{"id":113612,"date":"2026-06-22T08:16:14","date_gmt":"2026-06-22T08:16:14","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/113612\/"},"modified":"2026-06-22T08:16:14","modified_gmt":"2026-06-22T08:16:14","slug":"db-to-begin-modernisation-of-the-berlin-hanover-corridor-this-fall","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/113612\/","title":{"rendered":"DB to begin modernisation of the Berlin\u2013Hanover corridor this fall"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-mh-magazine-content wp-image-139389\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/06\/DB-scaled-1-678x381.jpg\" alt=\"\" width=\"678\" height=\"381\"  \/>Photo: Deutsche Bahn AG \/ Michael Neuhaus<\/p>\n<p>Starting in October, DB InfraGO will begin modernisation work on the 221-km Berlin\u2013Hanover corridor, covering the route from the German capital to Lehrte, a railway hub located near Hanover.<\/p>\n<p>By the end of 2027, DB InfraGO will replace over 175 switches, 260 km of track, and 13 km of sound-absorbing panels. Additionally, 25 stations will be modernized, some of which will become fully accessible to people with limited mobility.<\/p>\n<p>The program also includes the rehabilitation of bridges, footbridges, and switch heating systems, as well as maintenance work on the power supply network and the signaling and traffic control systems. During track closures, sections of the \u201cfixed track\u201d infrastructure on the high-speed line near the city of Stendal will also be modernized.<\/p>\n<p>The work will be carried out in four main phases. The first phase will take place between October and December 2026, when the eastern section between Fallersleben and Berlin-Spandau will be completely closed. Subsequently, between December 2026 and October 2027, train service will be possible on certain sections via a single track, using the alternative Lehrter Stammbahn route.<\/p>\n<p>On the western section, between Lehrte and Fallersleben, a complete closure will be necessary between February and July 2027 to carry out complex modernization work. The project will conclude with another complete closure of the eastern section between October and December 2027.<\/p>\n<p>The eighth major rail infrastructure project<\/p>\n<p>The Lehrte\u2013Berlin route modernization project involves upgrading the infrastructure and electrifying the parallel Lehrter Stammbahn line, one of the largest electrification projects currently underway in Germany.<\/p>\n<p>The modernization of this important corridor is the eighth project involving the comprehensive renewal of a rail corridor in Germany. After the <a href=\"https:\/\/www.railwaypro.com\/wp\/special-offer-on-the-hamburg-berlin-route\/\" rel=\"nofollow noopener\" target=\"_blank\">Hamburg\u2013Berlin corridor<\/a>, this route is the second-longest corridor where the infrastructure will be modernized simultaneously through coordinated work on all rail systems.<\/p>\n<p>\u201cThis will allow trains to continue operating on this route during construction work on the high-speed line. Unlike the Hamburg\u2013Berlin project, we can reopen certain sections to traffic in phases. It\u2019s a good solution for our customers,\u201d said Gerd-Dietrich Bolte, a member of the DB InfraGO management team responsible for planning and infrastructure projects.<\/p>\n<p>The Berlin\u2013Hanover corridor is one of the most important links between Berlin and the state of North Rhine-Westphalia, with over 400 passenger trains and approximately 90 freight trains using it daily. Given the strategic importance of the route, DB InfraGO has collaborated with rail operators and regional transportation authorities to minimize the impact of the construction work on train traffic as much as possible.<\/p>\n<p>Share on: <br \/><a class=\"synved-social-button synved-social-button-share synved-social-size-32 synved-social-resolution-single synved-social-provider-facebook nolightbox\" data-provider=\"facebook\" target=\"_blank\" rel=\"nofollow noopener\" title=\"Share on Facebook\" href=\"https:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Fwww.railwaypro.com%2Fwp%2F%3Fp%3D139388&amp;t=DB%20to%20begin%20modernisation%20of%20the%20Berlin%E2%80%93Hanover%20corridor%20this%20fall&amp;s=100&amp;p[url]=https%3A%2F%2Fwww.railwaypro.com%2Fwp%2F%3Fp%3D139388&amp;p[images][0]=https%3A%2F%2Fwww.railwaypro.com%2Fwp%2Fwp-content%2Fuploads%2F2026%2F06%2FDB-scaled-1.jpg&amp;pDB to begin modernisation of the Berlin\u2013Hanover corridor this fall=DB%20to%20begin%20modernisation%20of%20the%20Berlin%E2%80%93Hanover%20corridor%20this%20fall\" style=\"font-size: 0px;width:32px;height:32px;margin:0;margin-bottom:5px;margin-right:5px\"><img loading=\"lazy\" decoding=\"async\" alt=\"Facebook\" title=\"Share on Facebook\" class=\"synved-share-image synved-social-image synved-social-image-share\" width=\"32\" height=\"32\" style=\"display: inline;width:32px;height:32px;margin: 0;padding: 0;border: none;box-shadow: none\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/06\/1782116173_965_facebook.png\"\/><\/a><a class=\"synved-social-button synved-social-button-share synved-social-size-32 synved-social-resolution-single synved-social-provider-twitter nolightbox\" data-provider=\"twitter\" target=\"_blank\" rel=\"nofollow noopener\" title=\"Share on Twitter\" href=\"http:\/\/twitter.com\/share?url=https%3A%2F%2Fwww.railwaypro.com%2Fwp%2F%3Fp%3D139388&amp;text=DB%20to%20begin%20modernisation%20of%20the%20Berlin%E2%80%93Hanover%20corridor%20this%20fall\" style=\"font-size: 0px;width:32px;height:32px;margin:0;margin-bottom:5px;margin-right:5px\"><img loading=\"lazy\" decoding=\"async\" alt=\"twitter\" title=\"Share on Twitter\" class=\"synved-share-image synved-social-image synved-social-image-share\" width=\"32\" height=\"32\" style=\"display: inline;width:32px;height:32px;margin: 0;padding: 0;border: none;box-shadow: none\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/06\/1782116173_934_twitter.png\"\/><\/a><a class=\"synved-social-button synved-social-button-share synved-social-size-32 synved-social-resolution-single synved-social-provider-linkedin nolightbox\" data-provider=\"linkedin\" target=\"_blank\" rel=\"nofollow noopener\" title=\"Share on Linkedin\" href=\"https:\/\/www.linkedin.com\/shareArticle?mini=true&amp;url=https%3A%2F%2Fwww.railwaypro.com%2Fwp%2F%3Fp%3D139388&amp;title=DB%20to%20begin%20modernisation%20of%20the%20Berlin%E2%80%93Hanover%20corridor%20this%20fall\" style=\"font-size: 0px;width:32px;height:32px;margin:0;margin-bottom:5px;margin-right:5px\"><img loading=\"lazy\" decoding=\"async\" alt=\"linkedin\" title=\"Share on Linkedin\" class=\"synved-share-image synved-social-image synved-social-image-share\" width=\"32\" height=\"32\" style=\"display: inline;width:32px;height:32px;margin: 0;padding: 0;border: none;box-shadow: none\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/06\/1782116174_678_linkedin.png\"\/><\/a><a class=\"synved-social-button synved-social-button-share synved-social-size-32 synved-social-resolution-single synved-social-provider-mail nolightbox\" data-provider=\"mail\" rel=\"nofollow\" title=\"Share by email\" href=\"mailto:?subject=DB%20to%20begin%20modernisation%20of%20the%20Berlin%E2%80%93Hanover%20corridor%20this%20fall&amp;body=Hey%20check%20this%20out:%20https%3A%2F%2Fwww.railwaypro.com%2Fwp%2F%3Fp%3D139388\" style=\"font-size: 0px;width:32px;height:32px;margin:0;margin-bottom:5px\"><img loading=\"lazy\" decoding=\"async\" alt=\"mail\" title=\"Share by email\" class=\"synved-share-image synved-social-image synved-social-image-share\" width=\"32\" height=\"32\" style=\"display: inline;width:32px;height:32px;margin: 0;padding: 0;border: none;box-shadow: none\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/06\/1782116174_487_mail.png\"\/><\/a>\t<script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"Photo: Deutsche Bahn AG \/ Michael Neuhaus Starting in October, DB InfraGO will begin modernisation work on the&hellip;\n","protected":false},"author":2,"featured_media":113613,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[99],"tags":[112,56895,23859,190,56896],"class_list":["post-113612","post","type-post","status-publish","format-standard","has-post-thumbnail","category-berlin","tag-berlin","tag-berlin-hanover-corridor","tag-db-infrago","tag-germany","tag-modernisation-works"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@dk\/116792772927142454","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/113612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=113612"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/113612\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/113613"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=113612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=113612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=113612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}