{"id":10757,"date":"2026-02-12T14:46:25","date_gmt":"2026-02-12T14:46:25","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/10757\/"},"modified":"2026-02-12T14:46:25","modified_gmt":"2026-02-12T14:46:25","slug":"building-a-heavy-icebreaker-in-helsinki","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/10757\/","title":{"rendered":"Building a &#8216;heavy&#8217; icebreaker in Helsinki"},"content":{"rendered":"<p>\t\t\t\t\t\t\t\t\t\t\tBy Peter Rybski<br \/>\n\t\t\t\t\t\t\t\t\t\tSeptember 23, 2025\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\t\t\t\t 4191                <\/p>\n<p>            <img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-110034 size-full\" src=\"https:\/\/www.arctictoday.com\/wp-content\/uploads\/2025\/09\/13b2c346-bbbb-49ed-8a05-8ba7bd71a460_1024x683.webp\" alt=\"\" width=\"1024\" height=\"683\"  \/>Helsinki Shipyard. Image: Helsinki Shipyard.<\/p>\n<p>This is a reproduction of an article that first appeared on Sixty Degrees North. If you would like to read more posts by Peter Rybski, you can sign up for his blog\u00a0<a href=\"https:\/\/substack.com\/@peterrybski\" rel=\"nofollow noopener\" target=\"_blank\">here<\/a>.<\/p>\n<p>Despite my best efforts over the past several years, I still hear people incorrectly state that Finland does not build heavy icebreakers, or that they cannot build the types of icebreakers that the U.S. Coast Guard needs.<\/p>\n<p>Finland doesn\u2019t operate any truly polar icebreakers simply because they are not needed. Rather, Finland uses its icebreaker fleet to keep its ports open throughout the winter. As a nation of just 5.5 million people, it would be difficult to justify spending limited taxpayer dollars to include unnecessary capabilities in its own vessels.<\/p>\n<p>But Finnish companies have certainly designed and built such icebreakers for other customers. And now, we can see construction of a \u2018heavy\u2019 polar icebreaker in real time. As I reported earlier this year, Canadian shipbuilder Davie is\u00a0<a href=\"https:\/\/sixtydegreesnorth.substack.com\/p\/davie-awarded-contract-to-build-canadian?r=22534v\" rel=\"nofollow noopener\" target=\"_blank\">building a Polar Class 2 heavy polar icebreaker for the Canadian Coast Guard<\/a>. Part of the vessel will be built at Davie\u2019s Helsinki Shipyard, and part in Quebec.<\/p>\n<p>Production work\u00a0<a href=\"https:\/\/sixtydegreesnorth.substack.com\/p\/helsinki-shipyard-begins-construction?r=22534v\" rel=\"nofollow noopener\" target=\"_blank\">began in Finland on August 20th<\/a>, when Davie revealed this countdown until delivery (August 21, 2030). Yes, they fully intend to deliver a heavy polar icebreaker within five years, if not earlier (Davie claims it would take only 36 months if built entirely in Finland).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-110036 size-large\" src=\"https:\/\/www.arctictoday.com\/wp-content\/uploads\/2025\/09\/cf64cd86-0eea-457b-a449-7c40db8bef75_2377x1050-1024x452.webp\" alt=\"\" width=\"640\" height=\"283\"  \/>Countdown to delivery from August 20th, 2025. Source: Davie\/Youtube<\/p>\n<p>To demonstrate this capability in real time, I intend to track and document the work at Helsinki Shipyard over the next several years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-110038 size-large\" src=\"https:\/\/www.arctictoday.com\/wp-content\/uploads\/2025\/09\/1be60170-cc24-4dcc-a4e9-3b5bea66a8dd_4032x3024-1024x768.webp\" alt=\"\" width=\"640\" height=\"480\"  \/><\/p>\n<p>This block will become one of the machinery spaces for the Canadian Polar Icebreaker.<\/p>\n<p>Note that Helsinki Shipyard is but one of at least three locations where production work is ongoing. As I reported in July, <a href=\"https:\/\/sixtydegreesnorth.substack.com\/p\/canadian-shipbuilder-davie-buys-another\" rel=\"nofollow noopener\" target=\"_blank\">Davie bought a shipyard in Pori, Finland<\/a> mainly for its steel production facility.<\/p>\n<p>This facility, re-named Sata Shipbuilding, restores major block production capability to Helsinki Shipyard, which sold off its steel production facilities in Helsinki around twenty years ago. (Unlike many shipyards, Helsinki Shipyard occupies valuable real estate right in the heart of a city.) In the interim, Helsinki Shipyard relied on subcontractors in Poland and Lithuania for its block production. Now Sata Shipbuilding will fill this role.<\/p>\n<p>Work will also be occurring in Quebec.Here\u2019s a link to a recently released highlight video from the August 20, 2025 Steel Cutting Ceremony:<\/p>\n<p>Part of this too is to document that Helsinki Shipyard can actually build ships in the timelines that it claims (and has historically demonstrated). There is so much finger pointing and questioning going on right now as different shipyard vie for future icebreaking contracts. One of the best ways to sort out ground truth is to ignore what is being said and watch what is actually happening.<\/p>\n<p>You will also see me reporting on Rauma Marine Construction\u2019s (RMC) progress building the Finnish Navy Corvettes. I cannot report in the same detail, because Rauma is several hours away by car (whereas I can get to Helsinki Shipyard in just 20 minutes). From what I\u2019ve seen, RMC is doing fine work. At the moment, they have <a href=\"https:\/\/rmcfinland.fi\/three-vessels-simultaneously-in-production\/\" rel=\"nofollow noopener\" target=\"_blank\">three (of a planned four) Corvettes in simultaneous production<\/a>.<\/p>\n<p>Thanks to Davie\/Helsinki Shipyard for continuing to give me the access to document their project.<\/p>\n<p>Please let me know if you have any questions. If I can\u2019t answer them myself, I\u2019ll ask the folks at Helsinki Shipyard during my next visit.<\/p>\n<p>All the Best,<\/p>\n<p>PGR<\/p>\n<p>Peter Rybski is a retired U.S. Naval Officer who has been living in Finland since 2017. On his blog, he writes about subjects including military policies and capabilities, history and Nordic living.<\/p>\n","protected":false},"excerpt":{"rendered":"By Peter Rybski September 23, 2025 4191 Helsinki Shipyard. Image: Helsinki Shipyard. This is a reproduction of an&hellip;\n","protected":false},"author":2,"featured_media":10758,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[87],"tags":[158,113,8400],"class_list":["post-10757","post","type-post","status-publish","format-standard","has-post-thumbnail","category-helsinki","tag-finland","tag-helsinki","tag-icebreakers"],"share_on_mastodon":{"url":"","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/10757","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=10757"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/10757\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/10758"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=10757"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=10757"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=10757"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}