{"id":317952,"date":"2025-08-04T09:23:19","date_gmt":"2025-08-04T09:23:19","guid":{"rendered":"https:\/\/www.europesays.com\/de\/317952\/"},"modified":"2025-08-04T09:23:19","modified_gmt":"2025-08-04T09:23:19","slug":"berlin-brandenburg-reparaturen-im-tiergartentunnel-kosteten-150-000-euro","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/de\/317952\/","title":{"rendered":"Berlin &#038; Brandenburg: Reparaturen im Tiergartentunnel kosteten 150.000 Euro"},"content":{"rendered":"<p>                    Berlin &amp; Brandenburg<br \/>\n                Reparaturen im Tiergartentunnel kosteten 150.000 Euro<\/p>\n<p>\t\t\t\t              04.08.2025, 08:36 Uhr<\/p>\n<p><strong>Fahrzeuge ab 3,5 Tonnen durften ein halbes Jahr lang nicht in s\u00fcdlicher Richtung durch den Tiergartentunnel fahren. Die Reparaturen sind abgeschlossen &#8211; und die Kosten nun bekannt.<\/strong><\/p>\n<p>Berlin (dpa\/bb) &#8211; Die Reparaturarbeiten im Tiergartentunnel haben rund 150.000 Euro gekostet und sind vom Land Berlin \u00fcbernommen worden. Das berichtete der &#8222;Tagesspiegel&#8220;-Newsletter &#8222;Checkpoint&#8220; mit Berufung auf Angaben der Verkehrsverwaltung. &#8222;Es wurden Strahlventilatoren demontiert, instandgesetzt, montiert und wieder in die Steuerung eingebunden.&#8220;<\/p>\n<p>Wegen Problemen mit den L\u00fcftungsanlagen war der Tiergartentunnel Anfang November 2024 in s\u00fcdlicher Richtung f\u00fcr den Autoverkehr komplett gesperrt worden.\u00a0<\/p>\n<p>Sperrung ist aufgehoben<\/p>\n<p>Wegen \u00fcberh\u00f6hter Schwingungswerten und Materialsch\u00e4den seien mehrere L\u00fcfter demontiert worden. Dadurch gehe das Brandl\u00fcftungskonzept nicht mehr f\u00fcr den gesamten Verkehr auf, hie\u00df es damals zur Begr\u00fcndung.<\/p>\n<p>Seit vergangener Woche ist die Sperrung auch f\u00fcr Transporter und Lastwagen ab 3,5 Tonnen wieder aufgehoben. Kleinere Autos d\u00fcrfen schon seit Anfang Dezember wieder durch den Tunnel fahren.<\/p>\n","protected":false},"excerpt":{"rendered":"Berlin &amp; Brandenburg Reparaturen im Tiergartentunnel kosteten 150.000 Euro 04.08.2025, 08:36 Uhr Fahrzeuge ab 3,5 Tonnen durften ein&hellip;\n","protected":false},"author":2,"featured_media":317953,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1825],"tags":[296,1890,29,4788,30,66787,90808],"class_list":{"0":"post-317952","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-berlin","8":"tag-berlin","9":"tag-brandenburg","10":"tag-deutschland","11":"tag-euro","12":"tag-germany","13":"tag-reparaturen","14":"tag-tiergartentunnel"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@de\/114969772266555033","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/posts\/317952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/comments?post=317952"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/posts\/317952\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/media\/317953"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/media?parent=317952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/categories?post=317952"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/de\/wp-json\/wp\/v2\/tags?post=317952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}