{"id":1393205,"date":"2026-11-10T18:23:45","date_gmt":"2026-11-10T18:23:45","guid":{"rendered":"https:\/\/www.europesays.com\/de\/1393205\/"},"modified":"2026-11-10T18:23:45","modified_gmt":"2026-11-10T18:23:45","slug":"karlsruhe-wegen-defekt-tunnel-groetzingen","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/de\/1393205\/","title":{"rendered":"Karlsruhe: Wegen Defekt Tunnel Gr\u00f6tzingen"},"content":{"rendered":"<p class=\"mb-6 text-xs-varying md:text-m lg:text-l font-serif group-[.font-sans]:font-sans \">\n    Im Tunnel Gr\u00f6tzingen wurde im Rahmen von Wartungsarbeiten ein<strong class=\"font-bold\"> Defekt an der Elektronik<\/strong> eines der sechs Tunnelbel\u00fcftungen festgestellt.\u00a0Das gibt die Stadt <a href=\"https:\/\/www.ka-news.de\/karlsruhe\" target=\"_self\" class=\"underline \" rel=\"nofollow noopener\">Karlsruhe<\/a> in einer Mitteilung vom 10. November bekannt.\n  <\/p>\n<p>            Firmen stimmen Reparatur des Tunnel-Ventilators ab<\/p>\n<p class=\"mb-6 text-xs-varying md:text-m lg:text-l font-serif group-[.font-sans]:font-sans \">\n    Die zust\u00e4ndigen Firmen sind informiert und befinden sich derzeit in Abstimmung, um die erforderlichen Ma\u00dfnahmen zur schnellstm\u00f6glichen Instandsetzung des Ventilators einzuleiten.\u00a0<strong class=\"font-bold\">Bis zur vollst\u00e4ndigen Reparatur kann der Tunnel nur mit 50 km\/h befahren werden.<\/strong>\n  <\/p>\n<p class=\"mb-6 text-xs-varying md:text-m lg:text-l font-serif group-[.font-sans]:font-sans \">\n    Alle Verkehrsteilnehmer werden um Verst\u00e4ndnis und gleichzeitig um erh\u00f6hte Aufmerksamkeit im Tunnel gebeten.\n  <\/p>\n","protected":false},"excerpt":{"rendered":"Im Tunnel Gr\u00f6tzingen wurde im Rahmen von Wartungsarbeiten ein Defekt an der Elektronik eines der sechs Tunnelbel\u00fcftungen festgestellt.\u00a0Das&hellip;\n","protected":false},"author":2,"featured_media":1393206,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[1844],"tags":[1634,3364,29,30743,287441,30,21163,41897,8903,4733,287442,59998,6241],"class_list":["post-1393205","post","type-post","status-publish","format-standard","has-post-thumbnail","category-karlsruhe","tag-baden-wuerttemberg","tag-de","tag-deutschland","tag-elektronik","tag-elektronikschaden","tag-germany","tag-groetzingen","tag-instandsetzung","tag-karlsruhe","tag-tunnel","tag-tunnelbelueftung","tag-ventilator","tag-wartungsarbeit"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@de\/117593545344470300","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/posts\/1393205","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/comments?post=1393205"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/posts\/1393205\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/media\/1393206"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/media?parent=1393205"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/categories?post=1393205"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/tags?post=1393205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}