News
US EV maker to sink €3 billion into ts Berlin Gigafactory as it seeks to use the site to build a million Cybercabs each year.
GE
George East
18 November 2026, 09:20 GMT · 2 min read
Add as a preferred source on Google
Tesla has announced it will build its self-driving Cybercab at its Berlin Gigafactory from 2029.
The Elon Musk-run carmaker added that it will invest €3 billion (approximately £2.28bn) in the plant, with construction set to begin during the first half of 2027. Upon completion, it aims to build up to one million Cybercabs annually in a dedicated zone. The facility is located 19 miles from Berlin in the town of Grünheide.
According to Reuters, Tesla plans to apply for building permits by the end of this year. In a statement, it said: “With this, we are laying the foundation for the most technologically advanced Tesla factory in the world, here in Grünheide.”
The Tesla Cybercab was announced in 2024, and is set to be delivered to a handful of customers by the end of 2026 (Image: Tesla)
Plans for the dedicated Cybercab site includes a separate 500,000m² production house, which will be built to the north of the current Berlin Gigafactory.
The scheduled locale’s dimensions make it roughly twice the size of the existing site, and the expansion is said to include supporting buildings and a new wastewater treatment plant.
The Tesla Gigafactory near Berlin, Germany (Image: Tesla)
The Berlin Gigafactory began production in March 2022 and currently only builds Tesla’s best-selling Model Y,to the tune of 7,000 vehicles weekly. Production is soon set to increase to 7,500 – the site’s full capacity.
Throughout 2025, Tesla’s Gigafactory Berlin built a total of 202,000 vehicles with 13,000 staff. Given Tesla’s Cybercab ambitions, the number of employees will surely rise as site construction and vehicle production begins.
No steering wheel, two seats – that’s the Cybercab way (Image: Tesla)
In true Tesla style, the Cybercab has already courted controversy before mass production starts. Pricing has been announced at $29,990 (around £23,000) with a monthly subscription fee of $299 (some £230) to use the autonomous driving features.
Factoring in the $29.9k downpayment with a 12-month subscription fee of $3,588, this brings the total first-year of the vehicle to $33,578 (roughly £26,000).
A small batch of vehicles will be built before the end of 2026 for a “select few” customers in the Texan cities of Austin, Dallas, Fort Worth, Houston, and San Antonio. However, these vehicles will be operationally-restricted to certain areas within these cities.