"e_bX\">Podle anal\u00fdzy ministerstva pr\u016fmyslu a\u00a0obchodu bude pro stavbu nov\u00fdch blok\u016f pot\u0159eba 8000\u00a0nov\u00fdch pracovn\u00edk\u016f, n\u011bkter\u00e9 studie uv\u00e1d\u011bj\u00ed i\u00a0v\u00edce. Situace na trhu pr\u00e1ce a\u00a0obzvl\u00e1\u0161\u0165 ve stavebnictv\u00ed je kritick\u00e1 &#8211; v\u00a0dob\u011b stavby nov\u00e9ho j\u00e1dra m\u016f\u017ee v\u00a0sektoru podle Svazu podnikatel\u016f ve stavebnictv\u00ed chyb\u011bt 74\u00a0tis\u00edc lid\u00ed.<\/p>\n<p class=\"e_bX\">\u201eO kapacity bych m\u011bl seri\u00f3zn\u00ed obavy. Kdo si je zajist\u00ed, bude m\u00edt vyhr\u00e1no, jinak je tady opr\u00e1vn\u011bn\u00e1 obava, \u017ee cena zak\u00e1zek poroste. Jinak v\u00a0roce 2030\u00a0bude stava\u0159ina p\u0159eh\u0159\u00e1t\u00e1,\u201c \u0159\u00edk\u00e1 Volf.<\/p>\n<p><a data-dot=\"mol-article-card-media\" aria-hidden=\"true\" tabindex=\"-1\" href=\"https:\/\/www.seznamzpravy.cz\/clanek\/ekonomika-firmy-nova-jaderna-era-v-cesku-spolkne-tisice-dalsich-lidi-zacit-se-musi-uz-ted-304980\" class=\"e_n f_l1\" rel=\"nofollow noopener\" target=\"_blank\"><img height=\"1687\"   width=\"3000\" src=\"https:\/\/www.europesays.com\/cz\/wp-content\/uploads\/2026\/05\/e4f9.jpeg\" loading=\"eager\" decoding=\"sync\" class=\"e_aa e_Z\"\/><\/a><\/p>\n<p class=\"e_bX\">Management stavby by podle n\u011bj m\u011bl z\u016fstat \u010desk\u00fd, ale Metrostav ohledn\u011b p\u0159\u00edchodu pracovn\u00edk\u016f spolupracuje i\u00a0s dal\u0161\u00edmi st\u00e1ty Evropsk\u00e9 unie, dal\u0161\u00ed mo\u017enost\u00ed je i\u00a0Ukrajina. Odkud lid\u00e9 budou p\u0159ich\u00e1zet, je tak\u00e9 na dohod\u011b se spole\u010dnost\u00ed Daewoo, kter\u00e1 m\u00e1 zast\u0159e\u0161ovat stavebn\u00ed \u010d\u00e1st Dukovan pod KHNP.<\/p>\n<p class=\"e_bX\">\u201eV n\u011bjak\u00e9 \u0161pi\u010dce to probl\u00e9m bude, ale postupn\u011b si jsme schopni je zajistit. Mus\u00ed to b\u00fdt st\u00e1le z\u00a0evropsk\u00fdch zem\u00ed, to si mysl\u00edm, \u017ee je nejjednodu\u0161\u0161\u00ed cesta,\u201c dod\u00e1v\u00e1 R\u016f\u017ei\u010dka.<\/p>\n<p class=\"e_bX\">Pro stavebn\u00ed firmy je nyn\u00ed d\u016fle\u017eit\u00e9, aby m\u011bly zaji\u0161t\u011bny zak\u00e1zky na del\u0161\u00ed dobu dop\u0159edu, nemohou spol\u00e9hat jen na stavbu jadern\u00fdch elektr\u00e1ren, aby nabran\u00e9 zam\u011bstnance mohly vyu\u017e\u00edt do budoucna jinde. \u201eKdy\u017e stavebn\u00ed firmy nebudou v\u011bd\u011bt, \u017ee zak\u00e1zky tady v\u00a0p\u0159\u00ed\u0161t\u00edch deseti\u00a0letech budou, tak si person\u00e1ln\u00ed kapacity ani zaji\u0161\u0165ovat nebudou,\u201c upozor\u0148uje Zaj\u00ed\u010dek.<\/p>\n<p class=\"e_bX\">Zapojen\u00ed \u010desk\u00fdch firem d\u00e1v\u00e1 smysl i\u00a0do budoucna, kdy by se mohly pod\u00edlet na servisu a\u00a0\u00fadr\u017eb\u011b elektr\u00e1rny.<\/p>\n<p class=\"e_bX\">\u010cesko m\u00e1 nav\u00edc v\u00fdhodu, \u017ee um\u00ed jadern\u00e9 elektr\u00e1rny provozovat samo a\u00a0m\u00e1 s\u00a0t\u00edm bohat\u00e9 zku\u0161enosti, nebo\u0165 zdroje v\u00a0Temel\u00edn\u011b a\u00a0Dukovanech zde funguj\u00ed od minul\u00e9ho tis\u00edcilet\u00ed. Ob\u011b stavby jsou nav\u00edc z\u00a090\u00a0procent \u201eslo\u017eeny\u201c \u010desk\u00fdmi firmami. \u201eElektr\u00e1rny si jsme schopni sami provozovat, samoz\u0159ejm\u011b mus\u00edme dov\u00e1\u017eet jadern\u00e9 palivo, ale to jsme schopni nakoupit na t\u0159i roky dop\u0159edu,\u201c popisuje Z\u00e1vodsk\u00fd.<\/p>\n<p class=\"e_bX\">Samotn\u00e1 stavba prvn\u00edho jadern\u00e9ho bloku by v\u00a0Dukovanech m\u011bla za\u010d\u00edt v\u00a0roce 2029.\u00a0Prvn\u00ed jadern\u00e9 palivo by do Dukovan m\u011blo b\u00fdt zavezeno roku 2036.\u00a0S\u00a0odstupem by se m\u011bl za\u010d\u00edt stav\u011bt i\u00a0druh\u00fd blok. Sou\u010dasn\u00e1 vl\u00e1da po\u010d\u00edt\u00e1 s\u00a0t\u00edm, \u017ee se pozd\u011bji postav\u00ed i\u00a0dal\u0161\u00ed jadern\u00e9 bloky v\u00a0Temel\u00edn\u011b, na kter\u00e9 m\u00e1 spole\u010dnost KHNP opci. Ministr pr\u016fmyslu Karel Havl\u00ed\u010dek (ANO) by cht\u011bl vid\u011bt i\u00a0nab\u00eddky na Temel\u00edn od dal\u0161\u00edch dodavatel\u016f, nejen od Korejc\u016f. Pokud se v\u0161ak korejsk\u00e1 nab\u00eddka uk\u00e1\u017ee jako nejv\u00fdhodn\u011bj\u0161\u00ed, bude logick\u00fdm krokem opci aktivovat. Zat\u00edm v\u0161ak nen\u00ed dobojov\u00e1no. <\/p>\n","protected":false},"excerpt":{"rendered":"Tuzemsk\u00e9 stavebn\u00ed firmy maj\u00ed velk\u00e1 o\u010dek\u00e1v\u00e1n\u00ed od stavby nov\u00fdch dukovansk\u00fdch blok\u016f. Podle politick\u00fdch proklamac\u00ed i\u00a0slib\u016f investora Elektr\u00e1rny Dukovany&hellip;\n","protected":false},"author":2,"featured_media":98026,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[7],"tags":[43,42,41,40,20565,1008,2470,592,3837],"class_list":["post-98025","post","type-post","status-publish","format-standard","has-post-thumbnail","category-cesko","tag-ceska-republika","tag-cesko","tag-czech-republic","tag-czechia","tag-dodavatele","tag-dukovany","tag-jaderne-elektrarny","tag-prumysl","tag-stavebnictvi"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@cz\/116641994513108955","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/98025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/comments?post=98025"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/posts\/98025\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media\/98026"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/media?parent=98025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/categories?post=98025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/cz\/wp-json\/wp\/v2\/tags?post=98025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}