Central Avenue is being built between the Centrum metro station and Warsaw Central Station. Next to the Palace of Culture and Science, there will be smooth stone pavements, colourful flowerbeds and shaded rest areas. The works will cost a total of 10.6 million zlotys and will take a few more months to complete.
Aleja Centralna will link the ‘poets’ walkways’
The ongoing redevelopment is focused on the section from the ‘frying pan’ near the Centrum metro station to Emilii Plater Street, between the southern side of the Palace of Culture and Science and the pavilions of the Warszawa Śródmieście station. This route is home to the Wisława Szymborska, Kazimiera Iłłakowiczówna and Zuzanna Ginczanka walkways, used by thousands of pedestrians every day. Until now, travellers have been hampered by uneven paving slabs and stone kerbs, which the wheels of suitcases and trolleys would catch on. The ongoing renovation is intended to make this route easier to navigate.
Before the renovation. Photo: Google Maps

New crossing already under construction
The City Roads Authority announced that work had begun on 23 October 2026. Balzola has been appointed as the contractor. Changes will also be made to the cross-street walkways named after Halina Poświatowska, Anna Świrszczyńska, Izabela Morska and Irena Krzywicka. The project is part of the New Centre of Warsaw programme, under which the nearby Central Square was built. The renovated pedestrian zone will transform another section of the immediate surroundings of the Palace of Culture and Science, this time on the side facing Aleje Jerozolimskie.
Central Avenue with a stone surface
Worn and uneven pavements will be replaced by neatly laid stone slabs, colour-coordinated with the palace’s historic surroundings. The new paving is intended to make it easier for people with luggage and pushchairs, amongst others, to get around. In the Kazimiera Iłłakowiczówna Passage, cycling will be permitted between Marszałkowska and Emilii Plater streets. The lighting will also be updated. The old concrete lampposts on the side of Warszawa Śródmieście station will be replaced by aluminium, more stylish lampposts.
Before the renovation. Photo: zdm.waw.pl
Visualisation of the future. Photo: zdm.waw.pl



Greenery instead of concrete
Once sections of the road surface have been removed, the biologically active area will increase by around 800 square metres. The flowerbeds, in turn, will cover almost 9,000 square metres, and their design will draw inspiration from 1950s landscaping schemes. Central Avenue will feature, amongst other things, ground-covering roses, bouquet hydrangeas, dogwoods, salvias, irises and ornamental grasses. Irregularly arranged plants will introduce seasonal changes in colour and texture. The new trees will include Freeman maples and Dutch lime trees. Above the roof of the cross-city line tunnel, where there is insufficient space for extensive root systems, smaller multi-stemmed varieties will be planted, including Persian pear trees and ornamental cherry trees of the ‘The Bride’ variety.
Central Avenue: clock and pergolas
At the level of the Kinoteka, situated in the central part of the Palace of Culture and Science, the existing sundial will be recreated in the new paving. It will be surrounded by benches and four pergolas planted with vines and milin. Over time, the climbing plants are set to form green canopies providing shade during the summer heat. This section of the promenade will serve as a place to rest whilst on the way to catch a train, before a film screening, or whilst strolling past the palace. The works are due to be completed in the first quarter of 2027.
Source: Warsaw Municipal Roads Authority
See also:Squares, Public Spaces, Parks|Warsaw|Green Spaces|City|whiteMAD on Instagram