{"id":1279949,"date":"2026-09-04T10:23:14","date_gmt":"2026-09-04T10:23:14","guid":{"rendered":"https:\/\/www.europesays.com\/de\/1279949\/"},"modified":"2026-09-04T10:23:14","modified_gmt":"2026-09-04T10:23:14","slug":"the-geutebrueck-building-at-htwk-leipzig-the-comprehensive-energy-efficiency-refurbishment-is-now-entering-its-critical-phase-%c2%b7-leipziger-zeitung","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/de\/1279949\/","title":{"rendered":"The Geutebr\u00fcck building at HTWK Leipzig: the comprehensive energy-efficiency refurbishment is now entering its critical phase \u00b7 Leipziger Zeitung"},"content":{"rendered":"<p class=\"translation-notice\">Dieser Artikel ist auch in deutscher Sprache verf\u00fcgbar: <a href=\"https:\/\/www.l-iz.de\/bildung\/forschung\/2026\/09\/geutebrueck-bau-der-htwk-leipzig-die-energetische-generalsanierung-geht-jetzt-in-die-heisse-phase-669228\" rel=\"nofollow noopener\" target=\"_blank\">Zum deutschen Artikel<\/a>.<\/p>\n<p>The building has been empty for months now. Over the last few days, the Geutebr\u00fcck building of the HTWK on Karl-Liebknecht-Stra\u00dfe has now been completely covered in scaffolding. Under the supervision of the Leipzig II branch of the state-owned enterprise S\u00e4chsisches Immobilien- und Baumanagement (SIB), extensive renovation work is now underway on the Geutebr\u00fcck building of the Leipzig University of Applied Sciences (HTWK Leipzig).<\/p>\n<p>As part of the heritage-sensitive refurbishment and modernisation of the building complex \u2013 comprising the seminar, teaching and lecture theatre blocks \u2013 which has been underway since 2024, work includes, amongst other things, the structural fire safety measures are being upgraded, the building envelope is being renovated to improve energy efficiency, and the high-voltage and telecommunications systems are being brought up to the latest standards. In addition, a modern security concept and the provision of barrier-free access to all parts of the building, including the southern entrance area, are being implemented. Spatial and functional adaptations to the staggered storey and its connection to the main stairwell of the teaching building are also planned, as is the installation of an additional lecture theatre in the former soil mechanics laboratory area in the basement of the lecture theatre building.<\/p>\n<p>The issue of contamination is also a concern<\/p>\n<p>Furthermore, according to the SIB, extensive refurbishment work on the building fabric is required, including the remediation of areas contaminated with hazardous substances, the strengthening of timber-beamed ceilings in the seminar building, the insulation and waterproofing of floor slabs in the teaching and lecture theatre buildings, and the renewal of the building\u2019s waterproofing in areas in contact with the ground. In addition, reinforced concrete elements will be reinforced and surface finishes refurbished to improve indoor environment quality, acoustics and functionality. The outdoor facilities are being redesigned. Pavements, traffic areas, parking spaces and communal areas are being laid out anew, the perimeter fencing is being reinforced, and the media supply and disposal systems on the site are being restructured.<\/p>\n<p>With the fa\u00e7ade scaffolding now in place, core works have begun in all parts of the building. Work has already been completed on the reorganisation of the utility networks on the courtyard side, including new utility connections, the reinforcement of the timber-beamed ceilings in the seminar building, and the replacement of the floor slabs in the basement of the teaching building. The comprehensive refurbishment is scheduled for completion in 2029.<\/p>\n<p>The total construction costs currently approved for the extensive refurbishment of the complex amount to around 40 million euros. Funding for the project is available from the European Regional Development Fund (EE-EFRE), which supports investments aimed at improving the energy efficiency of university buildings and state-owned properties. The construction project is co-financed by tax revenue based on the budget approved by the Saxon State Parliament.<\/p>\n<p>The Geutebr\u00fcck Building<\/p>\n<p>The Geutebr\u00fcck Building complex, named after Albert Geutebr\u00fcck (1801\u20131868), the first director of the Royal Saxon School of Civil Engineering, consists of three buildings: the seminar building, the Teaching Building and the Lecture Theatre Building, and forms a central part of the <a href=\"http:\/\/www.htwk-leipzig.de\" target=\"_blank\" rel=\"noopener nofollow\">HTWK Leipzig<\/a> campus along Richard-Lehmann-Stra\u00dfe, <a href=\"https:\/\/www.l-iz.de\/tag\/karl-liebknecht-strasse\" target=\"_blank\" rel=\"noopener nofollow\">Karl-Liebknecht-Stra\u00dfe<\/a> and Eichendorffstra\u00dfe in Leipzig\u2019s S\u00fcdvorstadt district.<\/p>\n<p>The building\u2019s clock tower marks its location at a significant urban junction where two central axes meet in Leipzig city centre. The complex is visible from afar along one of Leipzig\u2019s most famous streets and serves as a flagship for the university.<\/p>\n<p>The Geutebr\u00fcck Building houses the university management, other key university departments, the Faculty of Civil Engineering and the University Language Centre. It contains centrally located lecture theatres and seminar rooms. All three buildings in the complex are listed as individual monuments.<\/p>\n","protected":false},"excerpt":{"rendered":"Dieser Artikel ist auch in deutscher Sprache verf\u00fcgbar: Zum deutschen Artikel. The building has been empty for months&hellip;\n","protected":false},"author":2,"featured_media":1279948,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[1832],"tags":[3364,29,233392,30,42151,71,859],"class_list":["post-1279949","post","type-post","status-publish","format-standard","has-post-thumbnail","category-leipzig","tag-de","tag-deutschland","tag-english-version","tag-germany","tag-htwk","tag-leipzig","tag-sachsen"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@de\/117212283269899925","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/posts\/1279949","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/comments?post=1279949"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/posts\/1279949\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/media\/1279948"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/media?parent=1279949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/categories?post=1279949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/tags?post=1279949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}